[{"data":1,"prerenderedAt":2022},["ShallowReactive",2],{"blog-post-fr-schema-unifilaire-construction-neuve-checklist":3,"blog-alternates-new-build-single-line-checklist":415},{"id":4,"title":5,"articleId":6,"body":7,"category":393,"date":394,"description":395,"extension":396,"lastUpdated":394,"locale":397,"meta":398,"navigation":228,"path":399,"publishDate":394,"readTime":400,"refreshInterval":401,"seo":402,"slug":403,"stem":404,"tags":405,"__hash__":414},"blog\u002Fblog\u002Fnew-build-single-line-checklist.fr.md","Schéma unifilaire d’une construction neuve : checklist RGIE fiable","new-build-single-line-checklist",{"type":8,"value":9,"toc":372},"minimark",[10,15,19,22,26,29,51,54,58,61,84,87,91,94,114,117,121,124,127,131,134,137,145,149,152,155,159,162,165,169,172,190,193,197,200,203,207,210,213,217,291,295,298,301,305,308,311,315,318,329,333,336,340,360,366],[11,12,14],"h2",{"id":13},"objectif-décrire-linstallation-réellement-exécutée","Objectif : décrire l'installation réellement exécutée",[16,17,18],"p",{},"Pour une nouvelle installation domestique, le responsable de l'exécution établit schéma unifilaire et plan de position. L'unifilaire n'est pas une esquisse que l'on oublie après le chantier. Avant le contrôle de conformité, il doit correspondre aux tableaux, protections, canalisations, circuits, récepteurs et sources réellement placés.",[16,20,21],{},"Cette checklist suit le RGIE Livre 1 V06 et vise le cas AC habituel. Les règles applicables depuis le 1er avril 2026 aux systèmes DC mis à la terre constituent un domaine distinct ; les rôles de conducteurs et symboles AC ne peuvent pas y être transposés au hasard.",[11,23,25],{"id":24},"_1-identifier-la-série-de-documents","1. Identifier la série de documents",[16,27,28],{},"Avant de tracer les circuits, indiquez :",[30,31,32,36,39,42,45,48],"ul",{},[33,34,35],"li",{},"numéro, version et date de version ;",[33,37,38],{},"adresse de l'installation ;",[33,40,41],{},"nom et qualité du responsable de l'exécution ;",[33,43,44],{},"numéro de TVA s'il s'applique ;",[33,46,47],{},"emplacements de date et signature ;",[33,49,50],{},"tension et nature du courant sur l'unifilaire.",[16,52,53],{},"Unifilaire et plan de position partagent la même version. Nom de fichier et date d'export ne suffisent pas après impression ou fusion de PDF. Ne préremplissez ni visa de l'inspecteur ni mention “conforme au RGIE” sur un document de travail. Le visa résulte du contrôle réel.",[11,55,57],{"id":56},"_2-établir-les-données-de-raccordement","2. Établir les données de raccordement",[16,59,60],{},"Commencez par les informations du branchement et la réalisation, pas par un modèle générique :",[30,62,63,66,69,72,75,78,81],{},[33,64,65],{},"alimentation mono- ou triphasée ;",[33,67,68],{},"tension nominale et AC\u002FDC ;",[33,70,71],{},"présence du neutre et du conducteur de protection ;",[33,73,74],{},"compteur et organisation du raccordement ;",[33,76,77],{},"protection de branchement et interrupteur-sectionneur principal ;",[33,79,80],{},"réseau et mise à la terre nécessaires à l'étude des protections ;",[33,82,83],{},"sources ou transformateurs supplémentaires.",[16,85,86],{},"Une prise 230 V ne prouve pas si le bâtiment reçoit 3×400 V+N ou 3×230 V. Une mauvaise hypothèse affecte pôles, neutre, câblage des DDR et récepteurs. Contrat, tableau et mesures doivent se confirmer.",[11,88,90],{"id":89},"_3-représenter-toute-la-chaîne-de-protection","3. Représenter toute la chaîne de protection",[16,92,93],{},"Incluez tableau principal et tableaux divisionnaires avec leurs alimentations. Chaque circuit terminal reste traçable depuis l'origine. Relevez selon le projet :",[30,95,96,99,102,105,108,111],{},[33,97,98],{},"interrupteur principal et protections amont ;",[33,100,101],{},"DDR avec type, courant différentiel assigné, courant assigné et comportement temporel pertinent ;",[33,103,104],{},"fusibles ou disjoncteurs avec calibre et courbe nécessaires ;",[33,106,107],{},"liaisons et tableaux secondaires utiles à la structure ;",[33,109,110],{},"appareils de réserve comme réserve, sans canalisation fictive ;",[33,112,113],{},"identification unique de chaque tableau et départ.",[16,115,116],{},"La série 300 mA puis 30 mA ne démontre pas la sélectivité. Forme d'onde, immunité renforcée et temporisation sont distinctes. Coordination des références, court-circuit et temps de coupure restent à calculer.",[11,118,120],{"id":119},"_4-référencer-chaque-circuit-terminal","4. Référencer chaque circuit terminal",[16,122,123],{},"Chaque circuit élémentaire reçoit une lettre majuscule. Points lumineux, prises et commandes sont numérotés depuis la protection amont. La même référence apparaît sur l'étiquette du tableau et au plan de position.",[16,125,126],{},"Pour chaque départ, identifiez : usage, charges, circuit éclairage\u002Fprises\u002Fmixte\u002Fdédié, appareils fixes, boîtes intermédiaires, DDR associé et concordance avec les deux plans. “Cuisine” ne distingue pas éclairage, prises de travail, lave-vaisselle et plaque lorsque ces fonctions utilisent plusieurs circuits.",[11,128,130],{"id":129},"_5-compléter-les-canalisations","5. Compléter les canalisations",[16,132,133],{},"La sous-section 3.1.2.2 exige nature, section, nombre de conducteurs et mode de pose. Ces données se rattachent au segment concerné. Après une dérivation, canalisation ou pose peuvent changer ; une seule mention au départ ne doit pas masquer la différence.",[16,135,136],{},"Le dimensionnement complet examine aussi courant d'emploi, calibre et capacité admissible, pose et groupement, température, longueur et chute de tension, court-circuit et boucle de défaut, sections minimales et conducteur de protection. Le tableau 4.11 donne des plafonds domestiques pour le cuivre, pas un calcul universel.",[16,138,139,140,144],{},"Une étiquette ",[141,142,143],"code",{},"XVB 3G2,5"," ne sert que si elle correspond au matériel posé. Confirmez avec ce qui reste visible et les documents d'exécution.",[11,146,148],{"id":147},"_6-ajouter-points-boîtes-et-commandes","6. Ajouter points, boîtes et commandes",[16,150,151],{},"L'unifilaire reprend prises, éclairages, interrupteurs, boîtes de connexion\u002Fdérivation et appareils fixes. Utilisez le tableau 2.23. Si aucun signe ne convient, définissez un symbole univoque dans la légende.",[16,153,154],{},"Différenciez lorsque nécessaire : prise simple\u002Fmultiple, avec terre, commandée ou données ; point lumineux et commande ; poussoir, relais, détecteur ou domotique ; appareil raccordé à demeure ou charge de prise ; boîte de connexion ou de dérivation. Un rectangle général bien libellé vaut mieux qu'une icône décorative non définie.",[11,156,158],{"id":157},"_7-ne-pas-oublier-les-sources","7. Ne pas oublier les sources",[16,160,161],{},"PV, onduleur, batterie, générateur ou transformateur appartiennent à la structure. Leurs caractéristiques figurent sur l'unifilaire ou dans le dossier. Pour une installation photovoltaïque domestique basse tension, la section 9.1.2 ajoute instructions d'exploitation et entretien, consignes de sécurité et références techniques du matériel installé.",[16,163,164],{},"Un symbole de panneau près du tableau ne décrit pas point de raccordement, protections et convertisseurs. Établissez quelles sources peuvent fournir, où elles se connectent et par quels appareils. Ne supposez pas qu'une batterie exporte. Les installations de sécurité ou critiques peuvent nécessiter plans et listes supplémentaires.",[11,166,168],{"id":167},"_8-synchroniser-le-plan-de-position","8. Synchroniser le plan de position",[16,170,171],{},"Placez chaque tableau, boîte, prise, lumière, commande, appareil fixe et source avec la même référence. Faites le contrôle dans les deux sens :",[173,174,175,178,181,184,187],"ol",{},[33,176,177],{},"retrouver chaque élément unifilaire sur le plan ;",[33,179,180],{},"retrouver chaque symbole spatial sur l'unifilaire ;",[33,182,183],{},"comparer lettre et numéro ;",[33,185,186],{},"confirmer niveau, local et tableau ;",[33,188,189],{},"inclure boîtes cachées et éléments extérieurs.",[16,191,192],{},"N'inventez pas un trajet de câble invisible. Le plan localise les éléments requis ; un plan de câbles ou de prises de terre supplémentaire ne se crée qu'avec des informations sûres.",[11,194,196],{"id":195},"_9-figer-létat-réel-avant-le-contrôle","9. Figer l'état réel avant le contrôle",[16,198,199],{},"La nouvelle installation subit le contrôle de conformité avant mise en usage. L'organisme compare exécution et plans et vérifie notamment terre, isolement, continuité et coordination des protections.",[16,201,202],{},"Avant le rendez-vous, confrontez chantier et dossier : référence ou calibre réellement posé, changement de câble, prise\u002Flumière\u002Fboîte ajoutée, circuit déplacé sous un autre DDR, étiquettes et versions. Corrigez installation et documents ensemble. On ne résout pas un défaut technique en modifiant seulement le dessin.",[11,204,206],{"id":205},"_10-organiser-dossier-et-évolutions","10. Organiser dossier et évolutions",[16,208,209],{},"Le dossier domestique contient les deux plans, rapports et, selon le cas, preuves et documents de modification. Le propriétaire le conserve en deux exemplaires et le transmet au nouveau propriétaire.",[16,211,212],{},"Après contrôle, une modification importante demande des plans actualisés. Les modifications non importantes suivent leur règle de description et le plan de position reste à jour. Conservez séparément version visée et révisions ultérieures.",[11,214,216],{"id":215},"vérification-finale","Vérification finale",[30,218,221,231,237,243,249,255,261,267,273,279,285],{"className":219},[220],"contains-task-list",[33,222,225,230],{"className":223},[224],"task-list-item",[226,227],"input",{"disabled":228,"type":229},true,"checkbox"," identité, version, adresse et responsable complets",[33,232,234,236],{"className":233},[224],[226,235],{"disabled":228,"type":229}," tension, courant et raccordement réels",[33,238,240,242],{"className":239},[224],[226,241],{"disabled":228,"type":229}," tous les tableaux, protections et sources représentés",[33,244,246,248],{"className":245},[224],[226,247],{"disabled":228,"type":229}," chaque circuit terminal identifié",[33,250,252,254],{"className":251},[224],[226,253],{"disabled":228,"type":229}," canalisation, section, conducteurs et pose indiqués",[33,256,258,260],{"className":257},[224],[226,259],{"disabled":228,"type":229}," prises, lumières, boîtes, commandes et appareils fixes présents",[33,262,264,266],{"className":263},[224],[226,265],{"disabled":228,"type":229}," symboles officiels ou légende sans ambiguïté",[33,268,270,272],{"className":269},[224],[226,271],{"disabled":228,"type":229}," références identiques au tableau et au plan de position",[33,274,276,278],{"className":275},[224],[226,277],{"disabled":228,"type":229}," modifications de chantier intégrées",[33,280,282,284],{"className":281},[224],[226,283],{"disabled":228,"type":229}," dossier PV et systèmes particuliers complété",[33,286,288,290],{"className":287},[224],[226,289],{"disabled":228,"type":229}," calculs et mesures réalisés hors du dessin",[11,292,294],{"id":293},"réconcilier-étude-chantier-et-mise-en-service","Réconcilier étude, chantier et mise en service",[16,296,297],{},"Un projet neuf évolue presque toujours entre offre et mise sous tension. Tenez une liste d'écarts avec repère prévu, réalisation effective, décision responsable, documents touchés et preuve encore manquante. Un tableau déplacé, une prise extérieure ajoutée, la puissance d'une pompe à chaleur modifiée ou un onduleur PV ajouté tardivement sont des cas typiques. Le schéma d'étude ne devient as-built que lorsque chaque ligne est résolue ou explicitement déclarée non exécutée.",[16,299,300],{},"Parcourez ensuite l'installation avec les étiquettes et les relevés de mise en service. Ne commandez pas les circuits en vous fiant seulement aux noms supposés des locaux. Comparez l'étiquette physique du tableau, le repère de l'unifilaire et le point du plan de position. Si conducteurs, protections ou réglages changent pendant la mise en service, corrigez les documents après intervention. Un PDF exporté tôt n'est pas une version finale parce que sa mise en page paraît achevée.",[11,302,304],{"id":303},"exemple-de-revue-dun-circuit-terminal-neuf","Exemple de revue d'un circuit terminal neuf",[16,306,307],{},"Pour un sèche-linge raccordé à demeure, « buanderie » ne suffit pas. Le dossier montre tableau d'origine et chaîne de protection, repère stable du circuit, canalisation avec nombre et section des conducteurs, puis appareil fixe terminal. Le même code est inscrit à l'emplacement réel sur le plan de position. Notice du fabricant, caractéristiques et réglages requis restent conservés séparément comme documentation technique.",[16,309,310],{},"Contrôlez ensuite les interfaces. Le chemin du conducteur de protection est-il traçable ? Le mode de raccordement réel correspond-il au dessin ? Une alimentation individuelle prévue est-elle devenue commune sur chantier ? Une boîte de dérivation manque-t-elle sur l'unifilaire ? Ces questions évitent qu'un jeu formellement complet ne conserve un état d'étude dépassé.",[11,312,314],{"id":313},"remettre-une-série-documentaire-maîtrisée","Remettre une série documentaire maîtrisée",[16,316,317],{},"Identifiez l'édition finale par projet, adresse, indice et date d'export. Regroupez unifilaire, plan de position, rapport de contrôle et documents techniques utiles dans un dossier ordonné. Séparez clairement copies de travail et versions remplacées. Le propriétaire doit savoir quels fichiers sont actuels et que chaque transformation ultérieure impose une nouvelle mise à jour.",[16,319,320,321,328],{},"La ",[322,323,327],"a",{"href":324,"rel":325},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[326],"nofollow","page officielle du SPF Économie sur le contrôle domestique"," énumère les plans à fournir au minimum et résume leur contenu. Elle ne remplace ni les prescriptions détaillées du RGIE Livre 1 V06 ni l'appréciation compétente du projet concret.",[11,330,332],{"id":331},"préparer-avec-planelec","Préparer avec PlanElec",[16,334,335],{},"PlanElec peut regrouper fond de plan, topologie et données des tableaux, exporter les deux plans en PDF et exécuter un auto-contrôle indicatif des règles prises en charge. Il ne remplace ni vérification du raccordement, ni calcul de câble, ni relevé de chantier ou mesure. Un contrôle logiciel sans erreur n'est pas une déclaration de conformité ; l'organisme agréé réalise le contrôle officiel.",[11,337,339],{"id":338},"guides-liés","Guides liés",[30,341,342,348,354],{},[33,343,344],{},[322,345,347],{"href":346},"\u002Ffr\u002Fblog\u002Fschema-unifilaire-vs-plan-situation","Coordonner unifilaire et plan de position",[33,349,350],{},[322,351,353],{"href":352},"\u002Ffr\u002Fblog\u002Fsymboles-electriques-rgie","Comprendre les symboles RGIE",[33,355,356],{},[322,357,359],{"href":358},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Préparer le contrôle électrique",[16,361,362],{},[322,363,365],{"href":364},"\u002Ffr","Démarrer un projet neuf dans PlanElec →",[16,367,368],{},[369,370,371],"em",{},"Référence : RGIE Livre 1 V06, notamment chapitre 2.13, section 3.1.2, chapitre 6.4 et section 9.1.2. Le texte officiel et l'installation exécutée restent déterminants.",{"title":373,"searchDepth":374,"depth":374,"links":375},"",2,[376,377,378,379,380,381,382,383,384,385,386,387,388,389,390,391,392],{"id":13,"depth":374,"text":14},{"id":24,"depth":374,"text":25},{"id":56,"depth":374,"text":57},{"id":89,"depth":374,"text":90},{"id":119,"depth":374,"text":120},{"id":129,"depth":374,"text":130},{"id":147,"depth":374,"text":148},{"id":157,"depth":374,"text":158},{"id":167,"depth":374,"text":168},{"id":195,"depth":374,"text":196},{"id":205,"depth":374,"text":206},{"id":215,"depth":374,"text":216},{"id":293,"depth":374,"text":294},{"id":303,"depth":374,"text":304},{"id":313,"depth":374,"text":314},{"id":331,"depth":374,"text":332},{"id":338,"depth":374,"text":339},"tutorial","2026-08-29","Du raccordement aux protections, canalisations, références et plan de position : checklist complète d’un projet domestique neuf selon le RGIE Livre 1 V06.","md","fr",{},"\u002Fblog\u002Fnew-build-single-line-checklist.fr","11 min",12,{"title":5,"description":395},"schema-unifilaire-construction-neuve-checklist","blog\u002Fnew-build-single-line-checklist.fr",[406,407,408,409,410,411,412,413],"AREI","RGIE","construction neuve","schéma unifilaire","checklist","plan de position","contrôle de conformité","Belgique","RmEHvd7IooT1ovGWXUMeyvEXFLFopu17OAL8Zmsbwo0",[416,918,1326,1586],{"id":417,"title":418,"articleId":6,"body":419,"category":393,"date":394,"description":903,"extension":396,"lastUpdated":394,"locale":904,"meta":905,"navigation":228,"path":906,"publishDate":394,"readTime":400,"refreshInterval":401,"seo":907,"slug":908,"stem":909,"tags":910,"__hash__":917},"blog\u002Fblog\u002Fnew-build-single-line-checklist.de.md","Eindrahtschema für Neubau: belastbare AREI-Checkliste",{"type":8,"value":420,"toc":884},[421,425,428,431,435,438,461,464,467,471,474,500,503,507,510,530,533,537,540,543,563,566,570,573,576,596,602,606,609,612,632,635,639,642,645,648,652,659,662,679,682,686,689,692,712,715,719,722,725,729,804,808,811,814,818,821,824,828,831,839,843,846,849,853,873,879],[11,422,424],{"id":423},"ziel-ein-schema-das-die-ausgeführte-anlage-beschreibt","Ziel: ein Schema, das die ausgeführte Anlage beschreibt",[16,426,427],{},"Bei einer neuen häuslichen Elektroinstallation erstellt der für die Ausführung der Arbeit Verantwortliche Eindrahtschema und Situationsplan. Das Eindrahtschema ist kein früher Entwurf, der nach der Baustelle unverändert bleibt. Vor der Konformitätsprüfung muss es mit Verteilern, Schutzgeräten, Leitungen, Stromkreisen, Verbrauchern und Quellen des tatsächlich ausgeführten Zustands übereinstimmen.",[16,429,430],{},"Diese Checkliste behandelt häusliche Anlagen nach AREI\u002FRGIE Buch 1 Version 06. Sie ist auf den üblichen Wechselstromfall ausgerichtet. Die seit 1. April 2026 geltenden Regeln für geerdete Gleichstromsysteme bilden einen zusätzlichen Fachbereich und dürfen nicht durch Übertragen von AC-Rollen oder Symbolen improvisiert werden.",[11,432,434],{"id":433},"_1-verantwortlichkeit-und-dokumentkopf-festlegen","1. Verantwortlichkeit und Dokumentkopf festlegen",[16,436,437],{},"Bevor Stromkreise gezeichnet werden, braucht der Dokumentensatz eine eindeutige Identität:",[30,439,440,443,446,449,452,455,458],{},[33,441,442],{},"Nummer des Dokuments;",[33,444,445],{},"Fassung und Datum dieser Fassung;",[33,447,448],{},"Adresse der Installation;",[33,450,451],{},"Name und Eigenschaft des für die Ausführung Verantwortlichen;",[33,453,454],{},"Mehrwertsteuernummer, falls anwendbar;",[33,456,457],{},"vorgesehene Felder für Datum und Unterschriften;",[33,459,460],{},"Spannung und Stromart auf dem Eindrahtschema.",[16,462,463],{},"Eindrahtschema und Situationsplan sollten dieselbe Fassung bezeichnen. Der Dateiname allein reicht nicht, weil Ausdrucke oder zusammengeführte PDFs sonst ihren Stand verlieren. Ein Exportdatum ist ebenfalls nicht automatisch das Datum, an dem die Anlage fachlich aufgenommen wurde.",[16,465,466],{},"Die spätere Unterschrift oder Visierung der zugelassenen Stelle entsteht nur im Kontrollverfahren bei entsprechendem Ergebnis. Tragen Sie keine vorweggenommene Prüferfreigabe oder Formulierung „AREI-konform“ in einen Arbeitsstand ein.",[11,468,470],{"id":469},"_2-versorgung-und-anschlussdaten-klären","2. Versorgung und Anschlussdaten klären",[16,472,473],{},"Das Schema beginnt mit der realen Versorgung. Ermitteln Sie nicht aus einem Standardmuster, sondern anhand von Anschlussdaten und Ausführung:",[30,475,476,479,482,485,488,491,494,497],{},[33,477,478],{},"ein- oder dreiphasige Versorgung;",[33,480,481],{},"Nennspannung und Stromart;",[33,483,484],{},"vorhandener Neutral- und Schutzleiter;",[33,486,487],{},"Anschluss- und Zähleranordnung;",[33,489,490],{},"Nennwert des Anschlussschutzes;",[33,492,493],{},"Haupt-Lasttrennschalter;",[33,495,496],{},"Netz- und Erdungskonzept, soweit für Planung und Schutz erforderlich;",[33,498,499],{},"weitere Quellen wie PV-Wechselrichter oder Transformator.",[16,501,502],{},"Ein belgischer Anschluss ist nicht allein anhand der Steckdose als 230\u002F400-V-Sternnetz oder 3×230-V-Netz erkennbar. Falsche Annahmen wirken sich auf Polzahl, Neutralleiter, RCD-Verdrahtung und Verbraucher aus. Anschlussvertrag, Verteileraufbau und Messung müssen zusammenpassen.",[11,504,506],{"id":505},"_3-jeden-verteiler-als-teil-der-schutzkette-erfassen","3. Jeden Verteiler als Teil der Schutzkette erfassen",[16,508,509],{},"Nehmen Sie Haupt- und Unterverteiler mit ihrer Einspeisung und Verbindung auf. Der elektrische Pfad soll vom Speisepunkt bis zu jedem Endstromkreis nachvollziehbar sein. Dazu gehören je nach Anlage:",[30,511,512,515,518,521,524,527],{},[33,513,514],{},"Hauptschalter und vorgeschaltete Schutzorgane;",[33,516,517],{},"Fehlerstrom-Schutzeinrichtungen mit Typ, Bemessungsdifferenzstrom, Bemessungsstrom und relevanter Charakteristik;",[33,519,520],{},"Sicherungen oder Leitungsschutzschalter mit Nennstrom und erforderlicher Kennlinie;",[33,522,523],{},"Sammelschienen, Verbindungen und Unterverteilungen, soweit sie für die Struktur notwendig sind;",[33,525,526],{},"Reserveschalter als Reserve, nicht als scheinbar angeschlossener Stromkreis;",[33,528,529],{},"eindeutige Bezeichnung jedes Verteilers und Abgangs.",[16,531,532],{},"Die bloße Folge 300 mA und 30 mA beweist keine Selektivität. Wellenformtyp, erhöhte Immunität und zeitliche Selektivität sind getrennte Eigenschaften. Herstellerkoordination, Kurzschlussbedingungen und Abschaltzeiten bleiben Teil der fachlichen Planung.",[11,534,536],{"id":535},"_4-endstromkreise-eindeutig-benennen","4. Endstromkreise eindeutig benennen",[16,538,539],{},"Jeder Elementarstromkreis erhält einen Großbuchstaben. Verwenden Sie eine stabile Reihenfolge und dieselbe Bezeichnung am Verteiler. Innerhalb des Stromkreises werden Lichtpunkte, Steckdosen und Steuerwerke ab dem vorgeschalteten Überstromschutz fortlaufend nummeriert.",[16,541,542],{},"Für jeden Abgang sollte die Aufnahme mindestens beantworten:",[30,544,545,548,551,554,557,560],{},[33,546,547],{},"Welche Nutzung und welche Verbraucher gehören dazu?",[33,549,550],{},"Handelt es sich um Licht, Steckdosen, Mischkreis oder eigenen Gerätekreis?",[33,552,553],{},"Welche ortsfesten Geräte sind angeschlossen?",[33,555,556],{},"Gibt es Verbindungs- oder Abzweigdosen?",[33,558,559],{},"Welche RCD-Gruppe schützt den Kreis?",[33,561,562],{},"Stimmen Schema, Verteileretikett und Situationsplan überein?",[16,564,565],{},"Eine Bezeichnung „Küche“ ist oft zu ungenau, wenn Beleuchtung, Arbeitssteckdosen, Geschirrspüler und Kochfeld getrennt versorgt werden. Namen unterstützen die Orientierung; die elektrische Referenz muss eindeutig bleiben.",[11,567,569],{"id":568},"_5-leitungsdaten-vollständig-angeben","5. Leitungsdaten vollständig angeben",[16,571,572],{},"Unterabschnitt 3.1.2.2 fordert Typ, Querschnitt, Anzahl Leiter und Verlegeart. Erfassen Sie diese Daten pro relevantem Leitungsabschnitt. Ein Stromkreis kann nach einer Abzweig- oder Verbindungsdose unterschiedliche Segmente haben; ein einziger Kabeltext am Anfang darf solche Unterschiede nicht verschleiern.",[16,574,575],{},"Prüfen Sie zusätzlich, ohne die Prüfung mit dem Schema zu verwechseln:",[30,577,578,581,584,587,590,593],{},[33,579,580],{},"Belastungsstrom, Nennstrom des Schutzorgans und zulässige Strombelastbarkeit;",[33,582,583],{},"Verlegeart, Häufung, Temperatur und Dämmung;",[33,585,586],{},"Leitungslänge und Spannungsfall;",[33,588,589],{},"Kurzschluss- und Fehlerschleifenbedingungen;",[33,591,592],{},"Mindestquerschnitte und besondere Stromkreisregeln;",[33,594,595],{},"Übereinstimmung von Schutzleiterangabe und tatsächlich verwendeter Leitung.",[16,597,598,599,601],{},"Tabelle 4.11 liefert für häusliche Kupferleiter Obergrenzen zwischen Querschnitt und Schutzorgan, aber keine vollständige Dimensionierung. Ein sauberer Text wie ",[141,600,143],{}," kann technisch falsch sein, wenn die reale Leitung oder Auslegung davon abweicht.",[11,603,605],{"id":604},"_6-verbraucher-dosen-und-steuerungen-aufnehmen","6. Verbraucher, Dosen und Steuerungen aufnehmen",[16,607,608],{},"Das Eindrahtschema enthält Steckdosen, Lichtpunkte, Schalter, Verbindungs- und Abzweigdosen sowie ortsfeste Maschinen und Geräte. Verwenden Sie die Symbole aus Tabelle 2.23; fehlt ein Zeichen, darf eine eindeutig definierte Legende ergänzt werden.",[16,610,611],{},"Unterscheiden Sie, wo es fachlich relevant ist:",[30,613,614,617,620,623,626,629],{},[33,615,616],{},"Einzel- und Mehrfachsteckdose;",[33,618,619],{},"Schutzkontakt, geschaltete oder spezielle Steckdose;",[33,621,622],{},"Lichtpunkt und tatsächliche Schaltfunktion;",[33,624,625],{},"Taster, Relais, Bewegungsmelder oder Domotiksteuerung;",[33,627,628],{},"fest angeschlossenes Gerät und gewöhnliche Steckdosenlast;",[33,630,631],{},"Verbindungsdose und Abzweigdose.",[16,633,634],{},"Ein allgemeines Geräte-Rechteck mit Text kann sinnvoller sein als ein erfundenes detailliertes Piktogramm. Entscheidend sind eindeutige Funktion, Referenz und Anschluss.",[11,636,638],{"id":637},"_7-quellen-und-besondere-anlagenteile-nicht-vergessen","7. Quellen und besondere Anlagenteile nicht vergessen",[16,640,641],{},"PV, Wechselrichter, Batterie, Generator oder andere Quelle sind keine Randnotiz. Quellen werden im Eindrahtschema dargestellt; ihre Eigenschaften stehen dort oder in der Anlagenakte. Bei einer häuslichen Niederspannungs-PV-Anlage umfasst die Akte zusätzlich Betriebsanleitungen, Sicherheitshinweise sowie technische Referenzen und Eigenschaften der installierten Betriebsmittel.",[16,643,644],{},"Ein PV-Pfeil am Hauptverteiler reicht daher nicht. Anschlussstelle, Schutzkette und relevante Komponenten müssen nachvollziehbar sein. Ob eine Batterie Energie exportieren kann oder nur hinter einem Wechselrichter arbeitet, darf nicht geraten werden. Nicht vollständig unterstützte Sonderquellen benötigen fachliche Zusatzdokumentation.",[16,646,647],{},"Falls Sicherheits- oder kritische Anlagen vorhanden sind, können ergänzende Listen und Pläne erforderlich sein. Ihre Quellen, Stromkreise und Verbraucher werden eindeutig identifiziert.",[11,649,651],{"id":650},"_8-situationsplan-synchronisieren","8. Situationsplan synchronisieren",[16,653,654,655,658],{},"Jeder auf dem Eindrahtschema dargestellte Verteiler, jede relevante Dose, Steckdose, Leuchte, Steuerung, ortsfeste Maschine und Quelle erhält die korrespondierende räumliche Position. Die Referenz ",[141,656,657],{},"C3"," meint in beiden Dokumenten dasselbe Element.",[16,660,661],{},"Führen Sie einen Abgleich in beide Richtungen durch:",[173,663,664,667,670,673,676],{},[33,665,666],{},"jedes Schemaelement im Situationsplan suchen;",[33,668,669],{},"jedes Plansymbol im Eindrahtschema suchen;",[33,671,672],{},"Stromkreisletter und Nummer vergleichen;",[33,674,675],{},"Raum, Geschoss und Verteilerzuordnung prüfen;",[33,677,678],{},"verdeckte Dosen und Außenbereiche nicht übersehen.",[16,680,681],{},"Unbekannte Kabelwege werden nicht erfunden. Der Situationsplan zeigt die Lage der geforderten Komponenten; zusätzliche Kabel- oder Erdungspläne werden nur mit belastbaren Daten erstellt.",[11,683,685],{"id":684},"_9-vor-der-konformitätsprüfung-den-ist-stand-einfrieren","9. Vor der Konformitätsprüfung den Ist-Stand einfrieren",[16,687,688],{},"Vor Ingebrauchnahme wird die neue Anlage der Konformitätsprüfung unterzogen. Die zugelassene Stelle prüft unter anderem die Ausführung gegen Eindrahtschema und Situationsplan sowie Mess- und Schutzaspekte wie Erdungswiderstand, Isolationsniveau, Schutzleiterdurchgängigkeit und das Zusammenspiel der Schutzgeräte.",[16,690,691],{},"Kurz vor dem Termin sollten deshalb nicht nur Schreibfehler, sondern reale Abweichungen gesucht werden:",[30,693,694,697,700,703,706,709],{},[33,695,696],{},"Wurde auf der Baustelle ein anderer Automat oder RCD eingebaut?",[33,698,699],{},"Ist ein Kabelquerschnitt oder Leitungstyp geändert worden?",[33,701,702],{},"Kam eine Steckdose, Leuchte oder Dose hinzu?",[33,704,705],{},"Wurde ein Stromkreis auf einen anderen RCD umgeklemmt?",[33,707,708],{},"Stimmen Verteilerbeschriftung und Referenzen?",[33,710,711],{},"Sind alle Dokumentseiten derselben Fassung zugeordnet?",[16,713,714],{},"Korrigieren Sie den Anlagenstand und die Dokumente gemeinsam. Ein Plan darf nicht nachträglich so angepasst werden, dass ein technischer Fehler nur grafisch verschwindet.",[11,716,718],{"id":717},"_10-dossier-und-künftige-änderungen-organisieren","10. Dossier und künftige Änderungen organisieren",[16,720,721],{},"Zum häuslichen Dossier gehören nicht nur die zwei Pläne, sondern auch Berichte, gegebenenfalls Nachweise und spätere Änderungsunterlagen. Der Eigentümer bewahrt die Akte in zweifacher Ausfertigung auf und übermittelt sie bei einem Eigentümerwechsel.",[16,723,724],{},"Nach der Freigabe bleibt das Schema kein Archivstück ohne Pflege. Wesentliche Änderungen erfordern aktualisierte Schemata und Pläne; nicht wesentliche Änderungen werden nach den AREI-Regeln beschrieben, und der Situationsplan wird auf dem aktuellen Zustand gehalten. Bewahren Sie den geprüften Stand und jede spätere Version nachvollziehbar auf.",[11,726,728],{"id":727},"kompakte-endkontrolle","Kompakte Endkontrolle",[30,730,732,738,744,750,756,762,768,774,780,786,792,798],{"className":731},[220],[33,733,735,737],{"className":734},[224],[226,736],{"disabled":228,"type":229}," Dokumentnummer, Version, Datum, Adresse und Verantwortlicher vollständig",[33,739,741,743],{"className":740},[224],[226,742],{"disabled":228,"type":229}," Spannung, Stromart und reale Anschlusskonfiguration angegeben",[33,745,747,749],{"className":746},[224],[226,748],{"disabled":228,"type":229}," alle Verteiler und Quellen enthalten",[33,751,753,755],{"className":752},[224],[226,754],{"disabled":228,"type":229}," RCD- und Überstromschutz mit Eigenschaften erfasst",[33,757,759,761],{"className":758},[224],[226,760],{"disabled":228,"type":229}," jeder Endstromkreis eindeutig bezeichnet",[33,763,765,767],{"className":764},[224],[226,766],{"disabled":228,"type":229}," Leitungstyp, Querschnitt, Leiterzahl und Verlegeart vollständig",[33,769,771,773],{"className":770},[224],[226,772],{"disabled":228,"type":229}," Steckdosen, Lichtpunkte, Dosen, Schalter und feste Geräte vorhanden",[33,775,777,779],{"className":776},[224],[226,778],{"disabled":228,"type":229}," Symbole entsprechen Tabelle 2.23 oder sind eindeutig in der Legende definiert",[33,781,783,785],{"className":782},[224],[226,784],{"disabled":228,"type":229}," Referenzen stimmen mit Verteiler und Situationsplan überein",[33,787,789,791],{"className":788},[224],[226,790],{"disabled":228,"type":229}," Baustellenänderungen in beiden Dokumenten nachgeführt",[33,793,795,797],{"className":794},[224],[226,796],{"disabled":228,"type":229}," Zusatzunterlagen für PV, Sicherheits- oder Sonderanlagen ergänzt",[33,799,801,803],{"className":800},[224],[226,802],{"disabled":228,"type":229}," fachliche Dimensionierung und Messungen außerhalb des Schemas geprüft",[11,805,807],{"id":806},"abgleich-zwischen-planung-baustelle-und-inbetriebnahme","Abgleich zwischen Planung, Baustelle und Inbetriebnahme",[16,809,810],{},"Ein Neubau verändert sich zwischen Ausschreibung und Inbetriebnahme fast immer. Führen Sie deshalb eine offene Abweichungsliste: geplante Referenz, ausgeführte Änderung, verantwortliche Entscheidung, betroffene Pläne und noch fehlender Nachweis. Beispiele sind ein versetzter Verteiler, eine zusätzliche Außensteckdose, eine geänderte Wärmepumpenleistung oder ein später ergänzter PV-Wechselrichter. Erst wenn jede Zeile erledigt oder ausdrücklich als nicht ausgeführt markiert ist, wird aus dem Planungsschema ein Ist-Schema.",[16,812,813],{},"Gehen Sie danach gemeinsam mit Beschriftung und Messunterlagen durch die Anlage. Betätigen Sie Stromkreise nicht allein anhand vermuteter Raumnamen. Vergleichen Sie die tatsächliche Kennzeichnung im Verteiler mit der Referenz im Schema und dem Punkt im Situationsplan. Werden während der Inbetriebnahme Leiter, Schutzorgane oder Einstellungen geändert, muss die Dokumentation nachgezogen werden; ein früher PDF-Export ist keine belastbare Schlussfassung.",[11,815,817],{"id":816},"beispielprüfung-eines-neuen-endstromkreises","Beispielprüfung eines neuen Endstromkreises",[16,819,820],{},"Für einen fest angeschlossenen Trockner reicht die Zeile „Waschküche“ nicht. Die Akte sollte erkennen lassen, aus welchem Verteiler und hinter welchen Schutzgeräten der Stromkreis kommt, wie er referenziert ist, welche Leitung mit welchen Leitern und welchem Querschnitt verwendet wurde und welches feste Gerät am Ende liegt. Auf dem Situationsplan steht dieselbe Referenz an der tatsächlichen Anschlussstelle. Geräteanleitung, Bemessungsdaten und gegebenenfalls erforderliche Einstellungen werden getrennt als technische Unterlage aufbewahrt.",[16,822,823],{},"Prüfen Sie anschließend die Schnittstellen: Ist der Schutzleiterpfad nachvollziehbar? Stimmt die Geräteanschlussart mit der Zeichnung überein? Wurde aus einer vorgesehenen Einzelversorgung während des Baus eine gemeinsam genutzte Leitung? Gibt es eine Abzweigdose, die im Schema fehlt? Solche Fragen verhindern, dass formal vollständige Blätter einen inzwischen überholten Planungsstand zeigen.",[11,825,827],{"id":826},"übergabe-als-kontrollierter-dokumentensatz","Übergabe als kontrollierter Dokumentensatz",[16,829,830],{},"Benennen Sie die finale Ausgabe eindeutig, beispielsweise mit Projekt, Adresse, Revisionsstand und Exportdatum. Legen Sie Eindrahtschema, Situationsplan, Kontrollbericht und technische Unterlagen in einer geordneten Akte ab. Arbeitskopien und frühere Revisionen bleiben getrennt als Historie gekennzeichnet. Der Eigentümer muss wissen, welche Dateien aktuell sind und dass spätere Änderungen erneut dokumentiert werden müssen.",[16,832,833,834,838],{},"Die ",[322,835,837],{"href":324,"rel":836},[326],"amtliche FÖD-Seite zur Kontrolle von Wohnanlagen"," nennt die mindestens vorzulegenden Pläne und beschreibt deren Inhalt. Sie ersetzt nicht die Detailvorgaben von AREI Buch 1 V06 oder die fachliche Auslegung für das konkrete Projekt.",[11,840,842],{"id":841},"vorbereitung-mit-planelec","Vorbereitung mit PlanElec",[16,844,845],{},"PlanElec kann Grundriss, elektrische Topologie und Verteilerdaten in einem Projekt führen, beide Pläne als PDF exportieren und einen orientierenden Selbstcheck für unterstützte Regeln ausführen. Das reduziert Medienbrüche, ersetzt aber keine Anschlussklärung, Leitungsberechnung, Baustellenaufnahme oder Messung.",[16,847,848],{},"Ein fehlerfreier Softwarecheck bedeutet nicht, dass die Anlage AREI-konform ist. Lassen Sie Entwurf und Ausführung fachlich prüfen und die offizielle Konformitätsprüfung von einer zugelassenen Stelle durchführen.",[11,850,852],{"id":851},"weiterführende-artikel","Weiterführende Artikel",[30,854,855,861,867],{},[33,856,857],{},[322,858,860],{"href":859},"\u002Fde\u002Fblog\u002Feindrahtschema-vs-situationsplan","Eindrahtschema und Situationsplan richtig verbinden",[33,862,863],{},[322,864,866],{"href":865},"\u002Fde\u002Fblog\u002Farei-elektrosymbole-uebersicht","AREI-Elektrosymbole im Überblick",[33,868,869],{},[322,870,872],{"href":871},"\u002Fde\u002Fblog\u002Felektrische-abnahme","Stromabnahme in Belgien vorbereiten",[16,874,875],{},[322,876,878],{"href":877},"\u002Fde","Neubauprojekt in PlanElec anlegen und Pläne vorbereiten →",[16,880,881],{},[369,882,883],{},"Regelgrundlage: AREI\u002FRGIE Buch 1 V06, insbesondere Kapitel 2.13, Abschnitt 3.1.2, Kapitel 6.4 und Abschnitt 9.1.2. Die amtliche Fassung und die konkrete Anlage sind maßgeblich.",{"title":373,"searchDepth":374,"depth":374,"links":885},[886,887,888,889,890,891,892,893,894,895,896,897,898,899,900,901,902],{"id":423,"depth":374,"text":424},{"id":433,"depth":374,"text":434},{"id":469,"depth":374,"text":470},{"id":505,"depth":374,"text":506},{"id":535,"depth":374,"text":536},{"id":568,"depth":374,"text":569},{"id":604,"depth":374,"text":605},{"id":637,"depth":374,"text":638},{"id":650,"depth":374,"text":651},{"id":684,"depth":374,"text":685},{"id":717,"depth":374,"text":718},{"id":727,"depth":374,"text":728},{"id":806,"depth":374,"text":807},{"id":816,"depth":374,"text":817},{"id":826,"depth":374,"text":827},{"id":841,"depth":374,"text":842},{"id":851,"depth":374,"text":852},"Vom Netzanschluss über Schutzgeräte und Leitungen bis zur gemeinsamen Version mit dem Situationsplan: vollständige Checkliste nach AREI Buch 1 V06.","de",{},"\u002Fblog\u002Fnew-build-single-line-checklist.de",{"title":418,"description":903},"eindrahtschema-neubau-checkliste","blog\u002Fnew-build-single-line-checklist.de",[406,407,911,912,913,914,915,916],"Neubau","Eindrahtschema","Checkliste","Situationsplan","Konformitätsprüfung","Belgien","MIksA2lDcND9MDC1lEIsMrGC75xU8OzRBgd9VBM579Q",{"id":919,"title":920,"articleId":6,"body":921,"category":393,"date":394,"description":1312,"extension":396,"lastUpdated":394,"locale":1313,"meta":1314,"navigation":228,"path":1315,"publishDate":394,"readTime":400,"refreshInterval":401,"seo":1316,"slug":1317,"stem":1318,"tags":1319,"__hash__":1325},"blog\u002Fblog\u002Fnew-build-single-line-checklist.en.md","Single-Line Diagram for a New Build: A Reliable AREI Checklist",{"type":8,"value":922,"toc":1293},[923,927,930,933,937,940,960,963,967,970,993,996,1000,1003,1023,1026,1030,1033,1036,1040,1043,1046,1053,1057,1060,1063,1067,1070,1073,1077,1080,1097,1100,1104,1107,1110,1130,1133,1137,1140,1143,1147,1216,1220,1223,1226,1230,1233,1236,1240,1243,1251,1255,1258,1262,1282,1288],[11,924,926],{"id":925},"objective-document-the-installation-that-was-actually-built","Objective: document the installation that was actually built",[16,928,929],{},"For a new domestic electrical installation, the person responsible for the work prepares a single-line diagram and position plan. The single-line diagram is not an early design that can be left unchanged after construction. Before conformity inspection, it must match the installed boards, protective devices, wiring, circuits, loads and sources.",[16,931,932],{},"This checklist follows AREI\u002FRGIE Book 1 V06 and focuses on the usual AC case. The provisions for earthed DC systems applicable from 1 April 2026 form a separate specialist area; AC conductor roles and symbols must not be improvised for DC.",[11,934,936],{"id":935},"_1-give-the-document-set-an-identity","1. Give the document set an identity",[16,938,939],{},"Record before drawing:",[30,941,942,945,948,951,954,957],{},[33,943,944],{},"document number, version and version date;",[33,946,947],{},"installation address;",[33,949,950],{},"name and capacity of the person responsible for execution;",[33,952,953],{},"VAT number where applicable;",[33,955,956],{},"fields for dates and signatures;",[33,958,959],{},"voltage and current type on the single-line diagram.",[16,961,962],{},"The single-line and position plans should carry the same version. A filename or export timestamp alone is lost when pages are printed or merged. A working draft must not contain a pre-emptive inspector endorsement or “AREI-compliant” statement. Endorsement belongs to the actual inspection procedure.",[11,964,966],{"id":965},"_2-establish-the-real-supply","2. Establish the real supply",[16,968,969],{},"Start from connection data and construction, not a template:",[30,971,972,975,978,981,984,987,990],{},[33,973,974],{},"single- or three-phase supply;",[33,976,977],{},"nominal voltage and AC\u002FDC;",[33,979,980],{},"neutral and protective-conductor arrangement;",[33,982,983],{},"meter and service connection;",[33,985,986],{},"service protective rating and main isolating switch;",[33,988,989],{},"network and earthing arrangement needed for the protection design;",[33,991,992],{},"additional sources, inverters or transformers.",[16,994,995],{},"A Belgian 230 V socket does not identify whether the building has 3×400 V+N or 3×230 V. A false assumption affects pole count, neutral conductors, RCD wiring and loads. Connection agreement, board construction and measurements must agree.",[11,997,999],{"id":998},"_3-represent-the-full-protective-chain","3. Represent the full protective chain",[16,1001,1002],{},"Include main and sub-distribution boards with their supplies. Every final circuit should be traceable from the origin. Record as applicable:",[30,1004,1005,1008,1011,1014,1017,1020],{},[33,1006,1007],{},"main switch and upstream protective devices;",[33,1009,1010],{},"RCD waveform type, rated residual current, rated current and relevant timing characteristic;",[33,1012,1013],{},"fuses or circuit breakers with rating and required characteristic;",[33,1015,1016],{},"connections and downstream boards needed to explain the structure;",[33,1018,1019],{},"spare breakers as spares, without fictitious outgoing cable;",[33,1021,1022],{},"a unique label for every board and outgoing way.",[16,1024,1025],{},"Putting 300 mA upstream of 30 mA does not prove selectivity. Waveform type, enhanced immunity and time delay are different properties. Product coordination, short-circuit conditions and disconnection times remain design checks.",[11,1027,1029],{"id":1028},"_4-give-every-final-circuit-a-stable-reference","4. Give every final circuit a stable reference",[16,1031,1032],{},"Each elementary circuit receives a capital letter. Lighting points, sockets and control units are numbered from the upstream overcurrent device. Use the same identifier on the board label and position plan.",[16,1034,1035],{},"For every outgoing circuit, establish its purpose and loads, whether it is lighting, socket, mixed or dedicated, fixed appliances, intermediate boxes, assigned RCD and agreement across board and both diagrams. “Kitchen” is too vague where lighting, worktop sockets, dishwasher and cooking equipment use separate circuits.",[11,1037,1039],{"id":1038},"_5-complete-the-wiring-system-data","5. Complete the wiring-system data",[16,1041,1042],{},"Subsection 3.1.2.2 requires type, cross-section, conductor count and installation method. Attach the information to the relevant segment. Wiring can change after a junction or connection box; one cable label at the circuit origin must not conceal a different downstream segment.",[16,1044,1045],{},"The design behind the diagram also checks load current, protective rating and permissible current capacity, installation and grouping, temperature, length and voltage drop, short-circuit and fault-loop conditions, minimum cross-sections and the protective conductor. Table 4.11 gives domestic copper ceilings, not a universal sizing calculation.",[16,1047,1048,1049,1052],{},"A neat ",[141,1050,1051],{},"XVB 3G2.5"," label is only valuable if that cable is installed. Verify against visible construction and reliable as-built records.",[11,1054,1056],{"id":1055},"_6-record-outlets-boxes-and-controls","6. Record outlets, boxes and controls",[16,1058,1059],{},"The single-line diagram includes sockets, lighting points, switches, connection\u002Fjunction boxes and fixed equipment. Use Table 2.23. If no listed mark fits, define an unambiguous symbol in the legend.",[16,1061,1062],{},"Distinguish where relevant: single or multiple socket, protective contact, switched or data outlet; lighting point and switching function; push-button, relay, detector or home automation; fixed appliance or ordinary socket load; connection box or junction box. A general equipment box with a clear label is better than an unexplained decorative icon.",[11,1064,1066],{"id":1065},"_7-include-sources-and-specialist-sections","7. Include sources and specialist sections",[16,1068,1069],{},"PV, inverter, battery, generator or transformer belongs in the electrical structure. Source properties appear on the single-line diagram or remain available in the dossier. For domestic low-voltage PV, Section 9.1.2 additionally calls for operating and maintenance instructions, safety information and technical references for installed equipment.",[16,1071,1072],{},"A panel symbol beside the board does not document point of connection, protection and conversion equipment. Establish which source can energise what, where it connects and through which components. Do not guess whether a battery can export. Safety or critical installations may need additional lists and plans with their sources, circuits and loads clearly identified.",[11,1074,1076],{"id":1075},"_8-synchronise-the-position-plan","8. Synchronise the position plan",[16,1078,1079],{},"Place every represented board, box, socket, light, control, fixed machine and source on the position plan with the same reference. Check both directions:",[173,1081,1082,1085,1088,1091,1094],{},[33,1083,1084],{},"find every single-line item on the floor plan;",[33,1086,1087],{},"find every floor-plan electrical symbol on the single-line;",[33,1089,1090],{},"compare circuit letter and number;",[33,1092,1093],{},"confirm floor, room and supplying board;",[33,1095,1096],{},"include concealed boxes and outdoor equipment.",[16,1098,1099],{},"Do not invent an unseen cable route. The position plan locates the required elements; additional cable or electrode plans should only contain reliable data.",[11,1101,1103],{"id":1102},"_9-freeze-the-as-built-state-before-inspection","9. Freeze the as-built state before inspection",[16,1105,1106],{},"The new installation undergoes conformity inspection before being put into use. The approved body compares construction with both diagrams and performs checks and measurements including earthing resistance, insulation, continuity and coordination of protective measures.",[16,1108,1109],{},"Immediately before the appointment compare site and dossier:",[30,1111,1112,1115,1118,1121,1124,1127],{},[33,1113,1114],{},"was a different breaker or RCD fitted?",[33,1116,1117],{},"did cable type or cross-section change?",[33,1119,1120],{},"was a socket, light or box added?",[33,1122,1123],{},"was a circuit moved to another RCD?",[33,1125,1126],{},"do board labels and references match?",[33,1128,1129],{},"are all pages from the same version?",[16,1131,1132],{},"Update the physical installation and records together. A technical defect must not be hidden by changing only the drawing.",[11,1134,1136],{"id":1135},"_10-organise-the-dossier-and-later-revisions","10. Organise the dossier and later revisions",[16,1138,1139],{},"The domestic dossier contains the two diagrams, inspection reports and applicable evidence and alteration records. The owner keeps it in duplicate and passes it to a new owner.",[16,1141,1142],{},"After inspection, significant work calls for updated diagrams. Non-significant alterations follow their description rule and the position plan remains current. Retain the endorsed version separately from later revisions so the history is clear.",[11,1144,1146],{"id":1145},"final-checklist","Final checklist",[30,1148,1150,1156,1162,1168,1174,1180,1186,1192,1198,1204,1210],{"className":1149},[220],[33,1151,1153,1155],{"className":1152},[224],[226,1154],{"disabled":228,"type":229}," identity, version, address and responsible person complete",[33,1157,1159,1161],{"className":1158},[224],[226,1160],{"disabled":228,"type":229}," actual voltage, current type and connection recorded",[33,1163,1165,1167],{"className":1164},[224],[226,1166],{"disabled":228,"type":229}," all boards, protective devices and sources included",[33,1169,1171,1173],{"className":1170},[224],[226,1172],{"disabled":228,"type":229}," every final circuit uniquely identified",[33,1175,1177,1179],{"className":1176},[224],[226,1178],{"disabled":228,"type":229}," cable type, cross-section, conductor count and installation method shown",[33,1181,1183,1185],{"className":1182},[224],[226,1184],{"disabled":228,"type":229}," sockets, lights, boxes, controls and fixed equipment present",[33,1187,1189,1191],{"className":1188},[224],[226,1190],{"disabled":228,"type":229}," official symbols or an unambiguous legend used",[33,1193,1195,1197],{"className":1194},[224],[226,1196],{"disabled":228,"type":229}," references match the board and position plan",[33,1199,1201,1203],{"className":1200},[224],[226,1202],{"disabled":228,"type":229}," construction changes incorporated",[33,1205,1207,1209],{"className":1206},[224],[226,1208],{"disabled":228,"type":229}," PV and specialist records added",[33,1211,1213,1215],{"className":1212},[224],[226,1214],{"disabled":228,"type":229}," calculations and measurements completed outside the drawing",[11,1217,1219],{"id":1218},"reconcile-design-site-changes-and-commissioning","Reconcile design, site changes and commissioning",[16,1221,1222],{},"A new build almost always changes between tender and energisation. Keep an open deviation register containing the planned reference, the work actually carried out, the responsible decision, affected drawings and any evidence still missing. Typical entries include a relocated board, an extra outdoor socket, revised heat-pump input data or a PV inverter added late. The design diagram becomes an as-built diagram only after every item has been resolved or explicitly marked as not installed.",[16,1224,1225],{},"Then walk through the installation with the labels and commissioning records. Do not operate circuits on the basis of assumed room names alone. Compare each physical board label with the diagram reference and the point on the position plan. If conductors, protective devices or settings change during commissioning, update the records afterwards. An early PDF export is not a reliable final edition merely because it looks complete.",[11,1227,1229],{"id":1228},"worked-review-of-one-new-final-circuit","Worked review of one new final circuit",[16,1231,1232],{},"For a fixed tumble dryer, “utility room” is not enough. The records should show the supplying board and protective chain, the stable circuit reference, the wiring system with conductor count and cross-section, and the fixed equipment at the end. The same reference appears at the actual connection point on the position plan. Keep the manufacturer's instructions, rating data and required settings separately as technical documentation.",[16,1234,1235],{},"Review the interfaces next. Is the protective-conductor path traceable? Does the real connection method match the drawing? Did a dedicated route in the design become a shared run on site? Is there a junction box missing from the diagram? These checks prevent formally complete pages from preserving an obsolete design state.",[11,1237,1239],{"id":1238},"hand-over-a-controlled-document-set","Hand over a controlled document set",[16,1241,1242],{},"Identify the final issue clearly with project, address, revision and export date. Assemble the single-line diagram, position plan, inspection report and relevant technical documents in an ordered dossier. Keep working copies and superseded revisions separate and visibly historic. The owner should know which files are current and that later alterations require another documentation update.",[16,1244,1245,1246,1250],{},"The ",[322,1247,1249],{"href":324,"rel":1248},[326],"official FPS Economy page on domestic electrical inspections"," lists the minimum diagrams to provide and summarises their content. It does not replace the detailed requirements of AREI\u002FRGIE Book 1 V06 or competent assessment of the particular project.",[11,1252,1254],{"id":1253},"preparing-with-planelec","Preparing with PlanElec",[16,1256,1257],{},"PlanElec can keep the floor plan, electrical topology and board data in one project, export both diagrams as PDF and run an indicative self-check for supported rules. It does not replace supply verification, cable design, site survey or measurement. A software check with no findings is not an AREI conformity statement; the approved body performs the official inspection.",[11,1259,1261],{"id":1260},"related-guidance","Related guidance",[30,1263,1264,1270,1276],{},[33,1265,1266],{},[322,1267,1269],{"href":1268},"\u002Fen\u002Fblog\u002Fsingle-line-diagram-vs-situation-plan","Coordinate the single-line and position plans",[33,1271,1272],{},[322,1273,1275],{"href":1274},"\u002Fen\u002Fblog\u002Farei-electrical-symbols-overview","Understand AREI electrical symbols",[33,1277,1278],{},[322,1279,1281],{"href":1280},"\u002Fen\u002Fblog\u002Felectrical-inspection","Prepare for electrical inspection",[16,1283,1284],{},[322,1285,1287],{"href":1286},"\u002Fen","Start a new-build project in PlanElec →",[16,1289,1290],{},[369,1291,1292],{},"Basis: AREI\u002FRGIE Book 1 V06, particularly Chapter 2.13, Section 3.1.2, Chapter 6.4 and Section 9.1.2. The official text and installed system remain decisive.",{"title":373,"searchDepth":374,"depth":374,"links":1294},[1295,1296,1297,1298,1299,1300,1301,1302,1303,1304,1305,1306,1307,1308,1309,1310,1311],{"id":925,"depth":374,"text":926},{"id":935,"depth":374,"text":936},{"id":965,"depth":374,"text":966},{"id":998,"depth":374,"text":999},{"id":1028,"depth":374,"text":1029},{"id":1038,"depth":374,"text":1039},{"id":1055,"depth":374,"text":1056},{"id":1065,"depth":374,"text":1066},{"id":1075,"depth":374,"text":1076},{"id":1102,"depth":374,"text":1103},{"id":1135,"depth":374,"text":1136},{"id":1145,"depth":374,"text":1146},{"id":1218,"depth":374,"text":1219},{"id":1228,"depth":374,"text":1229},{"id":1238,"depth":374,"text":1239},{"id":1253,"depth":374,"text":1254},{"id":1260,"depth":374,"text":1261},"From supply and protective devices to cable data, references and the matching position plan: a complete domestic new-build checklist under AREI Book 1 V06.","en",{},"\u002Fblog\u002Fnew-build-single-line-checklist.en",{"title":920,"description":1312},"new-build-single-line-diagram-checklist","blog\u002Fnew-build-single-line-checklist.en",[406,407,1320,1321,410,1322,1323,1324],"new build","single-line diagram","position plan","conformity inspection","Belgium","F2KQJLjtzWt1Lps1jCssuEG7AUqfHqlV-b8Yq7pNRlI",{"id":4,"title":5,"articleId":6,"body":1327,"category":393,"date":394,"description":395,"extension":396,"lastUpdated":394,"locale":397,"meta":1583,"navigation":228,"path":399,"publishDate":394,"readTime":400,"refreshInterval":401,"seo":1584,"slug":403,"stem":404,"tags":1585,"__hash__":414},{"type":8,"value":1328,"toc":1564},[1329,1331,1333,1335,1337,1339,1353,1355,1357,1359,1375,1377,1379,1381,1395,1397,1399,1401,1403,1405,1407,1409,1413,1415,1417,1419,1421,1423,1425,1427,1429,1441,1443,1445,1447,1449,1451,1453,1455,1457,1515,1517,1519,1521,1523,1525,1527,1529,1531,1536,1538,1540,1542,1556,1560],[11,1330,14],{"id":13},[16,1332,18],{},[16,1334,21],{},[11,1336,25],{"id":24},[16,1338,28],{},[30,1340,1341,1343,1345,1347,1349,1351],{},[33,1342,35],{},[33,1344,38],{},[33,1346,41],{},[33,1348,44],{},[33,1350,47],{},[33,1352,50],{},[16,1354,53],{},[11,1356,57],{"id":56},[16,1358,60],{},[30,1360,1361,1363,1365,1367,1369,1371,1373],{},[33,1362,65],{},[33,1364,68],{},[33,1366,71],{},[33,1368,74],{},[33,1370,77],{},[33,1372,80],{},[33,1374,83],{},[16,1376,86],{},[11,1378,90],{"id":89},[16,1380,93],{},[30,1382,1383,1385,1387,1389,1391,1393],{},[33,1384,98],{},[33,1386,101],{},[33,1388,104],{},[33,1390,107],{},[33,1392,110],{},[33,1394,113],{},[16,1396,116],{},[11,1398,120],{"id":119},[16,1400,123],{},[16,1402,126],{},[11,1404,130],{"id":129},[16,1406,133],{},[16,1408,136],{},[16,1410,139,1411,144],{},[141,1412,143],{},[11,1414,148],{"id":147},[16,1416,151],{},[16,1418,154],{},[11,1420,158],{"id":157},[16,1422,161],{},[16,1424,164],{},[11,1426,168],{"id":167},[16,1428,171],{},[173,1430,1431,1433,1435,1437,1439],{},[33,1432,177],{},[33,1434,180],{},[33,1436,183],{},[33,1438,186],{},[33,1440,189],{},[16,1442,192],{},[11,1444,196],{"id":195},[16,1446,199],{},[16,1448,202],{},[11,1450,206],{"id":205},[16,1452,209],{},[16,1454,212],{},[11,1456,216],{"id":215},[30,1458,1460,1465,1470,1475,1480,1485,1490,1495,1500,1505,1510],{"className":1459},[220],[33,1461,1463,230],{"className":1462},[224],[226,1464],{"disabled":228,"type":229},[33,1466,1468,236],{"className":1467},[224],[226,1469],{"disabled":228,"type":229},[33,1471,1473,242],{"className":1472},[224],[226,1474],{"disabled":228,"type":229},[33,1476,1478,248],{"className":1477},[224],[226,1479],{"disabled":228,"type":229},[33,1481,1483,254],{"className":1482},[224],[226,1484],{"disabled":228,"type":229},[33,1486,1488,260],{"className":1487},[224],[226,1489],{"disabled":228,"type":229},[33,1491,1493,266],{"className":1492},[224],[226,1494],{"disabled":228,"type":229},[33,1496,1498,272],{"className":1497},[224],[226,1499],{"disabled":228,"type":229},[33,1501,1503,278],{"className":1502},[224],[226,1504],{"disabled":228,"type":229},[33,1506,1508,284],{"className":1507},[224],[226,1509],{"disabled":228,"type":229},[33,1511,1513,290],{"className":1512},[224],[226,1514],{"disabled":228,"type":229},[11,1516,294],{"id":293},[16,1518,297],{},[16,1520,300],{},[11,1522,304],{"id":303},[16,1524,307],{},[16,1526,310],{},[11,1528,314],{"id":313},[16,1530,317],{},[16,1532,320,1533,328],{},[322,1534,327],{"href":324,"rel":1535},[326],[11,1537,332],{"id":331},[16,1539,335],{},[11,1541,339],{"id":338},[30,1543,1544,1548,1552],{},[33,1545,1546],{},[322,1547,347],{"href":346},[33,1549,1550],{},[322,1551,353],{"href":352},[33,1553,1554],{},[322,1555,359],{"href":358},[16,1557,1558],{},[322,1559,365],{"href":364},[16,1561,1562],{},[369,1563,371],{},{"title":373,"searchDepth":374,"depth":374,"links":1565},[1566,1567,1568,1569,1570,1571,1572,1573,1574,1575,1576,1577,1578,1579,1580,1581,1582],{"id":13,"depth":374,"text":14},{"id":24,"depth":374,"text":25},{"id":56,"depth":374,"text":57},{"id":89,"depth":374,"text":90},{"id":119,"depth":374,"text":120},{"id":129,"depth":374,"text":130},{"id":147,"depth":374,"text":148},{"id":157,"depth":374,"text":158},{"id":167,"depth":374,"text":168},{"id":195,"depth":374,"text":196},{"id":205,"depth":374,"text":206},{"id":215,"depth":374,"text":216},{"id":293,"depth":374,"text":294},{"id":303,"depth":374,"text":304},{"id":313,"depth":374,"text":314},{"id":331,"depth":374,"text":332},{"id":338,"depth":374,"text":339},{},{"title":5,"description":395},[406,407,408,409,410,411,412,413],{"id":1587,"title":1588,"articleId":6,"body":1589,"category":393,"date":394,"description":2008,"extension":396,"lastUpdated":394,"locale":2009,"meta":2010,"navigation":228,"path":2011,"publishDate":394,"readTime":400,"refreshInterval":401,"seo":2012,"slug":2013,"stem":2014,"tags":2015,"__hash__":2021},"blog\u002Fblog\u002Fnew-build-single-line-checklist.nl.md","Eendraadschema voor nieuwbouw: betrouwbare AREI-checklist",{"type":8,"value":1590,"toc":1989},[1591,1595,1598,1601,1605,1608,1628,1631,1635,1638,1661,1664,1668,1671,1691,1694,1698,1701,1704,1721,1724,1728,1731,1734,1740,1744,1747,1750,1754,1757,1760,1764,1767,1784,1787,1791,1794,1797,1817,1820,1824,1827,1830,1833,1837,1906,1910,1913,1916,1920,1923,1926,1930,1933,1936,1939,1947,1951,1954,1958,1978,1984],[11,1592,1594],{"id":1593},"doel-het-uitgevoerde-systeem-documenteren","Doel: het uitgevoerde systeem documenteren",[16,1596,1597],{},"Voor een nieuwe huishoudelijke installatie stelt de verantwoordelijke voor de uitvoering een eendraadschema en situatieplan op. Het eendraadschema is geen voorlopig ontwerp dat na de werf ongewijzigd mag blijven. Vóór de gelijkvormigheidscontrole moet het de werkelijk geplaatste borden, beveiligingen, leidingen, kringen, verbruikers en bronnen weergeven.",[16,1599,1600],{},"Deze checklist steunt op AREI Boek 1 V06 en richt zich op het gebruikelijke AC-systeem. De sinds 1 april 2026 opgenomen regels voor geaarde DC-systemen zijn een afzonderlijk vakgebied; AC-geleiderrollen of symbolen mogen niet zomaar worden gekopieerd.",[11,1602,1604],{"id":1603},"_1-geef-de-documentenset-een-identiteit","1. Geef de documentenset een identiteit",[16,1606,1607],{},"Neem vóór het tekenen op:",[30,1609,1610,1613,1616,1619,1622,1625],{},[33,1611,1612],{},"documentnummer, versie en versiedatum;",[33,1614,1615],{},"adres van de installatie;",[33,1617,1618],{},"naam en hoedanigheid van de verantwoordelijke voor de uitvoering;",[33,1620,1621],{},"btw-nummer indien van toepassing;",[33,1623,1624],{},"velden voor datum en handtekening;",[33,1626,1627],{},"spanning en aard van de stroom op het eendraadschema.",[16,1629,1630],{},"Eendraadschema en situatieplan dragen dezelfde versie. Een bestandsnaam of exportdatum alleen is onvoldoende wanneer pagina's worden afgedrukt of samengevoegd. Een werkversie mag ook geen vooraf ingevulde goedkeuring of claim “AREI-conform” bevatten. Visering ontstaat pas in de echte controleprocedure.",[11,1632,1634],{"id":1633},"_2-leg-de-voeding-vast","2. Leg de voeding vast",[16,1636,1637],{},"Begin met aansluitgegevens en uitvoering, niet met een sjabloon:",[30,1639,1640,1643,1646,1649,1652,1655,1658],{},[33,1641,1642],{},"een- of driefasig;",[33,1644,1645],{},"nominale spanning en AC\u002FDC;",[33,1647,1648],{},"aanwezigheid van nul- en beschermingsgeleider;",[33,1650,1651],{},"meter- en aansluitopbouw;",[33,1653,1654],{},"aansluitbeveiliging en hoofdlastscheider;",[33,1656,1657],{},"aardings- en netconcept waar dit voor de bescherming nodig is;",[33,1659,1660],{},"bijkomende bronnen, omvormers of transformatoren.",[16,1662,1663],{},"Een Belgisch net is niet aan een gewone wandcontactdoos als 3×400 V+N of 3×230 V te herkennen. Een fout uitgangspunt beïnvloedt poolaantal, nulgeleider, RCD-aansluiting en belastingen. Vergelijk contract, bord en metingen.",[11,1665,1667],{"id":1666},"_3-teken-de-volledige-beveiligingsketen","3. Teken de volledige beveiligingsketen",[16,1669,1670],{},"Neem hoofd- en onderverdelers met hun voedingen op. Elke eindstroombaan moet vanaf het voedingspunt traceerbaar zijn. Noteer waar van toepassing:",[30,1672,1673,1676,1679,1682,1685,1688],{},[33,1674,1675],{},"hoofdschakelaar en voorbeveiliging;",[33,1677,1678],{},"differentieels met type, aanspreekstroom, nominale stroom en relevante tijdkarakteristiek;",[33,1680,1681],{},"smeltzekeringen of automaten met kaliber en karakteristiek;",[33,1683,1684],{},"koppelingen en onderverdelers die de structuur verklaren;",[33,1686,1687],{},"reserveautomaten als reserve, zonder denkbeeldige kabel of verbruiker;",[33,1689,1690],{},"een eenduidige naam voor elk bord en vertrek.",[16,1692,1693],{},"De combinatie 300 en 30 mA bewijst geen selectiviteit. Golfvormklasse, verhoogde immuniteit en tijdvertraging zijn verschillende eigenschappen. Kortsluitvoorwaarden, uitschakeltijd en fabrikantcoördinatie worden afzonderlijk beoordeeld.",[11,1695,1697],{"id":1696},"_4-geef-elke-eindstroombaan-een-stabiele-referentie","4. Geef elke eindstroombaan een stabiele referentie",[16,1699,1700],{},"Elke elementaire kring krijgt een hoofdletter. Lichtpunten, contactdozen en sturingseenheden worden vanaf de voorliggende overstroombeveiliging genummerd. Gebruik dezelfde code op bordlabel en situatieplan.",[16,1702,1703],{},"Controleer per vertrek:",[30,1705,1706,1709,1712,1715,1718],{},[33,1707,1708],{},"functie en aangesloten lasten;",[33,1710,1711],{},"licht-, stopcontact-, gemengde of toegewezen toestelkring;",[33,1713,1714],{},"vaste toestellen en eventuele verbindings-\u002Faftakdozen;",[33,1716,1717],{},"toegewezen differentieel;",[33,1719,1720],{},"overeenstemming tussen bord, eendraadschema en situatieplan.",[16,1722,1723],{},"“Keuken” is geen voldoende onderscheid wanneer verlichting, werkstopcontacten, vaatwasser en kookplaat verschillende kringen hebben.",[11,1725,1727],{"id":1726},"_5-voeg-alle-leidinggegevens-toe","5. Voeg alle leidinggegevens toe",[16,1729,1730],{},"Boek 1 vraagt type, doorsnede, aantal geleiders en plaatsingswijze. Leg ze vast per relevant segment. Na een aftakdoos kunnen kabel of plaatsing veranderen; één algemene kabeltekst aan het begin mag dat niet verbergen.",[16,1732,1733],{},"De onderliggende berekening blijft ruimer dan het schema. Beoordeel belasting, beveiligingskaliber en stroombelastbaarheid, plaatsing en groepering, omgevingstemperatuur, lengte en spanningsval, kortsluit-\u002Ffoutlusvoorwaarden, minimumdoorsneden en PE-opbouw. Tabel 4.11 geeft huishoudelijke plafonds voor koper, geen universele kabelberekening.",[16,1735,1736,1737,1739],{},"Een keurig label ",[141,1738,143],{}," is nutteloos als op de werf een andere leiding ligt. Verifieer waar het materiaal nog zichtbaar of uit uitvoeringsgegevens aantoonbaar is.",[11,1741,1743],{"id":1742},"_6-neem-aansluitpunten-en-sturing-op","6. Neem aansluitpunten en sturing op",[16,1745,1746],{},"Het schema bevat contactdozen, lichtpunten, schakelaars, verbindings- en aftakdozen en vaste machines of toestellen. Gebruik Tabel 2.23. Ontbreekt een officieel teken, gebruik dan een ondubbelzinnig symbool dat in de legende is gedefinieerd.",[16,1748,1749],{},"Maak relevante verschillen zichtbaar: enkel of meervoudig stopcontact, aardingscontact, geschakeld of data, lichtpunt en schakelfunctie, drukknop\u002Frelais\u002Fdetector\u002Fdomotica, vast toestel of algemene contactdooslast, verbindings- of aftakdoos. Een algemeen apparaatteken met duidelijke tekst is beter dan een niet-verklaard decoratief icoon.",[11,1751,1753],{"id":1752},"_7-bronnen-en-bijzondere-delen","7. Bronnen en bijzondere delen",[16,1755,1756],{},"PV, omvormer, batterij, generator en transformator worden in de elektrische structuur opgenomen. Broneigenschappen staan op het eendraadschema of in het dossier. Voor huishoudelijke laagspannings-PV vraagt afdeling 9.1.2 bovendien bedienings- en onderhoudsinstructies, veiligheidsinformatie en technische referenties van het geïnstalleerde materiaal.",[16,1758,1759],{},"Een enkel paneelsymbool bij het bord beschrijft aansluiting en beveiliging niet. Leg vast welke bron kan leveren, waar zij koppelt en welke componenten ertussen zitten. Raad niet of een batterij naar het net kan exporteren. Veiligheids- of kritische installaties kunnen bijkomende lijsten en plannen vereisen en worden duidelijk geïdentificeerd.",[11,1761,1763],{"id":1762},"_8-houd-het-situatieplan-synchroon","8. Houd het situatieplan synchroon",[16,1765,1766],{},"Plaats elke weergegeven verdeler, doos, contactdoos, lamp, sturing, vaste machine en bron op het situatieplan met dezelfde referentie. Controleer in beide richtingen:",[173,1768,1769,1772,1775,1778,1781],{},[33,1770,1771],{},"elk element van het eendraadschema terugvinden op het grondplan;",[33,1773,1774],{},"elk plansymbool terugvinden op het eendraadschema;",[33,1776,1777],{},"letter en nummer vergelijken;",[33,1779,1780],{},"verdieping, ruimte en bordtoewijzing bevestigen;",[33,1782,1783],{},"verborgen dozen en buitenelementen niet vergeten.",[16,1785,1786],{},"Een onbekende kabelroute wordt niet verzonnen. Het situatieplan lokaliseert de vereiste elementen; extra kabel- of aardingsplannen worden alleen met betrouwbare gegevens opgesteld.",[11,1788,1790],{"id":1789},"_9-bevries-de-werkelijke-toestand-vóór-de-controle","9. Bevries de werkelijke toestand vóór de controle",[16,1792,1793],{},"De nieuwe installatie wordt vóór ingebruikname aan de gelijkvormigheidscontrole onderworpen. Het erkende organisme vergelijkt de uitvoering met beide plannen en voert controles en metingen uit, waaronder aardingsweerstand, isolatie, continuïteit en de samenhang van beveiligingen.",[16,1795,1796],{},"Doe vlak vóór de afspraak een werfvergelijking:",[30,1798,1799,1802,1805,1808,1811,1814],{},[33,1800,1801],{},"ander type of kaliber automaat\u002FRCD geplaatst?",[33,1803,1804],{},"kabeltype of doorsnede gewijzigd?",[33,1806,1807],{},"contactdoos, lamp of doos toegevoegd?",[33,1809,1810],{},"kring naar een andere differentieel verhuisd?",[33,1812,1813],{},"bordlabels en referenties identiek?",[33,1815,1816],{},"alle pagina's van dezelfde versie?",[16,1818,1819],{},"Werk installatie en documenten samen bij. Een technisch probleem mag niet alleen grafisch worden weggepoetst.",[11,1821,1823],{"id":1822},"_10-bewaar-dossier-en-versies","10. Bewaar dossier en versies",[16,1825,1826],{},"Het huishoudelijke dossier bevat naast de twee plannen ook controleverslagen en, waar van toepassing, bewijsstukken en wijzigingsdocumenten. De eigenaar bewaart het in twee exemplaren en draagt het over aan een nieuwe eigenaar.",[16,1828,1829],{},"Na de controle blijven wijzigingen traceerbaar. Belangrijke werken vragen aangepaste plannen; niet-belangrijke wijzigingen worden volgens de AREI-regels beschreven en het situatieplan blijft actueel. Bewaar de geviseerde versie en latere versies apart.",[16,1831,1832],{},"Leg ook vast welke uitvoeringsdocumenten de getekende waarden ondersteunen, bijvoorbeeld kabel- en toestelgegevens. Een foto of factuur kan de herkomst verduidelijken, maar vervangt geen verplicht schema, plan of keuringsverslag.",[11,1834,1836],{"id":1835},"eindcheck","Eindcheck",[30,1838,1840,1846,1852,1858,1864,1870,1876,1882,1888,1894,1900],{"className":1839},[220],[33,1841,1843,1845],{"className":1842},[224],[226,1844],{"disabled":228,"type":229}," identiteit, versie, adres en verantwoordelijke volledig",[33,1847,1849,1851],{"className":1848},[224],[226,1850],{"disabled":228,"type":229}," spanning, stroomsoort en aansluiting juist",[33,1853,1855,1857],{"className":1854},[224],[226,1856],{"disabled":228,"type":229}," alle borden, beveiligingen en bronnen opgenomen",[33,1859,1861,1863],{"className":1860},[224],[226,1862],{"disabled":228,"type":229}," elke eindstroombaan uniek aangeduid",[33,1865,1867,1869],{"className":1866},[224],[226,1868],{"disabled":228,"type":229}," kabeltype, doorsnede, geleiders en plaatsing vermeld",[33,1871,1873,1875],{"className":1872},[224],[226,1874],{"disabled":228,"type":229}," contactdozen, lichtpunten, dozen, schakelaars en vaste toestellen aanwezig",[33,1877,1879,1881],{"className":1878},[224],[226,1880],{"disabled":228,"type":229}," officiële symbolen of duidelijke legende gebruikt",[33,1883,1885,1887],{"className":1884},[224],[226,1886],{"disabled":228,"type":229}," referenties gelijk aan bord en situatieplan",[33,1889,1891,1893],{"className":1890},[224],[226,1892],{"disabled":228,"type":229}," werfwijzigingen verwerkt",[33,1895,1897,1899],{"className":1896},[224],[226,1898],{"disabled":228,"type":229}," PV- en bijzondere stukken toegevoegd",[33,1901,1903,1905],{"className":1902},[224],[226,1904],{"disabled":228,"type":229}," berekeningen en metingen buiten het schema uitgevoerd",[11,1907,1909],{"id":1908},"ontwerp-werfwijzigingen-en-ingebruikname-afstemmen","Ontwerp, werfwijzigingen en ingebruikname afstemmen",[16,1911,1912],{},"Een nieuwbouw wijzigt bijna altijd tussen offerte en ingebruikname. Houd daarom een open afwijkingenlijst bij met geplande referentie, werkelijk uitgevoerde aanpassing, verantwoordelijke beslissing, betrokken plannen en ontbrekend bewijs. Een verplaatst bord, extra buitencontactdoos, gewijzigd vermogen van de warmtepomp of laat toegevoegde PV-omvormer zijn typische voorbeelden. Het ontwerpschema wordt pas een as-built schema wanneer elke regel opgelost of uitdrukkelijk als niet uitgevoerd gemarkeerd is.",[16,1914,1915],{},"Loop daarna met etiketten en meetdocumenten door de installatie. Schakel kringen niet alleen op basis van veronderstelde lokaalnamen. Vergelijk de echte bordmarkering met de referentie op het schema en het punt op het situatieplan. Wanneer geleiders, beveiligingen of instellingen tijdens de ingebruikname veranderen, moet de documentatie achteraf mee wijzigen. Een vroeg geëxporteerde pdf is geen betrouwbare eindversie omdat de pagina er afgewerkt uitziet.",[11,1917,1919],{"id":1918},"voorbeeldcontrole-van-één-nieuwe-eindstroombaan","Voorbeeldcontrole van één nieuwe eindstroombaan",[16,1921,1922],{},"Voor een vast aangesloten droogkast volstaat “wasplaats” niet. Het dossier laat zien uit welk bord en achter welke beveiligingsketen de kring vertrekt, welke vaste referentie ze draagt, welk leidingsysteem met hoeveel geleiders en welke doorsnede werd gebruikt en welk toestel aan het einde staat. Dezelfde referentie staat op de echte aansluitplaats in het situatieplan. Handleiding, toestelwaarden en vereiste instellingen worden afzonderlijk als technische documentatie bewaard.",[16,1924,1925],{},"Controleer daarna de raakvlakken. Is het traject van de beschermingsgeleider traceerbaar? Komt de echte aansluitwijze overeen met de tekening? Werd een apart ontworpen traject op de werf toch gedeeld? Ontbreekt een aftakdoos op het schema? Zulke vragen voorkomen dat formeel volledige bladen een verouderde ontwerpstaat vastleggen.",[11,1927,1929],{"id":1928},"draag-een-beheerste-documentenset-over","Draag een beheerste documentenset over",[16,1931,1932],{},"Identificeer de einduitgave duidelijk met project, adres, revisie en exportdatum. Bundel eendraadschema, situatieplan, keuringsverslag en relevante technische documenten in een geordend dossier. Houd werkversies en vervangen revisies apart en zichtbaar historisch. De eigenaar moet weten welke bestanden actueel zijn en dat latere wijzigingen opnieuw moeten worden gedocumenteerd.",[16,1934,1935],{},"Voeg een korte bladindex toe zodra de set uit meerdere pagina's bestaat. Vermeld per blad onderwerp en revisie en controleer of alle vervolgverwijzingen bestaan. Daardoor kan een oud detailblad niet ongemerkt tussen actuele documenten blijven zitten en is bij een volgende uitbreiding meteen duidelijk welke delen opnieuw moeten worden beoordeeld.",[16,1937,1938],{},"Sluit de oplevermap niet zolang onbekende toestelwaarden of onduidelijke kringtoewijzingen als gewone tekst zijn ingevuld. Gebruik een zichtbare openpuntenlijst met eigenaar en beslismoment. Zodra de informatie beschikbaar is, corrigeert u brongegevens én beide plannen. Daardoor kan een tijdelijke placeholder niet ongemerkt de definitieve documentatie worden.",[16,1940,1941,1942,1946],{},"De ",[322,1943,1945],{"href":324,"rel":1944},[326],"officiële FOD-pagina over controle van huishoudelijke installaties"," noemt de minimaal voor te leggen plannen en vat hun inhoud samen. Ze vervangt de gedetailleerde bepalingen van AREI Boek 1 V06 of de deskundige beoordeling van het concrete project niet.",[11,1948,1950],{"id":1949},"voorbereiden-met-planelec","Voorbereiden met PlanElec",[16,1952,1953],{},"PlanElec kan grondplan, elektrische topologie en bordgegevens in één project beheren, beide plannen als pdf exporteren en een oriënterende zelfcheck voor ondersteunde regels uitvoeren. Het vervangt geen aansluitcontrole, kabelberekening, werfopname of meting. Een foutloze softwarecheck is geen AREI-conformiteitsverklaring; de officiële controle gebeurt door een erkend organisme.",[11,1955,1957],{"id":1956},"verder-lezen","Verder lezen",[30,1959,1960,1966,1972],{},[33,1961,1962],{},[322,1963,1965],{"href":1964},"\u002Fblog\u002Feendraadschema-vs-situatieschema","Eendraadschema en situatieplan samen gebruiken",[33,1967,1968],{},[322,1969,1971],{"href":1970},"\u002Fblog\u002Farei-elektrische-symbolen-overzicht","AREI-symbolen uitgelegd",[33,1973,1974],{},[322,1975,1977],{"href":1976},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring voorbereiden",[16,1979,1980],{},[322,1981,1983],{"href":1982},"\u002F","Start een nieuwbouwproject in PlanElec →",[16,1985,1986],{},[369,1987,1988],{},"Regelbasis: AREI Boek 1 V06, vooral hoofdstuk 2.13, afdeling 3.1.2, hoofdstuk 6.4 en afdeling 9.1.2. De officiële tekst en de werkelijk uitgevoerde installatie zijn doorslaggevend.",{"title":373,"searchDepth":374,"depth":374,"links":1990},[1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007],{"id":1593,"depth":374,"text":1594},{"id":1603,"depth":374,"text":1604},{"id":1633,"depth":374,"text":1634},{"id":1666,"depth":374,"text":1667},{"id":1696,"depth":374,"text":1697},{"id":1726,"depth":374,"text":1727},{"id":1742,"depth":374,"text":1743},{"id":1752,"depth":374,"text":1753},{"id":1762,"depth":374,"text":1763},{"id":1789,"depth":374,"text":1790},{"id":1822,"depth":374,"text":1823},{"id":1835,"depth":374,"text":1836},{"id":1908,"depth":374,"text":1909},{"id":1918,"depth":374,"text":1919},{"id":1928,"depth":374,"text":1929},{"id":1949,"depth":374,"text":1950},{"id":1956,"depth":374,"text":1957},"Van aansluiting en beveiligingen tot kabelgegevens en dezelfde versie van het situatieplan: een praktische nieuwbouwchecklist volgens AREI Boek 1 V06.","nl",{},"\u002Fblog\u002Fnew-build-single-line-checklist.nl",{"title":1588,"description":2008},"eendraadschema-nieuwbouw-checklist","blog\u002Fnew-build-single-line-checklist.nl",[406,407,2016,2017,410,2018,2019,2020],"nieuwbouw","eendraadschema","situatieplan","gelijkvormigheidscontrole","België","B3F_0DoZ4tom-5HmhYYicdpF7NV6vJMTHG7CY-dtFZY",1788389254538]