[{"data":1,"prerenderedAt":3269},["ShallowReactive",2],{"blog-post-en-top-10-arei-violations":3,"blog-alternates-top-10-arei-violations":727},{"id":4,"title":5,"articleId":6,"body":7,"category":704,"date":705,"description":706,"extension":707,"lastUpdated":708,"locale":709,"meta":710,"navigation":711,"path":712,"publishDate":705,"readTime":713,"refreshInterval":714,"seo":715,"slug":6,"stem":716,"tags":717,"__hash__":726},"blog\u002Fblog\u002Ftop-10-arei-violations.en.md","10 Important AREI Inspection Points: Identify, Avoid and Correct Them","top-10-arei-violations",{"type":8,"value":9,"toc":638},"minimark",[10,14,17,22,29,34,37,41,48,52,65,69,72,74,78,83,86,97,100,103,106,120,124,127,129,133,138,141,144,147,150,153,170,173,176,178,182,187,190,197,200,203,206,217,220,223,225,229,234,237,240,243,246,249,263,266,269,271,275,280,283,286,289,296,299,375,386,389,392,394,398,403,406,413,416,419,422,433,436,439,441,445,450,453,460,463,466,469,480,483,486,488,492,497,500,503,506,509,512,523,526,529,531,535,540,543,546,549,552,555,566,569,572,574,578,594,596,601,627],[11,12,13],"p",{},"These ten points are a professional checklist, not a statistical ranking. No authoritative nationwide source supports a failure percentage or this order. The actual report remains decisive.",[15,16],"hr",{},[18,19,21],"h2",{"id":20},"_1-missing-or-incorrect-rcd-residual-current-device","1. Missing or Incorrect RCD (Residual Current Device)",[11,23,24,28],{},[25,26,27],"strong",{},"AREI Article:"," Art. 4.2.4.3 (main RCD) \u002F Art. 4.2.4.3b (30 mA group RCD obligation)",[30,31,33],"h3",{"id":32},"description","Description",[11,35,36],{},"An important inspection area is a missing, unsuitable or incorrectly rated RCD. For domestic installations, the AREI specifically places socket-outlet circuits, lighting, locations containing a bath or shower, washing machines, dryers and dishwashers behind a high- or very-high-sensitivity RCD. This does not establish a nationwide frequency ranking.",[30,38,40],{"id":39},"why-its-a-problem","Why It's a Problem",[11,42,43,44,47],{},"The RCD is the most important personal protection device in an electrical installation. It detects fault currents (e.g. when current flows through the human body) and disconnects within milliseconds. Without RCD protection, there is a ",[25,45,46],{},"risk to life"," in case of insulation faults.",[30,49,51],{"id":50},"how-to-fix-it","How to Fix It",[53,54,55,59,62],"ul",{},[56,57,58],"li",{},"Derive the RCD type and protection combination from the expected residual-current spectrum, earthing system, manufacturer evidence and applicable special chapter. For charging points, assess the individual AC-circuit RCD together with smooth-DC fault-current protection; for inverters, use evidence for the exact variant.",[56,60,61],{},"Maximum 8 final circuits per 30 mA RCD (AREI Art. 4.2.4.3b)",[56,63,64],{},"At least one RCD rated at no more than 300 mA is required at the origin; domestic RCDs are at least Type A. Time-delayed or selective construction depends on project coordination and is not a universal Type A-S prescription.",[30,66,68],{"id":67},"project-specific-scope","Project-specific scope",[11,70,71],{},"Device, poles, board space, wiring and measurements determine the quotation.",[15,73],{},[18,75,77],{"id":76},"_2-missing-or-outdated-electrical-plans","2. Missing or Outdated Electrical Plans",[11,79,80,82],{},[25,81,27],{}," Art. 9.1.2 Nr. 1 (single-line diagram), Art. 9.1.2 Nr. 2 (situation plan)",[30,84,33],{"id":85},"description-1",[11,87,88,89,92,93,96],{},"The AREI requires a current ",[25,90,91],{},"single-line diagram"," and ",[25,94,95],{},"situation plan"," for every electrical installation. Often these plans are completely missing or don't reflect the current state of the installation — for example because circuits were added or modified after construction.",[30,98,40],{"id":99},"why-its-a-problem-1",[11,101,102],{},"Without current plans, neither the inspector nor an electrician can safely assess the installation. In emergencies (fire, accident), the documentation showing which switch supplies which area is missing.",[30,104,51],{"id":105},"how-to-fix-it-1",[53,107,108,111,114],{},[56,109,110],{},"Create or update the single-line diagram and situation plan",[56,112,113],{},"Document all circuits, breakers, RCDs and consumers",[56,115,116,117],{},"Plans must show the ",[25,118,119],{},"actual current state",[30,121,123],{"id":122},"typical-costs","Typical Costs",[11,125,126],{},"Verified inputs and circuit tracing determine the work; software does not replace a survey.",[15,128],{},[18,130,132],{"id":131},"_3-faulty-earthing","3. Faulty Earthing",[11,134,135,137],{},[25,136,27],{}," Art. 4.2.3",[30,139,33],{"id":140},"description-2",[11,142,143],{},"Earthing is part of the installation's protection concept. A measured resistance above 30 ohms is not automatically equivalent to missing earthing under Art. 4.2.4.3b; it triggers additional residual-current protection requirements. A defect exists, for example, when earthing is absent or damaged or when the protective arrangement required for the measured value is not provided. Loose connections and corroded protective conductors also require professional assessment.",[30,145,40],{"id":146},"why-its-a-problem-2",[11,148,149],{},"Without functioning earthing, metal enclosures can be live without the RCD tripping. This creates an invisible death trap.",[30,151,51],{"id":152},"how-to-fix-it-2",[53,154,155,158,161,164,167],{},[56,156,157],{},"Have the earth resistance measured",[56,159,160],{},"Above 30 ohms, verify the supplementary Book 1 arrangement: at least two high- or very-high-sensitivity RCDs, no more than sixteen simple or multiple socket outlets per such RCD, plus the additional protection required for the other affected circuits",[56,162,163],{},"Decide professionally whether to improve the earth electrode system, adapt the protective arrangement, or do both",[56,165,166],{},"Check all earthing connections and tighten if necessary",[56,168,169],{},"Inspect the earth conductor for corrosion",[30,171,123],{"id":172},"typical-costs-1",[11,174,175],{},"Measurements, existing system, soil and professional work determine the remedy.",[15,177],{},[18,179,181],{"id":180},"_4-missing-main-switch","4. Missing Main Switch",[11,183,184,186],{},[25,185,27],{}," Art. 5.3.5.1b (main load-break switch)",[30,188,33],{"id":189},"description-3",[11,191,192,193,196],{},"Every electrical installation must have an ",[25,194,195],{},"all-pole main switch"," that can de-energise the entire installation. The main switch must be rated at least 40A (for standard dwellings).",[30,198,40],{"id":199},"why-its-a-problem-3",[11,201,202],{},"In an emergency, the entire installation must be switchable off with a single action — for example in case of fire, flooding or accident. A missing main switch can cost life-saving seconds.",[30,204,51],{"id":205},"how-to-fix-it-3",[53,207,208,211,214],{},[56,209,210],{},"Install an all-pole main switch of at least 40A before the first RCD",[56,212,213],{},"The switch must be easily accessible (distribution board)",[56,215,216],{},"For three-phase installations: use a 4-pole main switch",[30,218,123],{"id":219},"typical-costs-2",[11,221,222],{},"Rating, poles, board space and alterations are project-specific.",[15,224],{},[18,226,228],{"id":227},"_5-bathroom-zones-not-respected","5. Bathroom Zones Not Respected",[11,230,231,233],{},[25,232,27],{}," Art. 7.1",[30,235,33],{"id":236},"description-4",[11,238,239],{},"The AREI defines protection zones in the bathroom (Zone 0, 1, 2 and 3), in which only certain electrical devices are permitted. Common violations: sockets in Zone 0 or 1, missing splash protection, switches too close to the bathtub or shower.",[30,241,40],{"id":242},"why-its-a-problem-4",[11,244,245],{},"Water and electricity are a deadly combination. Bathroom zones ensure that electrical devices maintain a sufficient safety distance from water sources.",[30,247,51],{"id":248},"how-to-fix-it-4",[53,250,251,254,257,260],{},[56,252,253],{},"Relocate sockets and switches outside Zone 0 and 1 (minimum 60 cm from bathtub\u002Fshower)",[56,255,256],{},"In Zone 2: only IPX4-rated devices (splash protection)",[56,258,259],{},"Protect all bathroom circuits with a 30 mA RCD",[56,261,262],{},"No junction boxes in Zone 0 or 1",[30,264,123],{"id":265},"typical-costs-3",[11,267,268],{},"Position, route, finishes and equipment determine the work.",[15,270],{},[18,272,274],{"id":273},"_6-cable-cross-section-too-small-for-the-breaker","6. Cable Cross-Section Too Small for the Breaker",[11,276,277,279],{},[25,278,27],{}," Art. 4.4.1 (overcurrent protection) \u002F Art. 5.2.1.2 (cable selection)",[30,281,33],{"id":282},"description-5",[11,284,285],{},"The circuit breaker (MCB) must match the cable cross-section. A common mismatch: a 20A breaker on a 1.5 mm² cable (which is only rated for 16A). The breaker then fails to protect the cable from overload.",[30,287,40],{"id":288},"why-its-a-problem-5",[11,290,291,292,295],{},"When a cable carries more current than it can handle, it heats up and can cause fires. The breaker must ",[25,293,294],{},"always be less than or equal to"," the cable's current carrying capacity.",[30,297,51],{"id":298},"how-to-fix-it-5",[300,301,302,318],"table",{},[303,304,305],"thead",{},[306,307,308,312,315],"tr",{},[309,310,311],"th",{},"Cable cross-section",[309,313,314],{},"Max. fuse (gG)",[309,316,317],{},"Max. circuit breaker",[319,320,321,333,343,353,364],"tbody",{},[306,322,323,327,330],{},[324,325,326],"td",{},"1.5 mm²",[324,328,329],{},"10A",[324,331,332],{},"16A",[306,334,335,338,340],{},[324,336,337],{},"2.5 mm²",[324,339,332],{},[324,341,342],{},"20A",[306,344,345,348,350],{},[324,346,347],{},"4 mm²",[324,349,342],{},[324,351,352],{},"25A",[306,354,355,358,361],{},[324,356,357],{},"6 mm²",[324,359,360],{},"32A",[324,362,363],{},"40A",[306,365,366,369,372],{},[324,367,368],{},"10 mm²",[324,370,371],{},"50A",[324,373,374],{},"63A",[53,376,377,383],{},[56,378,379,380],{},"Reduce the breaker to the correct value ",[25,381,382],{},"or",[56,384,385],{},"Replace the cable with a larger cross-section",[30,387,123],{"id":388},"typical-costs-4",[11,390,391],{},"Reducing protection and replacing conductors are different remedies.",[15,393],{},[18,395,397],{"id":396},"_7-too-many-circuits-per-rcd","7. Too Many Circuits Per RCD",[11,399,400,402],{},[25,401,27],{}," Art. 4.2.4.3b (max. 8 final circuits per 30 mA RCD); Art. 5.3.5.2b (max. 8 sockets per final circuit)",[30,404,33],{"id":405},"description-6",[11,407,408,409,412],{},"The AREI limits the number of circuits per 30 mA RCD to ",[25,410,411],{},"maximum 8",". In older installations, all circuits often hang off a single RCD.",[30,414,40],{"id":415},"why-its-a-problem-6",[11,417,418],{},"When too many circuits are connected to one RCD, the probability of nuisance tripping increases (due to cumulative leakage currents). Additionally, a fault leaves the entire dwelling without power — not just the affected area.",[30,420,51],{"id":421},"how-to-fix-it-6",[53,423,424,427,430],{},[56,425,426],{},"Install additional 30 mA RCDs",[56,428,429],{},"Distribute circuits logically (e.g. by floor or function)",[56,431,432],{},"Maximum 8 circuits per 30 mA RCD",[30,434,123],{"id":435},"typical-costs-5",[11,437,438],{},"Board space, allocation, rating and measurements belong in the quotation.",[15,440],{},[18,442,444],{"id":443},"_8-missing-circuit-labelling","8. Missing Circuit Labelling",[11,446,447,449],{},[25,448,27],{}," Art. 3.1.3.1 (identification of circuits)",[30,451,33],{"id":452},"description-7",[11,454,455,456,459],{},"All breakers and RCDs in the distribution board must be ",[25,457,458],{},"clearly labelled",". The labelling must indicate which room or appliance is supplied by the respective circuit.",[30,461,40],{"id":462},"why-its-a-problem-7",[11,464,465],{},"Without labelling, the correct circuit cannot be quickly switched off in an emergency. Clear identification is also essential for maintenance work.",[30,467,51],{"id":468},"how-to-fix-it-7",[53,470,471,474,477],{},[56,472,473],{},"Apply readable labels to all breakers",[56,475,476],{},"Name by room and\u002For function (e.g. \"Kitchen sockets\", \"Bathroom lighting\")",[56,478,479],{},"Labelling must match the single-line diagram",[30,481,123],{"id":482},"typical-costs-6",[11,484,485],{},"Labels are simple; safely identifying unknown circuits may need a professional.",[15,487],{},[18,489,491],{"id":490},"_9-cables-without-protection","9. Cables Without Protection",[11,493,494,496],{},[25,495,27],{}," Art. 5.2.2 (installation methods) \u002F Art. 5.2.1.5 (mechanical protection)",[30,498,33],{"id":499},"description-8",[11,501,502],{},"Electrical cables must be routed in protective conduit (empty tubes), cable trays or wall chases. Exposed cables without mechanical protection — such as surface-mounted or loose in the basement — are a violation.",[30,504,40],{"id":505},"why-its-a-problem-8",[11,507,508],{},"Unprotected cables can be mechanically damaged (nails, screws, rodents). Damaged cable insulation can lead to short circuits and fires.",[30,510,51],{"id":511},"how-to-fix-it-8",[53,513,514,517,520],{},[56,515,516],{},"Route exposed cables through cable trays (protective conduit)",[56,518,519],{},"For surface mounting: use appropriate cable channels",[56,521,522],{},"Seal wall penetrations with fire-stop collars",[30,524,123],{"id":525},"typical-costs-7",[11,527,528],{},"Cable, environment, mechanical protection and building work define the solution.",[15,530],{},[18,532,534],{"id":533},"_10-missing-surge-protection-spd-for-new-installations","10. Missing Surge Protection (SPD) for New Installations",[11,536,537,539],{},[25,538,27],{}," Art. 4.5.1",[30,541,33],{"id":542},"description-9",[11,544,545],{},"Art. 4.5.1 generally requires that persons and property must be protected against the harmful effects of overvoltages — according to good professional practice. In practice, an SPD (surge protection device) is required for new installations and substantial extensions. For existing installations, it is recommended but not explicitly required.",[30,547,40],{"id":548},"why-its-a-problem-9",[11,550,551],{},"Surges from lightning strikes or grid disturbances can destroy sensitive electronics. An SPD safely diverts surges to earth and protects connected devices.",[30,553,51],{"id":554},"how-to-fix-it-9",[53,556,557,560,563],{},[56,558,559],{},"Install SPD Type 2 in the distribution board (after the main switch, before the RCDs)",[56,561,562],{},"With lightning protection: additionally SPD Type 1",[56,564,565],{},"Regularly check the SPD status indicator (green = OK)",[30,567,123],{"id":568},"typical-costs-8",[11,570,571],{},"SPD selection, coordination, connection and board alterations are project-specific.",[15,573],{},[18,575,577],{"id":576},"conclusion-the-self-check-as-planning-assistance","Conclusion: The Self-Check as Planning Assistance",[11,579,580,581,92,588,593],{},"PlanElec flags some supported planning issues. It cannot detect physical defects; the self-check remains partial and is not official. Sources are ",[582,583,587],"a",{"href":584,"rel":585},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[586],"nofollow","AREI\u002FRGIE Book 1 V06",[582,589,592],{"href":590,"rel":591},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[586],"official domestic-inspection guidance",", without a frequency ranking.",[15,595],{},[11,597,598],{},[25,599,600],{},"Related articles:",[53,602,603,609,615,621],{},[56,604,605],{},[582,606,608],{"href":607},"\u002Fen\u002Fblog\u002Finspection-failed-what-now","Inspection Failed — What Now?",[56,610,611],{},[582,612,614],{"href":613},"\u002Fen\u002Fblog\u002F30ma-rcd-per-socket","30 mA RCD: When Is It Mandatory?",[56,616,617],{},[582,618,620],{"href":619},"\u002Fen\u002Fblog\u002Fcable-cross-section-breaker","Cable Cross-Section and Breaker: The Right Combination",[56,622,623],{},[582,624,626],{"href":625},"\u002Fen\u002Fblog\u002Fbathroom-cables-arei-zones","Bathroom Cables and AREI Zones",[11,628,629,632,633],{},[25,630,631],{},"Structure your project with PlanElec and use the self-check to prepare for professional review and the official inspection."," ",[582,634,637],{"href":635,"rel":636},"https:\u002F\u002Fplanelec.be",[586],"Get started →",{"title":639,"searchDepth":640,"depth":640,"links":641},"",2,[642,649,655,661,667,673,679,685,691,697,703],{"id":20,"depth":640,"text":21,"children":643},[644,646,647,648],{"id":32,"depth":645,"text":33},3,{"id":39,"depth":645,"text":40},{"id":50,"depth":645,"text":51},{"id":67,"depth":645,"text":68},{"id":76,"depth":640,"text":77,"children":650},[651,652,653,654],{"id":85,"depth":645,"text":33},{"id":99,"depth":645,"text":40},{"id":105,"depth":645,"text":51},{"id":122,"depth":645,"text":123},{"id":131,"depth":640,"text":132,"children":656},[657,658,659,660],{"id":140,"depth":645,"text":33},{"id":146,"depth":645,"text":40},{"id":152,"depth":645,"text":51},{"id":172,"depth":645,"text":123},{"id":180,"depth":640,"text":181,"children":662},[663,664,665,666],{"id":189,"depth":645,"text":33},{"id":199,"depth":645,"text":40},{"id":205,"depth":645,"text":51},{"id":219,"depth":645,"text":123},{"id":227,"depth":640,"text":228,"children":668},[669,670,671,672],{"id":236,"depth":645,"text":33},{"id":242,"depth":645,"text":40},{"id":248,"depth":645,"text":51},{"id":265,"depth":645,"text":123},{"id":273,"depth":640,"text":274,"children":674},[675,676,677,678],{"id":282,"depth":645,"text":33},{"id":288,"depth":645,"text":40},{"id":298,"depth":645,"text":51},{"id":388,"depth":645,"text":123},{"id":396,"depth":640,"text":397,"children":680},[681,682,683,684],{"id":405,"depth":645,"text":33},{"id":415,"depth":645,"text":40},{"id":421,"depth":645,"text":51},{"id":435,"depth":645,"text":123},{"id":443,"depth":640,"text":444,"children":686},[687,688,689,690],{"id":452,"depth":645,"text":33},{"id":462,"depth":645,"text":40},{"id":468,"depth":645,"text":51},{"id":482,"depth":645,"text":123},{"id":490,"depth":640,"text":491,"children":692},[693,694,695,696],{"id":499,"depth":645,"text":33},{"id":505,"depth":645,"text":40},{"id":511,"depth":645,"text":51},{"id":525,"depth":645,"text":123},{"id":533,"depth":640,"text":534,"children":698},[699,700,701,702],{"id":542,"depth":645,"text":33},{"id":548,"depth":645,"text":40},{"id":554,"depth":645,"text":51},{"id":568,"depth":645,"text":123},{"id":576,"depth":640,"text":577},"guide","2026-06-20","Ten recurring checks for Belgian domestic installations, explained without an unsupported ranking, failure rate or cost promise.","md","2026-08-29","en",{},true,"\u002Fblog\u002Ftop-10-arei-violations.en","8 min",12,{"title":5,"description":706},"blog\u002Ftop-10-arei-violations.en",[718,719,720,721,722,723,724,725],"arei","violations","electrical-inspection","inspection","rcd","earthing","belgium","deficiencies","eFx1wSu98_ZTDXtuslHvjM1ytmcH59fFQwLkKYXD_VI",[728,1425,1915,2582],{"id":729,"title":730,"articleId":6,"body":731,"category":704,"date":705,"description":1409,"extension":707,"lastUpdated":708,"locale":1410,"meta":1411,"navigation":711,"path":1412,"publishDate":705,"readTime":713,"refreshInterval":714,"seo":1413,"slug":1414,"stem":1415,"tags":1416,"__hash__":1424},"blog\u002Fblog\u002Ftop-10-arei-violations.de.md","10 wichtige AREI-Kontrollpunkte: Erkennen, vermeiden und beheben",{"type":8,"value":732,"toc":1346},[733,736,738,742,748,752,755,759,766,770,781,785,788,790,794,799,802,813,816,819,822,837,840,843,845,849,853,856,859,862,865,868,885,888,891,893,897,902,905,912,915,918,921,932,935,938,940,944,948,951,954,957,960,963,977,980,983,985,989,994,997,1000,1003,1010,1013,1070,1081,1084,1087,1089,1093,1098,1101,1108,1111,1114,1117,1128,1131,1134,1136,1140,1145,1148,1155,1158,1161,1164,1175,1178,1181,1183,1187,1192,1195,1198,1201,1204,1207,1218,1221,1224,1226,1230,1234,1237,1240,1243,1246,1249,1260,1263,1266,1268,1272,1286,1289,1292,1294,1299,1325,1334],[11,734,735],{},"Diese zehn Punkte sind eine fachliche Prüfliste, keine statistische Rangfolge. Für eine belgienweite Durchfallquote oder Reihenfolge liegt keine belastbare amtliche Datengrundlage vor. Der konkrete Kontrollbericht bleibt maßgeblich.",[15,737],{},[18,739,741],{"id":740},"_1-fehlender-oder-falscher-fi-schutzschalter","1. Fehlender oder falscher FI-Schutzschalter",[11,743,744,747],{},[25,745,746],{},"AREI-Artikel:"," Art. 4.2.4.3 (Haupt-RCD) \u002F Art. 4.2.4.3 Abs. b (30mA-Gruppen-FI-Pflicht)",[30,749,751],{"id":750},"beschreibung","Beschreibung",[11,753,754],{},"Ein wichtiger Prüfschwerpunkt ist ein fehlender, ungeeigneter oder falsch bemessener FI-Schutzschalter (Differenzialschalter, RCD). Das AREI nennt für hauswirtschaftliche Anlagen insbesondere Steckdosen, Beleuchtung, Räume mit Badewanne oder Dusche sowie Waschmaschine, Trockner und Geschirrspüler als Stromkreise hinter einem hoch- oder sehr hochempfindlichen RCD. Daraus folgt keine belgienweite Häufigkeitsrangfolge.",[30,756,758],{"id":757},"warum-es-ein-problem-ist","Warum es ein Problem ist",[11,760,761,762,765],{},"Der FI-Schalter ist der wichtigste Personenschutz in einer Elektroinstallation. Er erkennt Fehlerströme (z. B. wenn Strom über den menschlichen Körper fließt) und schaltet innerhalb von Millisekunden ab. Ohne FI-Schutz besteht ",[25,763,764],{},"Lebensgefahr"," bei Isolationsfehlern.",[30,767,769],{"id":768},"wie-man-es-behebt","Wie man es behebt",[53,771,772,775,778],{},[56,773,774],{},"RCD-Typ und Schutzkombination aus erwartetem Fehlerstromspektrum, Netzform, Herstellerunterlagen und Sonderkapitel ableiten. Bei Ladepunkten sind der individuelle AC-RCD-Schutz und der Schutz gegen glatte DC-Fehlerströme gemeinsam zu beurteilen; bei Wechselrichtern gilt die Dokumentation der konkreten Variante.",[56,776,777],{},"Maximal 8 Endstromkreise pro 30-mA-RCD (AREI Art. 4.2.4.3b)",[56,779,780],{},"Am Ursprung ist mindestens ein RCD mit höchstens 300 mA erforderlich; hauswirtschaftliche RCDs sind mindestens Typ A. Ob zeitverzögerte beziehungsweise selektive Ausführung nötig ist, ergibt sich aus der projektspezifischen Koordination und nicht aus einer pauschalen Typ-A-S-Regel.",[30,782,784],{"id":783},"projektspezifischer-aufwand","Projektspezifischer Aufwand",[11,786,787],{},"Gerät, Polzahl, Platz, Verdrahtung und Messungen bestimmen das Angebot.",[15,789],{},[18,791,793],{"id":792},"_2-fehlende-oder-veraltete-elektropläne","2. Fehlende oder veraltete Elektropläne",[11,795,796,798],{},[25,797,746],{}," Art. 9.1.2 Nr. 1 (Eindrahtschema), Art. 9.1.2 Nr. 2 (Situationsplan\u002FLageplan)",[30,800,751],{"id":801},"beschreibung-1",[11,803,804,805,808,809,812],{},"Das AREI verlangt ein aktuelles ",[25,806,807],{},"Eindrahtschema"," und einen ",[25,810,811],{},"Situationsplan"," für jede Elektroinstallation. Häufig fehlen diese Pläne komplett oder sie spiegeln nicht den aktuellen Zustand der Installation wider — z. B. weil nach dem Bau Stromkreise hinzugefügt oder geändert wurden.",[30,814,758],{"id":815},"warum-es-ein-problem-ist-1",[11,817,818],{},"Ohne aktuelle Pläne kann weder der Kontrolleur noch ein Elektriker die Installation sicher beurteilen. Im Notfall (Brand, Unfall) fehlt die Dokumentation, welcher Schalter welchen Bereich versorgt.",[30,820,769],{"id":821},"wie-man-es-behebt-1",[53,823,824,827,830],{},[56,825,826],{},"Eindrahtschema und Situationsplan erstellen oder aktualisieren",[56,828,829],{},"Alle Stromkreise, Sicherungen, RCDs und Verbraucher dokumentieren",[56,831,832,833,836],{},"Pläne müssen den ",[25,834,835],{},"tatsächlichen Ist-Zustand"," zeigen",[30,838,784],{"id":839},"projektspezifischer-aufwand-1",[11,841,842],{},"Ausgangsdaten und notwendige Stromkreisverfolgung bestimmen den Aufwand; Software ersetzt keine Aufnahme.",[15,844],{},[18,846,848],{"id":847},"_3-fehlerhafte-erdung","3. Fehlerhafte Erdung",[11,850,851,137],{},[25,852,746],{},[30,854,751],{"id":855},"beschreibung-2",[11,857,858],{},"Die Erdung ist Teil des Schutzkonzepts der Elektroinstallation. Ein Messwert über 30 Ohm ist nach Art. 4.2.4.3b nicht automatisch mit einer fehlenden Erdung gleichzusetzen: Er löst zusätzliche Anforderungen an die Fehlerstrom-Schutzeinrichtungen aus. Ein Mangel liegt beispielsweise vor, wenn die Erdung fehlt oder beschädigt ist oder wenn die zum Messwert gehörende Schutzanordnung nicht erfüllt wird. Lockere Verbindungen und korrodierte Erdungsleiter müssen ebenfalls fachlich beurteilt werden.",[30,860,758],{"id":861},"warum-es-ein-problem-ist-2",[11,863,864],{},"Ohne funktionierende Erdung können metallische Gehäuse unter Spannung stehen, ohne dass der FI-Schalter auslöst. Das schafft eine unsichtbare Todesfalle.",[30,866,769],{"id":867},"wie-man-es-behebt-2",[53,869,870,873,876,879,882],{},[56,871,872],{},"Erdungswiderstand messen lassen",[56,874,875],{},"Bei >30 Ohm die in Buch 1 geforderte ergänzende RCD-Anordnung prüfen: mindestens zwei hoch- oder sehr hochempfindliche RCDs, höchstens 16 einfache oder mehrfache Steckdosen je solchem RCD sowie ergänzender Schutz der übrigen betroffenen Stromkreise",[56,877,878],{},"Fachlich entscheiden, ob Erdungsanlage verbessert, Schutzanordnung angepasst oder beides ausgeführt wird",[56,880,881],{},"Alle Erdungsverbindungen prüfen und ggf. nachziehen",[56,883,884],{},"Erdungsleiter auf Korrosion kontrollieren",[30,886,784],{"id":887},"projektspezifischer-aufwand-2",[11,889,890],{},"Messwert, Bestand, Erdreich und Facharbeiten bestimmen die Lösung.",[15,892],{},[18,894,896],{"id":895},"_4-fehlender-hauptschalter","4. Fehlender Hauptschalter",[11,898,899,901],{},[25,900,746],{}," Art. 5.3.5.1b (Haupt-Lasttrennschalter)",[30,903,751],{"id":904},"beschreibung-3",[11,906,907,908,911],{},"Jede Elektroinstallation muss über einen ",[25,909,910],{},"allpoligen Hauptschalter"," verfügen, mit dem die gesamte Installation spannungsfrei geschaltet werden kann. Der Hauptschalter muss mindestens 40A ausgelegt sein (bei Standardwohnungen).",[30,913,758],{"id":914},"warum-es-ein-problem-ist-3",[11,916,917],{},"Im Notfall muss die gesamte Installation mit einem einzigen Handgriff abgeschaltet werden können — z. B. bei Brand, Überschwemmung oder Unfall. Fehlt der Hauptschalter, kann das lebensrettende Sekunden kosten.",[30,919,769],{"id":920},"wie-man-es-behebt-3",[53,922,923,926,929],{},[56,924,925],{},"Allpoligen Hauptschalter ≥40A vor dem ersten RCD installieren",[56,927,928],{},"Der Schalter muss leicht zugänglich sein (Verteilerkasten)",[56,930,931],{},"Bei dreiphasiger Installation: 4-poligen Hauptschalter verwenden",[30,933,784],{"id":934},"projektspezifischer-aufwand-3",[11,936,937],{},"Bemessung, Polzahl, Platz und Verteilerumbau werden projektspezifisch geprüft.",[15,939],{},[18,941,943],{"id":942},"_5-badezimmer-zonen-missachtet","5. Badezimmer-Zonen missachtet",[11,945,946,233],{},[25,947,746],{},[30,949,751],{"id":950},"beschreibung-4",[11,952,953],{},"Das AREI definiert Schutzzonen im Badezimmer (Zone 0, 1, 2 und Bereich außerhalb der Zonen), in denen jeweils nur bestimmte elektrische Geräte erlaubt sind. Häufige Verstöße: Steckdosen in Zone 0 oder 1, fehlender Spritzwasserschutz, Schalter in zu geringem Abstand zur Badewanne oder Dusche.",[30,955,758],{"id":956},"warum-es-ein-problem-ist-4",[11,958,959],{},"Wasser und Strom sind eine tödliche Kombination. Die Badezimmer-Zonen stellen sicher, dass elektrische Geräte einen ausreichenden Sicherheitsabstand zu Wasserquellen haben.",[30,961,769],{"id":962},"wie-man-es-behebt-4",[53,964,965,968,971,974],{},[56,966,967],{},"Steckdosen und Schalter außerhalb von Zone 0 und 1 verlegen (mindestens 60 cm von Badewanne\u002FDusche)",[56,969,970],{},"In Zone 2: nur IPX4-geschützte Geräte (Spritzwasserschutz)",[56,972,973],{},"Alle Badezimmer-Stromkreise über 30-mA-RCD absichern",[56,975,976],{},"Keine Verteilerdosen in Zone 0 oder 1",[30,978,784],{"id":979},"projektspezifischer-aufwand-4",[11,981,982],{},"Position, Leitungsweg, Oberfläche und Betriebsmittel bestimmen den Umfang.",[15,984],{},[18,986,988],{"id":987},"_6-kabelquerschnitt-zu-dünn-für-die-sicherung","6. Kabelquerschnitt zu dünn für die Sicherung",[11,990,991,993],{},[25,992,746],{}," Art. 4.4.1 (Überstromschutz) \u002F Art. 5.2.1.2 (Wahl elektrischer Leitungen)",[30,995,751],{"id":996},"beschreibung-5",[11,998,999],{},"Die Sicherung (MCB) muss zum Kabelquerschnitt passen. Eine häufige Kombination: 20A-Sicherung auf einem 1.5 mm²-Kabel (das nur für 16A ausgelegt ist). Die Sicherung schützt das Kabel dann nicht vor Überlastung.",[30,1001,758],{"id":1002},"warum-es-ein-problem-ist-5",[11,1004,1005,1006,1009],{},"Wenn ein Kabel mehr Strom führt, als es verträgt, erhitzt es sich und kann Brände verursachen. Die Sicherung muss ",[25,1007,1008],{},"immer kleiner oder gleich"," der Belastbarkeit des Kabels sein.",[30,1011,769],{"id":1012},"wie-man-es-behebt-5",[300,1014,1015,1028],{},[303,1016,1017],{},[306,1018,1019,1022,1025],{},[309,1020,1021],{},"Kabelquerschnitt",[309,1023,1024],{},"Max. Sicherung (gG)",[309,1026,1027],{},"Max. Leitungsschutzschalter",[319,1029,1030,1038,1046,1054,1062],{},[306,1031,1032,1034,1036],{},[324,1033,326],{},[324,1035,329],{},[324,1037,332],{},[306,1039,1040,1042,1044],{},[324,1041,337],{},[324,1043,332],{},[324,1045,342],{},[306,1047,1048,1050,1052],{},[324,1049,347],{},[324,1051,342],{},[324,1053,352],{},[306,1055,1056,1058,1060],{},[324,1057,357],{},[324,1059,360],{},[324,1061,363],{},[306,1063,1064,1066,1068],{},[324,1065,368],{},[324,1067,371],{},[324,1069,374],{},[53,1071,1072,1078],{},[56,1073,1074,1075],{},"Sicherung auf den korrekten Wert herabsetzen ",[25,1076,1077],{},"oder",[56,1079,1080],{},"Kabel durch größeren Querschnitt ersetzen",[30,1082,784],{"id":1083},"projektspezifischer-aufwand-5",[11,1085,1086],{},"Schutz reduzieren und Leitung ersetzen sind fachlich unterschiedliche Lösungen.",[15,1088],{},[18,1090,1092],{"id":1091},"_7-zu-viele-stromkreise-pro-fi-schalter","7. Zu viele Stromkreise pro FI-Schalter",[11,1094,1095,1097],{},[25,1096,746],{}," Art. 4.2.4.3b (max. 8 Endstromkreise pro 30-mA-RCD); Art. 5.3.5.2b (max. 8 Steckdosen pro Endstromkreis)",[30,1099,751],{"id":1100},"beschreibung-6",[11,1102,1103,1104,1107],{},"Das AREI begrenzt die Anzahl der Stromkreise pro 30-mA-RCD auf ",[25,1105,1106],{},"maximal 8",". Bei älteren Installationen hängen oft alle Stromkreise an einem einzigen RCD.",[30,1109,758],{"id":1110},"warum-es-ein-problem-ist-6",[11,1112,1113],{},"Wenn zu viele Stromkreise an einem RCD hängen, steigt die Wahrscheinlichkeit von Fehlauslösungen (durch Addition der Ableitströme). Außerdem ist bei einem Fehler die gesamte Wohnung stromlos — nicht nur der betroffene Bereich.",[30,1115,769],{"id":1116},"wie-man-es-behebt-6",[53,1118,1119,1122,1125],{},[56,1120,1121],{},"Zusätzliche 30-mA-RCDs installieren",[56,1123,1124],{},"Stromkreise sinnvoll aufteilen (z. B. nach Etage oder Funktion)",[56,1126,1127],{},"Maximal 8 Stromkreise pro 30-mA-RCD",[30,1129,784],{"id":1130},"projektspezifischer-aufwand-6",[11,1132,1133],{},"Verteilerplatz, Aufteilung, Bemessung und Messungen gehören ins Angebot.",[15,1135],{},[18,1137,1139],{"id":1138},"_8-fehlende-beschriftung-der-stromkreise","8. Fehlende Beschriftung der Stromkreise",[11,1141,1142,1144],{},[25,1143,746],{}," Art. 3.1.3.1 (Kennzeichnung von Stromkreisen)",[30,1146,751],{"id":1147},"beschreibung-7",[11,1149,1150,1151,1154],{},"Alle Sicherungen und RCDs im Verteilerkasten müssen ",[25,1152,1153],{},"eindeutig beschriftet"," sein. Die Beschriftung muss angeben, welcher Raum oder welches Gerät vom jeweiligen Stromkreis versorgt wird.",[30,1156,758],{"id":1157},"warum-es-ein-problem-ist-7",[11,1159,1160],{},"Ohne Beschriftung kann im Notfall nicht schnell der richtige Stromkreis abgeschaltet werden. Auch für Wartungsarbeiten ist eine klare Zuordnung unerlässlich.",[30,1162,769],{"id":1163},"wie-man-es-behebt-7",[53,1165,1166,1169,1172],{},[56,1167,1168],{},"Alle Sicherungen mit lesbaren Etiketten versehen",[56,1170,1171],{},"Bezeichnung nach Raum und\u002Foder Funktion (z. B. \"Küche Steckdosen\", \"Badezimmer Licht\")",[56,1173,1174],{},"Beschriftung muss mit dem Eindrahtschema übereinstimmen",[30,1176,784],{"id":1177},"projektspezifischer-aufwand-7",[11,1179,1180],{},"Beschriftung ist klein; unbekannte Stromkreise sicher zu identifizieren kann Facharbeit sein.",[15,1182],{},[18,1184,1186],{"id":1185},"_9-kabel-ohne-schutz","9. Kabel ohne Schutz",[11,1188,1189,1191],{},[25,1190,746],{}," Art. 5.2.2 (Verlegearten) \u002F Art. 5.2.1.5 (mechanische Festigkeit)",[30,1193,751],{"id":1194},"beschreibung-8",[11,1196,1197],{},"Elektrokabel müssen in Schutzrohren (Leerrohren), Kabelkanälen oder Wandschlitzen verlegt werden. Freiliegende Kabel ohne mechanischen Schutz — etwa über Putz oder lose im Keller — sind ein Verstoß.",[30,1199,758],{"id":1200},"warum-es-ein-problem-ist-8",[11,1202,1203],{},"Ungeschützte Kabel können mechanisch beschädigt werden (Nagel, Schraube, Nagetiere). Eine beschädigte Kabelisolierung kann zu Kurzschlüssen und Bränden führen.",[30,1205,769],{"id":1206},"wie-man-es-behebt-8",[53,1208,1209,1212,1215],{},[56,1210,1211],{},"Freiliegende Kabel in Kabelkanäle (Leerrohre) verlegen",[56,1213,1214],{},"Bei Aufputzverlegung: geeignete Kabelkanäle verwenden",[56,1216,1217],{},"Durchführungen durch Wände mit Brandschutzmanschetten abdichten",[30,1219,784],{"id":1220},"projektspezifischer-aufwand-8",[11,1222,1223],{},"Leitung, Umgebung, mechanischer Schutz und baulicher Eingriff bestimmen die Ausführung.",[15,1225],{},[18,1227,1229],{"id":1228},"_10-fehlender-überspannungsschutz-spd-bei-neuinstallation","10. Fehlender Überspannungsschutz (SPD) bei Neuinstallation",[11,1231,1232,539],{},[25,1233,746],{},[30,1235,751],{"id":1236},"beschreibung-9",[11,1238,1239],{},"Art. 4.5.1 schreibt allgemein vor, dass Personen und Güter vor den schädlichen Folgen von Überspannungen geschützt werden müssen — nach den Regeln des Fachs. In der Praxis wird bei Neuinstallationen und wesentlichen Erweiterungen ein SPD (Überspannungsschutz) gefordert. Bei bestehenden Installationen ist er empfohlen, aber nicht ausdrücklich vorgeschrieben.",[30,1241,758],{"id":1242},"warum-es-ein-problem-ist-9",[11,1244,1245],{},"Überspannungen durch Blitzschlag oder Netzstörungen können empfindliche Elektronik zerstören. Ein SPD leitet Überspannungen sicher zur Erde ab und schützt die angeschlossenen Geräte.",[30,1247,769],{"id":1248},"wie-man-es-behebt-9",[53,1250,1251,1254,1257],{},[56,1252,1253],{},"SPD Typ 2 im Verteilerkasten installieren (nach dem Hauptschalter, vor den RCDs)",[56,1255,1256],{},"Bei Blitzschutzanlage zusätzlich SPD Typ 1",[56,1258,1259],{},"Regelmäßig die Statusanzeige des SPD prüfen (grün = OK)",[30,1261,784],{"id":1262},"projektspezifischer-aufwand-9",[11,1264,1265],{},"SPD-Auswahl, Koordination, Anschluss und Verteilerumbau sind projektspezifisch.",[15,1267],{},[18,1269,1271],{"id":1270},"fazit-selbstcheck-als-planungshilfe","Fazit: Selbstcheck als Planungshilfe",[11,1273,1274,1275,1279,1280,1285],{},"PlanElec weist auf unterstützte Planungsprobleme hin. Physische Mängel erkennt ein Planungstool nicht; der Selbstcheck bleibt teilweise und ist keine offizielle Prüfung. Quellen sind ",[582,1276,1278],{"href":584,"rel":1277},[586],"AREI\u002FRGIE Buch 1 V06"," und die ",[582,1281,1284],{"href":1282,"rel":1283},"https:\u002F\u002Feconomie.fgov.be\u002Fde\u002Fthemen\u002Fenergie\u002Fsicherheit-und-kontrolle\u002Fkontrolle-von-elektrischen",[586],"amtliche Kontrollübersicht",", ohne Häufigkeitsrangliste.",[11,1287,1288],{},"Nutzen Sie die Punkte in zwei Durchgängen: zuerst Dokumentation und Referenzen, danach den realen Zustand, Messwerte und Schutzfunktionen durch befähigte Personen. Eine korrigierte Zeichnung beweist nicht, dass ein physischer Mangel behoben ist. Umgekehrt muss eine ausgeführte Korrektur wieder in Schema und Lageplan erscheinen. Markieren Sie jeden offenen Punkt mit Quelle und Verantwortlichem. So bleibt die Liste eine nachvollziehbare Vorbereitung und kein Versprechen über den Ausgang der Kontrolle.",[11,1290,1291],{},"Bewahren Sie die datierte Fassung zusammen mit Kontrollbericht, Messnachweisen und Herstellerunterlagen auf. Dadurch bleibt später erkennbar, welche Aussage auf Dokumentation und welche auf einer tatsächlichen Prüfung beruht.",[15,1293],{},[11,1295,1296],{},[25,1297,1298],{},"Verwandte Artikel:",[53,1300,1301,1307,1313,1319],{},[56,1302,1303],{},[582,1304,1306],{"href":1305},"\u002Fde\u002Fblog\u002Fstromabnahme-durchgefallen","Stromabnahme durchgefallen — was nun?",[56,1308,1309],{},[582,1310,1312],{"href":1311},"\u002Fde\u002Fblog\u002F30ma-fi-schutzschalter","30 mA FI-Schutzschalter: Wann ist er Pflicht?",[56,1314,1315],{},[582,1316,1318],{"href":1317},"\u002Fde\u002Fblog\u002Fkabelquerschnitt-sicherung","Kabelquerschnitt und Sicherung: Die richtige Kombination",[56,1320,1321],{},[582,1322,1324],{"href":1323},"\u002Fde\u002Fblog\u002Fbadezimmer-kabel-arei-zonen","Badezimmer-Kabel und AREI-Zonen",[11,1326,1327,632,1330],{},[25,1328,1329],{},"Strukturieren Sie Ihre Planung mit PlanElec und nutzen Sie den Selbstcheck als Vorbereitung auf die fachliche und offizielle Prüfung.",[582,1331,1333],{"href":635,"rel":1332},[586],"Jetzt starten →",[11,1335,1336,1337,1340,1341,1345],{},"Primärquellen: ",[582,1338,1278],{"href":584,"rel":1339},[586]," und ",[582,1342,1344],{"href":1282,"rel":1343},[586],"FÖD-Übersicht zur Hausanlagenkontrolle",". Sie belegen Pflichten, keine Häufigkeitsrangliste.",{"title":639,"searchDepth":640,"depth":640,"links":1347},[1348,1354,1360,1366,1372,1378,1384,1390,1396,1402,1408],{"id":740,"depth":640,"text":741,"children":1349},[1350,1351,1352,1353],{"id":750,"depth":645,"text":751},{"id":757,"depth":645,"text":758},{"id":768,"depth":645,"text":769},{"id":783,"depth":645,"text":784},{"id":792,"depth":640,"text":793,"children":1355},[1356,1357,1358,1359],{"id":801,"depth":645,"text":751},{"id":815,"depth":645,"text":758},{"id":821,"depth":645,"text":769},{"id":839,"depth":645,"text":784},{"id":847,"depth":640,"text":848,"children":1361},[1362,1363,1364,1365],{"id":855,"depth":645,"text":751},{"id":861,"depth":645,"text":758},{"id":867,"depth":645,"text":769},{"id":887,"depth":645,"text":784},{"id":895,"depth":640,"text":896,"children":1367},[1368,1369,1370,1371],{"id":904,"depth":645,"text":751},{"id":914,"depth":645,"text":758},{"id":920,"depth":645,"text":769},{"id":934,"depth":645,"text":784},{"id":942,"depth":640,"text":943,"children":1373},[1374,1375,1376,1377],{"id":950,"depth":645,"text":751},{"id":956,"depth":645,"text":758},{"id":962,"depth":645,"text":769},{"id":979,"depth":645,"text":784},{"id":987,"depth":640,"text":988,"children":1379},[1380,1381,1382,1383],{"id":996,"depth":645,"text":751},{"id":1002,"depth":645,"text":758},{"id":1012,"depth":645,"text":769},{"id":1083,"depth":645,"text":784},{"id":1091,"depth":640,"text":1092,"children":1385},[1386,1387,1388,1389],{"id":1100,"depth":645,"text":751},{"id":1110,"depth":645,"text":758},{"id":1116,"depth":645,"text":769},{"id":1130,"depth":645,"text":784},{"id":1138,"depth":640,"text":1139,"children":1391},[1392,1393,1394,1395],{"id":1147,"depth":645,"text":751},{"id":1157,"depth":645,"text":758},{"id":1163,"depth":645,"text":769},{"id":1177,"depth":645,"text":784},{"id":1185,"depth":640,"text":1186,"children":1397},[1398,1399,1400,1401],{"id":1194,"depth":645,"text":751},{"id":1200,"depth":645,"text":758},{"id":1206,"depth":645,"text":769},{"id":1220,"depth":645,"text":784},{"id":1228,"depth":640,"text":1229,"children":1403},[1404,1405,1406,1407],{"id":1236,"depth":645,"text":751},{"id":1242,"depth":645,"text":758},{"id":1248,"depth":645,"text":769},{"id":1262,"depth":645,"text":784},{"id":1270,"depth":640,"text":1271},"Zehn wiederkehrende Prüfpunkte für belgische Hausinstallationen, fachlich eingeordnet ohne unbelegte Rangliste, Durchfallquote oder Kostenversprechen.","de",{},"\u002Fblog\u002Ftop-10-arei-violations.de",{"title":730,"description":1409},"10-haeufigste-arei-verstoesse","blog\u002Ftop-10-arei-violations.de",[718,1417,1418,1419,1420,1421,1422,1423],"verstöße","elektrokontrolle","keuring","fi-schalter","erdung","belgien","mängel","TrF2B4yehDyVhriNq6yPlwLvLKBzS3QCAPRhYP8ib30",{"id":4,"title":5,"articleId":6,"body":1426,"category":704,"date":705,"description":706,"extension":707,"lastUpdated":708,"locale":709,"meta":1912,"navigation":711,"path":712,"publishDate":705,"readTime":713,"refreshInterval":714,"seo":1913,"slug":6,"stem":716,"tags":1914,"__hash__":726},{"type":8,"value":1427,"toc":1849},[1428,1430,1432,1434,1438,1440,1442,1444,1448,1450,1458,1460,1462,1464,1466,1470,1472,1478,1480,1482,1484,1494,1496,1498,1500,1502,1506,1508,1510,1512,1514,1516,1528,1530,1532,1534,1536,1540,1542,1546,1548,1550,1552,1560,1562,1564,1566,1568,1572,1574,1576,1578,1580,1582,1592,1594,1596,1598,1600,1604,1606,1608,1610,1614,1616,1670,1678,1680,1682,1684,1686,1690,1692,1696,1698,1700,1702,1710,1712,1714,1716,1718,1722,1724,1728,1730,1732,1734,1742,1744,1746,1748,1750,1754,1756,1758,1760,1762,1764,1772,1774,1776,1778,1780,1784,1786,1788,1790,1792,1794,1802,1804,1806,1808,1810,1818,1820,1824,1842],[11,1429,13],{},[15,1431],{},[18,1433,21],{"id":20},[11,1435,1436,28],{},[25,1437,27],{},[30,1439,33],{"id":32},[11,1441,36],{},[30,1443,40],{"id":39},[11,1445,43,1446,47],{},[25,1447,46],{},[30,1449,51],{"id":50},[53,1451,1452,1454,1456],{},[56,1453,58],{},[56,1455,61],{},[56,1457,64],{},[30,1459,68],{"id":67},[11,1461,71],{},[15,1463],{},[18,1465,77],{"id":76},[11,1467,1468,82],{},[25,1469,27],{},[30,1471,33],{"id":85},[11,1473,88,1474,92,1476,96],{},[25,1475,91],{},[25,1477,95],{},[30,1479,40],{"id":99},[11,1481,102],{},[30,1483,51],{"id":105},[53,1485,1486,1488,1490],{},[56,1487,110],{},[56,1489,113],{},[56,1491,116,1492],{},[25,1493,119],{},[30,1495,123],{"id":122},[11,1497,126],{},[15,1499],{},[18,1501,132],{"id":131},[11,1503,1504,137],{},[25,1505,27],{},[30,1507,33],{"id":140},[11,1509,143],{},[30,1511,40],{"id":146},[11,1513,149],{},[30,1515,51],{"id":152},[53,1517,1518,1520,1522,1524,1526],{},[56,1519,157],{},[56,1521,160],{},[56,1523,163],{},[56,1525,166],{},[56,1527,169],{},[30,1529,123],{"id":172},[11,1531,175],{},[15,1533],{},[18,1535,181],{"id":180},[11,1537,1538,186],{},[25,1539,27],{},[30,1541,33],{"id":189},[11,1543,192,1544,196],{},[25,1545,195],{},[30,1547,40],{"id":199},[11,1549,202],{},[30,1551,51],{"id":205},[53,1553,1554,1556,1558],{},[56,1555,210],{},[56,1557,213],{},[56,1559,216],{},[30,1561,123],{"id":219},[11,1563,222],{},[15,1565],{},[18,1567,228],{"id":227},[11,1569,1570,233],{},[25,1571,27],{},[30,1573,33],{"id":236},[11,1575,239],{},[30,1577,40],{"id":242},[11,1579,245],{},[30,1581,51],{"id":248},[53,1583,1584,1586,1588,1590],{},[56,1585,253],{},[56,1587,256],{},[56,1589,259],{},[56,1591,262],{},[30,1593,123],{"id":265},[11,1595,268],{},[15,1597],{},[18,1599,274],{"id":273},[11,1601,1602,279],{},[25,1603,27],{},[30,1605,33],{"id":282},[11,1607,285],{},[30,1609,40],{"id":288},[11,1611,291,1612,295],{},[25,1613,294],{},[30,1615,51],{"id":298},[300,1617,1618,1628],{},[303,1619,1620],{},[306,1621,1622,1624,1626],{},[309,1623,311],{},[309,1625,314],{},[309,1627,317],{},[319,1629,1630,1638,1646,1654,1662],{},[306,1631,1632,1634,1636],{},[324,1633,326],{},[324,1635,329],{},[324,1637,332],{},[306,1639,1640,1642,1644],{},[324,1641,337],{},[324,1643,332],{},[324,1645,342],{},[306,1647,1648,1650,1652],{},[324,1649,347],{},[324,1651,342],{},[324,1653,352],{},[306,1655,1656,1658,1660],{},[324,1657,357],{},[324,1659,360],{},[324,1661,363],{},[306,1663,1664,1666,1668],{},[324,1665,368],{},[324,1667,371],{},[324,1669,374],{},[53,1671,1672,1676],{},[56,1673,379,1674],{},[25,1675,382],{},[56,1677,385],{},[30,1679,123],{"id":388},[11,1681,391],{},[15,1683],{},[18,1685,397],{"id":396},[11,1687,1688,402],{},[25,1689,27],{},[30,1691,33],{"id":405},[11,1693,408,1694,412],{},[25,1695,411],{},[30,1697,40],{"id":415},[11,1699,418],{},[30,1701,51],{"id":421},[53,1703,1704,1706,1708],{},[56,1705,426],{},[56,1707,429],{},[56,1709,432],{},[30,1711,123],{"id":435},[11,1713,438],{},[15,1715],{},[18,1717,444],{"id":443},[11,1719,1720,449],{},[25,1721,27],{},[30,1723,33],{"id":452},[11,1725,455,1726,459],{},[25,1727,458],{},[30,1729,40],{"id":462},[11,1731,465],{},[30,1733,51],{"id":468},[53,1735,1736,1738,1740],{},[56,1737,473],{},[56,1739,476],{},[56,1741,479],{},[30,1743,123],{"id":482},[11,1745,485],{},[15,1747],{},[18,1749,491],{"id":490},[11,1751,1752,496],{},[25,1753,27],{},[30,1755,33],{"id":499},[11,1757,502],{},[30,1759,40],{"id":505},[11,1761,508],{},[30,1763,51],{"id":511},[53,1765,1766,1768,1770],{},[56,1767,516],{},[56,1769,519],{},[56,1771,522],{},[30,1773,123],{"id":525},[11,1775,528],{},[15,1777],{},[18,1779,534],{"id":533},[11,1781,1782,539],{},[25,1783,27],{},[30,1785,33],{"id":542},[11,1787,545],{},[30,1789,40],{"id":548},[11,1791,551],{},[30,1793,51],{"id":554},[53,1795,1796,1798,1800],{},[56,1797,559],{},[56,1799,562],{},[56,1801,565],{},[30,1803,123],{"id":568},[11,1805,571],{},[15,1807],{},[18,1809,577],{"id":576},[11,1811,580,1812,92,1815,593],{},[582,1813,587],{"href":584,"rel":1814},[586],[582,1816,592],{"href":590,"rel":1817},[586],[15,1819],{},[11,1821,1822],{},[25,1823,600],{},[53,1825,1826,1830,1834,1838],{},[56,1827,1828],{},[582,1829,608],{"href":607},[56,1831,1832],{},[582,1833,614],{"href":613},[56,1835,1836],{},[582,1837,620],{"href":619},[56,1839,1840],{},[582,1841,626],{"href":625},[11,1843,1844,632,1846],{},[25,1845,631],{},[582,1847,637],{"href":635,"rel":1848},[586],{"title":639,"searchDepth":640,"depth":640,"links":1850},[1851,1857,1863,1869,1875,1881,1887,1893,1899,1905,1911],{"id":20,"depth":640,"text":21,"children":1852},[1853,1854,1855,1856],{"id":32,"depth":645,"text":33},{"id":39,"depth":645,"text":40},{"id":50,"depth":645,"text":51},{"id":67,"depth":645,"text":68},{"id":76,"depth":640,"text":77,"children":1858},[1859,1860,1861,1862],{"id":85,"depth":645,"text":33},{"id":99,"depth":645,"text":40},{"id":105,"depth":645,"text":51},{"id":122,"depth":645,"text":123},{"id":131,"depth":640,"text":132,"children":1864},[1865,1866,1867,1868],{"id":140,"depth":645,"text":33},{"id":146,"depth":645,"text":40},{"id":152,"depth":645,"text":51},{"id":172,"depth":645,"text":123},{"id":180,"depth":640,"text":181,"children":1870},[1871,1872,1873,1874],{"id":189,"depth":645,"text":33},{"id":199,"depth":645,"text":40},{"id":205,"depth":645,"text":51},{"id":219,"depth":645,"text":123},{"id":227,"depth":640,"text":228,"children":1876},[1877,1878,1879,1880],{"id":236,"depth":645,"text":33},{"id":242,"depth":645,"text":40},{"id":248,"depth":645,"text":51},{"id":265,"depth":645,"text":123},{"id":273,"depth":640,"text":274,"children":1882},[1883,1884,1885,1886],{"id":282,"depth":645,"text":33},{"id":288,"depth":645,"text":40},{"id":298,"depth":645,"text":51},{"id":388,"depth":645,"text":123},{"id":396,"depth":640,"text":397,"children":1888},[1889,1890,1891,1892],{"id":405,"depth":645,"text":33},{"id":415,"depth":645,"text":40},{"id":421,"depth":645,"text":51},{"id":435,"depth":645,"text":123},{"id":443,"depth":640,"text":444,"children":1894},[1895,1896,1897,1898],{"id":452,"depth":645,"text":33},{"id":462,"depth":645,"text":40},{"id":468,"depth":645,"text":51},{"id":482,"depth":645,"text":123},{"id":490,"depth":640,"text":491,"children":1900},[1901,1902,1903,1904],{"id":499,"depth":645,"text":33},{"id":505,"depth":645,"text":40},{"id":511,"depth":645,"text":51},{"id":525,"depth":645,"text":123},{"id":533,"depth":640,"text":534,"children":1906},[1907,1908,1909,1910],{"id":542,"depth":645,"text":33},{"id":548,"depth":645,"text":40},{"id":554,"depth":645,"text":51},{"id":568,"depth":645,"text":123},{"id":576,"depth":640,"text":577},{},{"title":5,"description":706},[718,719,720,721,722,723,724,725],{"id":1916,"title":1917,"articleId":6,"body":1918,"category":704,"date":705,"description":2565,"extension":707,"lastUpdated":708,"locale":2566,"meta":2567,"navigation":711,"path":2568,"publishDate":705,"readTime":713,"refreshInterval":714,"seo":2569,"slug":2570,"stem":2571,"tags":2572,"__hash__":2581},"blog\u002Fblog\u002Ftop-10-arei-violations.fr.md","10 points de contrôle RGIE importants : Identifier, éviter et corriger",{"type":8,"value":1919,"toc":2502},[1920,1923,1925,1929,1935,1937,1940,1944,1951,1955,1966,1970,1973,1975,1979,1984,1986,1997,2000,2003,2006,2020,2024,2027,2029,2033,2037,2039,2042,2045,2048,2051,2068,2071,2074,2076,2080,2085,2087,2094,2097,2100,2103,2114,2117,2120,2122,2126,2130,2132,2135,2138,2141,2144,2158,2161,2164,2166,2170,2175,2177,2180,2183,2190,2193,2250,2261,2264,2267,2269,2273,2278,2280,2286,2289,2292,2295,2306,2309,2312,2314,2318,2323,2325,2332,2335,2338,2341,2352,2355,2358,2360,2364,2369,2371,2374,2377,2380,2383,2394,2397,2400,2402,2406,2410,2412,2415,2418,2421,2424,2435,2438,2441,2443,2447,2460,2462,2467,2493],[11,1921,1922],{},"Ces dix points forment une liste professionnelle, pas un classement statistique. Aucune source nationale officielle n'étaye un taux de refus ou cet ordre. Le rapport concret reste déterminant.",[15,1924],{},[18,1926,1928],{"id":1927},"_1-différentiel-absent-ou-inadéquat","1. Différentiel absent ou inadéquat",[11,1930,1931,1934],{},[25,1932,1933],{},"Article RGIE :"," Art. 4.2.4.3 (RCD principal) \u002F Art. 4.2.4.3b (obligation différentiel 30 mA par groupe)",[30,1936,33],{"id":32},[11,1938,1939],{},"Un point de contrôle important est un différentiel absent, inadapté ou mal dimensionné. Pour les installations domestiques, le RGIE place notamment les circuits de prises, l'éclairage, les lieux avec baignoire ou douche, les lave-linge, sèche-linge et lave-vaisselle derrière un différentiel à haute ou très haute sensibilité. Cela n'établit aucun classement national de fréquence.",[30,1941,1943],{"id":1942},"pourquoi-cest-un-problème","Pourquoi c'est un problème",[11,1945,1946,1947,1950],{},"Le différentiel est la protection des personnes la plus importante dans une installation électrique. Il détecte les courants de fuite (par ex. quand du courant traverse le corps humain) et coupe en quelques millisecondes. Sans différentiel, il y a ",[25,1948,1949],{},"danger de mort"," en cas de défaut d'isolement.",[30,1952,1954],{"id":1953},"comment-corriger","Comment corriger",[53,1956,1957,1960,1963],{},[56,1958,1959],{},"Déduire le type de différentiel et la combinaison de protections du spectre de courant de défaut, du schéma de terre, des preuves fabricant et du chapitre spécial applicable. Pour une borne, évaluer ensemble le différentiel individuel du circuit AC et la protection contre les défauts DC lisses ; pour un onduleur, vérifier la variante exacte.",[56,1961,1962],{},"Maximum 8 circuits terminaux par RCD 30 mA (RGIE Art. 4.2.4.3b)",[56,1964,1965],{},"À l'origine, au moins un différentiel de maximum 300 mA est requis ; les différentiels domestiques sont au moins de type A. Une exécution temporisée ou sélective dépend de la coordination du projet, pas d'une règle universelle imposant le type A-S.",[30,1967,1969],{"id":1968},"étendue-propre-au-projet","Étendue propre au projet",[11,1971,1972],{},"Appareil, pôles, place, câblage et mesures déterminent l'offre.",[15,1974],{},[18,1976,1978],{"id":1977},"_2-plans-électriques-absents-ou-obsolètes","2. Plans électriques absents ou obsolètes",[11,1980,1981,1983],{},[25,1982,1933],{}," Art. 9.1.2 Nr. 1 (schéma unifilaire), Art. 9.1.2 Nr. 2 (plan de situation)",[30,1985,33],{"id":85},[11,1987,1988,1989,1992,1993,1996],{},"Le RGIE exige un ",[25,1990,1991],{},"schéma unifilaire"," et un ",[25,1994,1995],{},"plan de situation"," à jour pour toute installation électrique. Souvent, ces plans manquent complètement ou ne reflètent pas l'état actuel de l'installation — par exemple parce que des circuits ont été ajoutés ou modifiés après la construction.",[30,1998,1943],{"id":1999},"pourquoi-cest-un-problème-1",[11,2001,2002],{},"Sans plans actuels, ni le contrôleur ni un électricien ne peut évaluer l'installation en toute sécurité. En cas d'urgence (incendie, accident), il manque la documentation indiquant quel interrupteur alimente quelle zone.",[30,2004,1954],{"id":2005},"comment-corriger-1",[53,2007,2008,2011,2014],{},[56,2009,2010],{},"Établir ou mettre à jour le schéma unifilaire et le plan de situation",[56,2012,2013],{},"Documenter tous les circuits, disjoncteurs, RCD et consommateurs",[56,2015,2016,2017],{},"Les plans doivent montrer l'",[25,2018,2019],{},"état réel actuel",[30,2021,2023],{"id":2022},"coûts-typiques","Coûts typiques",[11,2025,2026],{},"Données vérifiées et identification des circuits déterminent le travail ; le logiciel ne remplace pas le relevé.",[15,2028],{},[18,2030,2032],{"id":2031},"_3-mise-à-la-terre-défectueuse","3. Mise à la terre défectueuse",[11,2034,2035,137],{},[25,2036,1933],{},[30,2038,33],{"id":140},[11,2040,2041],{},"La mise à la terre fait partie du concept de protection. Une résistance mesurée supérieure à 30 ohms n'équivaut pas automatiquement à une terre absente selon l'Art. 4.2.4.3b ; elle déclenche des exigences supplémentaires de protection différentielle. Il y a notamment défaut lorsque la terre est absente ou endommagée, ou lorsque l'arrangement de protection correspondant à la mesure n'est pas réalisé. Les connexions desserrées et conducteurs corrodés doivent aussi être évalués.",[30,2043,1943],{"id":2044},"pourquoi-cest-un-problème-2",[11,2046,2047],{},"Sans mise à la terre fonctionnelle, des boîtiers métalliques peuvent être sous tension sans que le différentiel ne se déclenche. Cela crée un piège mortel invisible.",[30,2049,1954],{"id":2050},"comment-corriger-2",[53,2052,2053,2056,2059,2062,2065],{},[56,2054,2055],{},"Faire mesurer la résistance de terre",[56,2057,2058],{},"Au-delà de 30 ohms, vérifier l'arrangement complémentaire du Livre 1 : au moins deux différentiels à haute ou très haute sensibilité, au plus seize prises simples ou multiples par différentiel concerné et la protection complémentaire des autres circuits visés",[56,2060,2061],{},"Décider professionnellement s'il faut améliorer la prise de terre, adapter les protections ou réaliser les deux",[56,2063,2064],{},"Vérifier toutes les connexions de terre et les resserrer si nécessaire",[56,2066,2067],{},"Contrôler la corrosion du conducteur de terre",[30,2069,2023],{"id":2070},"coûts-typiques-1",[11,2072,2073],{},"Mesure, installation, sol et travaux déterminent la solution.",[15,2075],{},[18,2077,2079],{"id":2078},"_4-interrupteur-principal-absent","4. Interrupteur principal absent",[11,2081,2082,2084],{},[25,2083,1933],{}," Art. 5.3.5.1b (interrupteur-sectionneur principal)",[30,2086,33],{"id":189},[11,2088,2089,2090,2093],{},"Toute installation électrique doit disposer d'un ",[25,2091,2092],{},"interrupteur principal omnipolaire"," permettant de mettre toute l'installation hors tension. L'interrupteur principal doit être d'au moins 40A (pour les habitations standard).",[30,2095,1943],{"id":2096},"pourquoi-cest-un-problème-3",[11,2098,2099],{},"En cas d'urgence, toute l'installation doit pouvoir être coupée d'un seul geste — par exemple en cas d'incendie, d'inondation ou d'accident. L'absence d'interrupteur principal peut coûter des secondes vitales.",[30,2101,1954],{"id":2102},"comment-corriger-3",[53,2104,2105,2108,2111],{},[56,2106,2107],{},"Installer un interrupteur principal omnipolaire ≥40A avant le premier RCD",[56,2109,2110],{},"L'interrupteur doit être facilement accessible (tableau de distribution)",[56,2112,2113],{},"Pour installation triphasée : utiliser un interrupteur principal 4 pôles",[30,2115,2023],{"id":2116},"coûts-typiques-2",[11,2118,2119],{},"Calibre, pôles, place et adaptation sont spécifiques au projet.",[15,2121],{},[18,2123,2125],{"id":2124},"_5-zones-salle-de-bains-non-respectées","5. Zones salle de bains non respectées",[11,2127,2128,233],{},[25,2129,1933],{},[30,2131,33],{"id":236},[11,2133,2134],{},"Le RGIE actuel définit les volumes 0, 1 et, pour certaines configurations avec baignoire, 2. Il ne faut pas transformer le volume 3 conservé dans certaines dispositions transitoires d'anciennes installations en volume général d'un nouveau projet. Les limites dépendent de la géométrie réelle de la baignoire ou de la douche.",[30,2136,1943],{"id":2137},"pourquoi-cest-un-problème-4",[11,2139,2140],{},"L'eau et l'électricité forment une combinaison mortelle. Les zones de salle de bains garantissent que les appareils électriques maintiennent une distance de sécurité suffisante par rapport aux sources d'eau.",[30,2142,1954],{"id":2143},"comment-corriger-4",[53,2145,2146,2149,2152,2155],{},[56,2147,2148],{},"Déplacer prises et interrupteurs hors des zones 0 et 1 (minimum 60 cm de la baignoire\u002Fdouche)",[56,2150,2151],{},"En zone 2 : uniquement des appareils IPX4 (protection contre les éclaboussures)",[56,2153,2154],{},"Protéger tous les circuits salle de bains par un RCD 30 mA",[56,2156,2157],{},"Pas de boîtes de dérivation en zone 0 ou 1",[30,2159,2023],{"id":2160},"coûts-typiques-3",[11,2162,2163],{},"Position, chemin, finitions et matériel déterminent les travaux.",[15,2165],{},[18,2167,2169],{"id":2168},"_6-section-de-câble-trop-faible-pour-le-disjoncteur","6. Section de câble trop faible pour le disjoncteur",[11,2171,2172,2174],{},[25,2173,1933],{}," Art. 4.4.1 (protection contre les surintensités) \u002F Art. 5.2.1.2 (choix des canalisations électriques)",[30,2176,33],{"id":282},[11,2178,2179],{},"Le disjoncteur (MCB) doit correspondre à la section du câble. Une combinaison fréquente : disjoncteur 20A sur un câble de 1.5 mm² (qui ne supporte que 16A). Le disjoncteur ne protège alors plus le câble contre la surcharge.",[30,2181,1943],{"id":2182},"pourquoi-cest-un-problème-5",[11,2184,2185,2186,2189],{},"Quand un câble transporte plus de courant qu'il ne peut supporter, il s'échauffe et peut provoquer des incendies. Le disjoncteur doit ",[25,2187,2188],{},"toujours être inférieur ou égal"," à la capacité du câble.",[30,2191,1954],{"id":2192},"comment-corriger-5",[300,2194,2195,2208],{},[303,2196,2197],{},[306,2198,2199,2202,2205],{},[309,2200,2201],{},"Section de câble",[309,2203,2204],{},"Fusible max. (gG)",[309,2206,2207],{},"Disjoncteur max.",[319,2209,2210,2218,2226,2234,2242],{},[306,2211,2212,2214,2216],{},[324,2213,326],{},[324,2215,329],{},[324,2217,332],{},[306,2219,2220,2222,2224],{},[324,2221,337],{},[324,2223,332],{},[324,2225,342],{},[306,2227,2228,2230,2232],{},[324,2229,347],{},[324,2231,342],{},[324,2233,352],{},[306,2235,2236,2238,2240],{},[324,2237,357],{},[324,2239,360],{},[324,2241,363],{},[306,2243,2244,2246,2248],{},[324,2245,368],{},[324,2247,371],{},[324,2249,374],{},[53,2251,2252,2258],{},[56,2253,2254,2255],{},"Réduire le disjoncteur à la valeur correcte ",[25,2256,2257],{},"ou",[56,2259,2260],{},"Remplacer le câble par une section plus grande",[30,2262,2023],{"id":2263},"coûts-typiques-4",[11,2265,2266],{},"Réduire la protection et remplacer le câble sont deux solutions différentes.",[15,2268],{},[18,2270,2272],{"id":2271},"_7-trop-de-circuits-par-différentiel","7. Trop de circuits par différentiel",[11,2274,2275,2277],{},[25,2276,1933],{}," Art. 4.2.4.3b (max. 8 circuits terminaux par RCD 30 mA) ; Art. 5.3.5.2b (max. 8 prises par circuit terminal)",[30,2279,33],{"id":405},[11,2281,2282,2283,2285],{},"Le RGIE limite le nombre de circuits par RCD 30 mA à ",[25,2284,411],{},". Dans les installations anciennes, tous les circuits sont souvent raccordés à un seul différentiel.",[30,2287,1943],{"id":2288},"pourquoi-cest-un-problème-6",[11,2290,2291],{},"Avec trop de circuits sur un même RCD, la probabilité de déclenchements intempestifs augmente (par addition des courants de fuite). De plus, en cas de défaut, toute l'habitation est privée de courant — pas seulement la zone concernée.",[30,2293,1954],{"id":2294},"comment-corriger-6",[53,2296,2297,2300,2303],{},[56,2298,2299],{},"Installer des RCD 30 mA supplémentaires",[56,2301,2302],{},"Répartir les circuits de manière logique (par ex. par étage ou fonction)",[56,2304,2305],{},"Maximum 8 circuits par RCD 30 mA",[30,2307,2023],{"id":2308},"coûts-typiques-5",[11,2310,2311],{},"Place, répartition, calibre et mesures appartiennent à l'offre.",[15,2313],{},[18,2315,2317],{"id":2316},"_8-étiquetage-manquant-des-circuits","8. Étiquetage manquant des circuits",[11,2319,2320,2322],{},[25,2321,1933],{}," Art. 3.1.3.1 (identification des circuits)",[30,2324,33],{"id":452},[11,2326,2327,2328,2331],{},"Tous les disjoncteurs et RCD dans le tableau de distribution doivent être ",[25,2329,2330],{},"clairement étiquetés",". L'étiquetage doit indiquer quelle pièce ou quel appareil est alimenté par le circuit concerné.",[30,2333,1943],{"id":2334},"pourquoi-cest-un-problème-7",[11,2336,2337],{},"Sans étiquetage, le bon circuit ne peut pas être rapidement coupé en cas d'urgence. Pour les travaux de maintenance également, une attribution claire est indispensable.",[30,2339,1954],{"id":2340},"comment-corriger-7",[53,2342,2343,2346,2349],{},[56,2344,2345],{},"Apposer des étiquettes lisibles sur tous les disjoncteurs",[56,2347,2348],{},"Dénomination par pièce et\u002Fou fonction (par ex. \"Cuisine prises\", \"Salle de bains éclairage\")",[56,2350,2351],{},"L'étiquetage doit correspondre au schéma unifilaire",[30,2353,2023],{"id":2354},"coûts-typiques-6",[11,2356,2357],{},"L'étiquette est simple ; identifier sûrement un circuit inconnu peut exiger un professionnel.",[15,2359],{},[18,2361,2363],{"id":2362},"_9-câbles-sans-protection","9. Câbles sans protection",[11,2365,2366,2368],{},[25,2367,1933],{}," Art. 5.2.2 (modes de pose) \u002F Art. 5.2.1.5 (résistance mécanique)",[30,2370,33],{"id":499},[11,2372,2373],{},"Les câbles électriques doivent être posés dans des tubes de protection (gaines), des goulottes ou des saignées murales. Des câbles apparents sans protection mécanique — par exemple en saillie ou en vrac dans la cave — constituent une infraction.",[30,2375,1943],{"id":2376},"pourquoi-cest-un-problème-8",[11,2378,2379],{},"Les câbles non protégés peuvent être endommagés mécaniquement (clou, vis, rongeurs). Un isolant de câble endommagé peut provoquer des courts-circuits et des incendies.",[30,2381,1954],{"id":2382},"comment-corriger-8",[53,2384,2385,2388,2391],{},[56,2386,2387],{},"Placer les câbles apparents dans des goulottes (tubes de protection)",[56,2389,2390],{},"Pour le montage en saillie : utiliser des goulottes adaptées",[56,2392,2393],{},"Étanchéifier les traversées de murs avec des manchons coupe-feu",[30,2395,2023],{"id":2396},"coûts-typiques-7",[11,2398,2399],{},"Canalisation, environnement, protection et bâtiment définissent la solution.",[15,2401],{},[18,2403,2405],{"id":2404},"_10-parafoudre-spd-absent-pour-nouvelle-installation","10. Parafoudre (SPD) absent pour nouvelle installation",[11,2407,2408,539],{},[25,2409,1933],{},[30,2411,33],{"id":542},[11,2413,2414],{},"L'Art. 4.5.1 prescrit de manière générale que les personnes et les biens doivent être protégés contre les effets nuisibles des surtensions — selon les règles de l'art. En pratique, un SPD (parafoudre) est exigé pour les nouvelles installations et les extensions substantielles. Pour les installations existantes, il est recommandé mais pas expressément imposé.",[30,2416,1943],{"id":2417},"pourquoi-cest-un-problème-9",[11,2419,2420],{},"Les surtensions dues à la foudre ou aux perturbations du réseau peuvent détruire l'électronique sensible. Un SPD dévie les surtensions en toute sécurité vers la terre et protège les appareils connectés.",[30,2422,1954],{"id":2423},"comment-corriger-9",[53,2425,2426,2429,2432],{},[56,2427,2428],{},"Installer un SPD Type 2 dans le tableau de distribution (après l'interrupteur principal, avant les RCD)",[56,2430,2431],{},"En cas d'installation paratonnerre : ajouter un SPD Type 1",[56,2433,2434],{},"Vérifier régulièrement l'indicateur d'état du SPD (vert = OK)",[30,2436,2023],{"id":2437},"coûts-typiques-8",[11,2439,2440],{},"Choix du SPD, coordination, raccordement et tableau sont spécifiques.",[15,2442],{},[18,2444,2446],{"id":2445},"conclusion-lauto-contrôle-comme-aide-à-la-planification","Conclusion : L'auto-contrôle comme aide à la planification",[11,2448,2449,2450,2454,2455,2459],{},"PlanElec signale certains problèmes pris en charge. Il ne détecte pas les défauts physiques et l'auto-contrôle reste partiel. Sources : ",[582,2451,2453],{"href":584,"rel":2452},[586],"RGIE Livre 1 V06"," et ",[582,2456,2458],{"href":590,"rel":2457},[586],"contrôle domestique officiel",", sans classement de fréquence.",[15,2461],{},[11,2463,2464],{},[25,2465,2466],{},"Articles connexes :",[53,2468,2469,2475,2481,2487],{},[56,2470,2471],{},[582,2472,2474],{"href":2473},"\u002Ffr\u002Fblog\u002Fcontrole-electrique-refuse","Contrôle électrique refusé — que faire ?",[56,2476,2477],{},[582,2478,2480],{"href":2479},"\u002Ffr\u002Fblog\u002Fdifferentiel-30ma","Différentiel 30 mA : quand est-il obligatoire ?",[56,2482,2483],{},[582,2484,2486],{"href":2485},"\u002Ffr\u002Fblog\u002Fsection-cable-disjoncteur","Section de câble et disjoncteur : la bonne combinaison",[56,2488,2489],{},[582,2490,2492],{"href":2491},"\u002Ffr\u002Fblog\u002Fcables-salle-de-bains-zones-rgie","Câbles salle de bains et zones RGIE",[11,2494,2495,632,2498],{},[25,2496,2497],{},"Structurez votre planification avec PlanElec et utilisez l'auto-contrôle pour préparer la vérification professionnelle et le contrôle officiel.",[582,2499,2501],{"href":635,"rel":2500},[586],"Commencer maintenant →",{"title":639,"searchDepth":640,"depth":640,"links":2503},[2504,2510,2516,2522,2528,2534,2540,2546,2552,2558,2564],{"id":1927,"depth":640,"text":1928,"children":2505},[2506,2507,2508,2509],{"id":32,"depth":645,"text":33},{"id":1942,"depth":645,"text":1943},{"id":1953,"depth":645,"text":1954},{"id":1968,"depth":645,"text":1969},{"id":1977,"depth":640,"text":1978,"children":2511},[2512,2513,2514,2515],{"id":85,"depth":645,"text":33},{"id":1999,"depth":645,"text":1943},{"id":2005,"depth":645,"text":1954},{"id":2022,"depth":645,"text":2023},{"id":2031,"depth":640,"text":2032,"children":2517},[2518,2519,2520,2521],{"id":140,"depth":645,"text":33},{"id":2044,"depth":645,"text":1943},{"id":2050,"depth":645,"text":1954},{"id":2070,"depth":645,"text":2023},{"id":2078,"depth":640,"text":2079,"children":2523},[2524,2525,2526,2527],{"id":189,"depth":645,"text":33},{"id":2096,"depth":645,"text":1943},{"id":2102,"depth":645,"text":1954},{"id":2116,"depth":645,"text":2023},{"id":2124,"depth":640,"text":2125,"children":2529},[2530,2531,2532,2533],{"id":236,"depth":645,"text":33},{"id":2137,"depth":645,"text":1943},{"id":2143,"depth":645,"text":1954},{"id":2160,"depth":645,"text":2023},{"id":2168,"depth":640,"text":2169,"children":2535},[2536,2537,2538,2539],{"id":282,"depth":645,"text":33},{"id":2182,"depth":645,"text":1943},{"id":2192,"depth":645,"text":1954},{"id":2263,"depth":645,"text":2023},{"id":2271,"depth":640,"text":2272,"children":2541},[2542,2543,2544,2545],{"id":405,"depth":645,"text":33},{"id":2288,"depth":645,"text":1943},{"id":2294,"depth":645,"text":1954},{"id":2308,"depth":645,"text":2023},{"id":2316,"depth":640,"text":2317,"children":2547},[2548,2549,2550,2551],{"id":452,"depth":645,"text":33},{"id":2334,"depth":645,"text":1943},{"id":2340,"depth":645,"text":1954},{"id":2354,"depth":645,"text":2023},{"id":2362,"depth":640,"text":2363,"children":2553},[2554,2555,2556,2557],{"id":499,"depth":645,"text":33},{"id":2376,"depth":645,"text":1943},{"id":2382,"depth":645,"text":1954},{"id":2396,"depth":645,"text":2023},{"id":2404,"depth":640,"text":2405,"children":2559},[2560,2561,2562,2563],{"id":542,"depth":645,"text":33},{"id":2417,"depth":645,"text":1943},{"id":2423,"depth":645,"text":1954},{"id":2437,"depth":645,"text":2023},{"id":2445,"depth":640,"text":2446},"Dix contrôles récurrents pour les installations domestiques belges, sans classement, taux de refus ni promesse de coût non étayés.","fr",{},"\u002Fblog\u002Ftop-10-arei-violations.fr",{"title":1917,"description":2565},"10-infractions-rgie-frequentes","blog\u002Ftop-10-arei-violations.fr",[2573,2574,2575,2576,2577,2578,2579,2580],"rgie","infractions","controle-electrique","controle","differentiel","mise-a-la-terre","belgique","defauts","EyYmtaObKX3yKclo6JgAwWPQWj-Ivamc7KDwkbEW6JM",{"id":2583,"title":2584,"articleId":6,"body":2585,"category":704,"date":705,"description":3254,"extension":707,"lastUpdated":708,"locale":3255,"meta":3256,"navigation":711,"path":3257,"publishDate":705,"readTime":713,"refreshInterval":714,"seo":3258,"slug":3259,"stem":3260,"tags":3261,"__hash__":3268},"blog\u002Fblog\u002Ftop-10-arei-violations.nl.md","10 belangrijke AREI-controlepunten: Herkennen, vermijden en oplossen",{"type":8,"value":2586,"toc":3191},[2587,2590,2592,2596,2602,2606,2609,2613,2620,2624,2635,2639,2642,2644,2648,2653,2656,2667,2670,2673,2676,2691,2695,2698,2700,2704,2708,2711,2714,2717,2720,2723,2740,2743,2746,2748,2752,2757,2760,2767,2770,2773,2776,2787,2790,2793,2795,2799,2803,2806,2809,2812,2815,2818,2832,2835,2838,2840,2844,2849,2852,2855,2858,2865,2868,2925,2936,2939,2942,2944,2948,2953,2956,2963,2966,2969,2972,2983,2986,2989,2991,2995,3000,3003,3010,3013,3016,3019,3030,3033,3036,3038,3042,3047,3050,3053,3056,3059,3062,3073,3076,3079,3081,3085,3089,3092,3095,3098,3101,3104,3115,3118,3121,3123,3127,3140,3143,3146,3149,3151,3156,3182],[11,2588,2589],{},"Deze tien punten vormen een vakinhoudelijke checklist, geen statistische rangorde. Geen officiële nationale bron onderbouwt een afkeuringspercentage of deze volgorde. Het concrete verslag blijft bepalend.",[15,2591],{},[18,2593,2595],{"id":2594},"_1-ontbrekend-of-verkeerd-differentieel","1. Ontbrekend of verkeerd differentieel",[11,2597,2598,2601],{},[25,2599,2600],{},"AREI-artikel:"," Art. 4.2.4.3 (hoofd-RCD) \u002F Art. 4.2.4.3 lid b (30mA-groep-differentieel-plicht)",[30,2603,2605],{"id":2604},"beschrijving","Beschrijving",[11,2607,2608],{},"Een belangrijk controlegebied is een ontbrekende, ongeschikte of verkeerd bemeten differentiaalschakelaar. Voor huishoudelijke installaties plaatst het AREI onder meer stopcontactkringen, verlichting, ruimten met bad of douche, wasmachines, droogkasten en vaatwassers achter een differentieel met hoge of zeer hoge gevoeligheid. Dat vormt geen nationale frequentierangschikking.",[30,2610,2612],{"id":2611},"waarom-het-een-probleem-is","Waarom het een probleem is",[11,2614,2615,2616,2619],{},"De differentiaalschakelaar is de belangrijkste persoonsbescherming in een elektroinstallatie. Hij detecteert foutstromen (bijv. wanneer stroom via het menselijk lichaam vloeit) en schakelt binnen milliseconden uit. Zonder differentieel bestaat er ",[25,2617,2618],{},"levensgevaar"," bij isolatiefouten.",[30,2621,2623],{"id":2622},"hoe-het-op-te-lossen","Hoe het op te lossen",[53,2625,2626,2629,2632],{},[56,2627,2628],{},"Leid differentieeltype en beveiligingscombinatie af uit het verwachte foutstroomspectrum, aardingssysteem, fabrikantbewijs en toepasselijke bijzondere hoofdstuk. Beoordeel bij laadpunten de individuele AC-kringdifferentieel samen met bescherming tegen gladde DC-foutstromen; gebruik bij omvormers bewijs voor de exacte variant.",[56,2630,2631],{},"Maximaal 8 eindstroomkringen per 30 mA-RCD (AREI Art. 4.2.4.3b)",[56,2633,2634],{},"Aan het begin is minstens één differentieel van maximaal 300 mA vereist; huishoudelijke differentiëlen zijn minstens type A. Een vertraagde of selectieve uitvoering volgt uit de projectcoördinatie en is geen algemene verplichting voor type A-S.",[30,2636,2638],{"id":2637},"projectspecifieke-omvang","Projectspecifieke omvang",[11,2640,2641],{},"Toestel, polen, plaats, bedrading en metingen bepalen de offerte.",[15,2643],{},[18,2645,2647],{"id":2646},"_2-ontbrekende-of-verouderde-elektroplannen","2. Ontbrekende of verouderde elektroplannen",[11,2649,2650,2652],{},[25,2651,2600],{}," Art. 9.1.2 Nr. 1 (eendraadschema), Art. 9.1.2 Nr. 2 (situatieplan\u002Fliggingsplan)",[30,2654,2605],{"id":2655},"beschrijving-1",[11,2657,2658,2659,2662,2663,2666],{},"Het AREI vereist een actueel ",[25,2660,2661],{},"eendraadschema"," en ",[25,2664,2665],{},"situatieplan"," voor elke elektroinstallatie. Vaak ontbreken deze plannen volledig of weerspiegelen ze niet de huidige toestand van de installatie — bijv. omdat er na de bouw stroomkringen zijn toegevoegd of gewijzigd.",[30,2668,2612],{"id":2669},"waarom-het-een-probleem-is-1",[11,2671,2672],{},"Zonder actuele plannen kan noch de keurder noch een elektricien de installatie veilig beoordelen. Bij noodgevallen (brand, ongeval) ontbreekt de documentatie over welke schakelaar welk gebied voorziet.",[30,2674,2623],{"id":2675},"hoe-het-op-te-lossen-1",[53,2677,2678,2681,2684],{},[56,2679,2680],{},"Eendraadschema en situatieplan opstellen of bijwerken",[56,2682,2683],{},"Alle stroomkringen, zekeringen, RCD's en verbruikers documenteren",[56,2685,2686,2687,2690],{},"Plannen moeten de ",[25,2688,2689],{},"werkelijke huidige toestand"," tonen",[30,2692,2694],{"id":2693},"typische-kosten","Typische kosten",[11,2696,2697],{},"Geverifieerde invoer en circuitidentificatie bepalen het werk; software vervangt geen opname.",[15,2699],{},[18,2701,2703],{"id":2702},"_3-gebrekkige-aarding","3. Gebrekkige aarding",[11,2705,2706,137],{},[25,2707,2600],{},[30,2709,2605],{"id":2710},"beschrijving-2",[11,2712,2713],{},"De aarding maakt deel uit van het beveiligingsconcept. Een gemeten weerstand boven 30 ohm staat volgens Art. 4.2.4.3b niet automatisch gelijk aan ontbrekende aarding; de waarde activeert bijkomende eisen voor differentieelbeveiliging. Een tekortkoming bestaat bijvoorbeeld wanneer aarding ontbreekt of beschadigd is, of wanneer de bij de meetwaarde vereiste beveiligingsopbouw niet aanwezig is. Losse verbindingen en gecorrodeerde beschermingsgeleiders vragen eveneens vakbeoordeling.",[30,2715,2612],{"id":2716},"waarom-het-een-probleem-is-2",[11,2718,2719],{},"Zonder werkende aarding kunnen metalen behuizingen onder spanning staan zonder dat het differentieel uitschakelt. Dit creëert een onzichtbare dodelijke val.",[30,2721,2623],{"id":2722},"hoe-het-op-te-lossen-2",[53,2724,2725,2728,2731,2734,2737],{},[56,2726,2727],{},"Aardingsweerstand laten meten",[56,2729,2730],{},"Boven 30 ohm de aanvullende opbouw uit Boek 1 controleren: minstens twee differentiëlen met hoge of zeer hoge gevoeligheid, maximaal zestien enkelvoudige of meervoudige stopcontacten per betrokken differentieel en aanvullende bescherming voor de overige bedoelde kringen",[56,2732,2733],{},"Professioneel bepalen of de aardelektrode wordt verbeterd, de beveiligingsopbouw wordt aangepast of beide nodig zijn",[56,2735,2736],{},"Alle aardingsverbindingen controleren en eventueel aandraaien",[56,2738,2739],{},"Aardingsgeleider op corrosie controleren",[30,2741,2694],{"id":2742},"typische-kosten-1",[11,2744,2745],{},"Meting, bestaande installatie, bodem en vakwerk bepalen de oplossing.",[15,2747],{},[18,2749,2751],{"id":2750},"_4-ontbrekende-hoofdschakelaar","4. Ontbrekende hoofdschakelaar",[11,2753,2754,2756],{},[25,2755,2600],{}," Art. 5.3.5.1b (hoofd-lastscheidingsschakelaar)",[30,2758,2605],{"id":2759},"beschrijving-3",[11,2761,2762,2763,2766],{},"Elke elektroinstallatie moet over een ",[25,2764,2765],{},"allpolige hoofdschakelaar"," beschikken waarmee de volledige installatie spanningsloos geschakeld kan worden. De hoofdschakelaar moet minstens 40A zijn (bij standaardwoningen).",[30,2768,2612],{"id":2769},"waarom-het-een-probleem-is-3",[11,2771,2772],{},"Bij noodgevallen moet de volledige installatie met één handeling uitgeschakeld kunnen worden — bijv. bij brand, overstroming of ongeval. Ontbreekt de hoofdschakelaar, dan kan dat levensreddende seconden kosten.",[30,2774,2623],{"id":2775},"hoe-het-op-te-lossen-3",[53,2777,2778,2781,2784],{},[56,2779,2780],{},"Allpolige hoofdschakelaar ≥40A vóór de eerste RCD installeren",[56,2782,2783],{},"De schakelaar moet makkelijk toegankelijk zijn (verdeelkast)",[56,2785,2786],{},"Bij driefasige installatie: 4-polige hoofdschakelaar gebruiken",[30,2788,2694],{"id":2789},"typische-kosten-2",[11,2791,2792],{},"Bemeting, polen, bordruimte en aanpassing zijn projectspecifiek.",[15,2794],{},[18,2796,2798],{"id":2797},"_5-badkamerzones-niet-gerespecteerd","5. Badkamerzones niet gerespecteerd",[11,2800,2801,233],{},[25,2802,2600],{},[30,2804,2605],{"id":2805},"beschrijving-4",[11,2807,2808],{},"Het AREI definieert beschermingszones in de badkamer (Zone 0, 1, 2 en 3), waarin telkens alleen bepaalde elektrische toestellen toegelaten zijn. Veelvoorkomende overtredingen: stopcontacten in zone 0 of 1, ontbrekende spatwaterbescherming, schakelaars te dicht bij bad of douche.",[30,2810,2612],{"id":2811},"waarom-het-een-probleem-is-4",[11,2813,2814],{},"Water en stroom zijn een dodelijke combinatie. De badkamerzones verzekeren dat elektrische toestellen een voldoende veiligheidsafstand tot waterbronnen hebben.",[30,2816,2623],{"id":2817},"hoe-het-op-te-lossen-4",[53,2819,2820,2823,2826,2829],{},[56,2821,2822],{},"Stopcontacten en schakelaars buiten zone 0 en 1 plaatsen (minstens 60 cm van bad\u002Fdouche)",[56,2824,2825],{},"In zone 2: alleen IPX4-beschermde toestellen (spatwaterbescherming)",[56,2827,2828],{},"Alle badkamerstroomkringen via 30 mA-RCD beveiligen",[56,2830,2831],{},"Geen verdeeldozen in zone 0 of 1",[30,2833,2694],{"id":2834},"typische-kosten-3",[11,2836,2837],{},"Positie, traject, afwerking en materiaal bepalen de werken.",[15,2839],{},[18,2841,2843],{"id":2842},"_6-kabeldoorsnede-te-klein-voor-de-zekering","6. Kabeldoorsnede te klein voor de zekering",[11,2845,2846,2848],{},[25,2847,2600],{}," Art. 4.4.1 (overstroombeveiliging) \u002F Art. 5.2.1.2 (keuze van elektrische leidingen)",[30,2850,2605],{"id":2851},"beschrijving-5",[11,2853,2854],{},"De zekering (MCB) moet bij de kabeldoorsnede passen. Een veelvoorkomende combinatie: 20A-zekering op een 1.5 mm²-kabel (die slechts voor 16A geschikt is). De zekering beschermt de kabel dan niet tegen overbelasting.",[30,2856,2612],{"id":2857},"waarom-het-een-probleem-is-5",[11,2859,2860,2861,2864],{},"Wanneer een kabel meer stroom voert dan hij aankan, verwarmt hij en kan hij branden veroorzaken. De zekering moet ",[25,2862,2863],{},"altijd kleiner of gelijk"," zijn aan de belastbaarheid van de kabel.",[30,2866,2623],{"id":2867},"hoe-het-op-te-lossen-5",[300,2869,2870,2883],{},[303,2871,2872],{},[306,2873,2874,2877,2880],{},[309,2875,2876],{},"Kabeldoorsnede",[309,2878,2879],{},"Max. zekering (gG)",[309,2881,2882],{},"Max. automaat",[319,2884,2885,2893,2901,2909,2917],{},[306,2886,2887,2889,2891],{},[324,2888,326],{},[324,2890,329],{},[324,2892,332],{},[306,2894,2895,2897,2899],{},[324,2896,337],{},[324,2898,332],{},[324,2900,342],{},[306,2902,2903,2905,2907],{},[324,2904,347],{},[324,2906,342],{},[324,2908,352],{},[306,2910,2911,2913,2915],{},[324,2912,357],{},[324,2914,360],{},[324,2916,363],{},[306,2918,2919,2921,2923],{},[324,2920,368],{},[324,2922,371],{},[324,2924,374],{},[53,2926,2927,2933],{},[56,2928,2929,2930],{},"Zekering naar de correcte waarde verlagen ",[25,2931,2932],{},"of",[56,2934,2935],{},"Kabel door grotere doorsnede vervangen",[30,2937,2694],{"id":2938},"typische-kosten-4",[11,2940,2941],{},"Beveiliging verlagen en kabel vervangen zijn verschillende oplossingen.",[15,2943],{},[18,2945,2947],{"id":2946},"_7-te-veel-stroomkringen-per-differentieel","7. Te veel stroomkringen per differentieel",[11,2949,2950,2952],{},[25,2951,2600],{}," Art. 4.2.4.3b (max. 8 eindstroomkringen per 30 mA-RCD); Art. 5.3.5.2b (max. 8 stopcontacten per eindstroomkring)",[30,2954,2605],{"id":2955},"beschrijving-6",[11,2957,2958,2959,2962],{},"Het AREI beperkt het aantal stroomkringen per 30 mA-RCD tot ",[25,2960,2961],{},"maximaal 8",". Bij oudere installaties hangen vaak alle stroomkringen aan één enkel differentieel.",[30,2964,2612],{"id":2965},"waarom-het-een-probleem-is-6",[11,2967,2968],{},"Als er te veel stroomkringen aan één RCD hangen, stijgt de kans op valse uitschakelingen (door optelling van lekstromen). Bovendien is bij een fout de volledige woning stromloos — niet alleen het getroffen gebied.",[30,2970,2623],{"id":2971},"hoe-het-op-te-lossen-6",[53,2973,2974,2977,2980],{},[56,2975,2976],{},"Extra 30 mA-RCD's installeren",[56,2978,2979],{},"Stroomkringen zinvol verdelen (bijv. per verdieping of functie)",[56,2981,2982],{},"Maximaal 8 stroomkringen per 30 mA-RCD",[30,2984,2694],{"id":2985},"typische-kosten-5",[11,2987,2988],{},"Bordruimte, verdeling, bemeting en metingen horen in de offerte.",[15,2990],{},[18,2992,2994],{"id":2993},"_8-ontbrekende-etikettering-van-stroomkringen","8. Ontbrekende etikettering van stroomkringen",[11,2996,2997,2999],{},[25,2998,2600],{}," Art. 3.1.3.1 (identificatie van stroomkringen)",[30,3001,2605],{"id":3002},"beschrijving-7",[11,3004,3005,3006,3009],{},"Alle zekeringen en RCD's in de verdeelkast moeten ",[25,3007,3008],{},"eenduidig geëtiketteerd"," zijn. De etikettering moet aangeven welke ruimte of welk toestel door de betreffende stroomkring gevoed wordt.",[30,3011,2612],{"id":3012},"waarom-het-een-probleem-is-7",[11,3014,3015],{},"Zonder etikettering kan bij noodgevallen niet snel de juiste stroomkring uitgeschakeld worden. Ook voor onderhoudswerkzaamheden is een duidelijke toewijzing onmisbaar.",[30,3017,2623],{"id":3018},"hoe-het-op-te-lossen-7",[53,3020,3021,3024,3027],{},[56,3022,3023],{},"Alle zekeringen van leesbare etiketten voorzien",[56,3025,3026],{},"Benaming per ruimte en\u002Fof functie (bijv. \"Keuken stopcontacten\", \"Badkamer verlichting\")",[56,3028,3029],{},"Etikettering moet overeenkomen met het eendraadschema",[30,3031,2694],{"id":3032},"typische-kosten-6",[11,3034,3035],{},"Een label is eenvoudig; onbekende circuits veilig identificeren kan vakwerk vereisen.",[15,3037],{},[18,3039,3041],{"id":3040},"_9-kabels-zonder-bescherming","9. Kabels zonder bescherming",[11,3043,3044,3046],{},[25,3045,2600],{}," Art. 5.2.2 (legwijzen) \u002F Art. 5.2.1.5 (mechanische sterkte)",[30,3048,2605],{"id":3049},"beschrijving-8",[11,3051,3052],{},"Elektrische kabels moeten in beschermbuizen (lege buizen), kabelgoten of wandsleuven gelegd worden. Blootliggende kabels zonder mechanische bescherming — zoals opbouw of los in de kelder — zijn een overtreding.",[30,3054,2612],{"id":3055},"waarom-het-een-probleem-is-8",[11,3057,3058],{},"Onbeschermde kabels kunnen mechanisch beschadigd worden (spijker, schroef, knaagdieren). Een beschadigde kabelisolatie kan tot kortsluiting en brand leiden.",[30,3060,2623],{"id":3061},"hoe-het-op-te-lossen-8",[53,3063,3064,3067,3070],{},[56,3065,3066],{},"Blootliggende kabels in kabelgoten (beschermbuizen) leggen",[56,3068,3069],{},"Bij opbouwmontage: geschikte kabelgoten gebruiken",[56,3071,3072],{},"Doorvoeren door muren met brandwerende manchetten afdichten",[30,3074,2694],{"id":3075},"typische-kosten-7",[11,3077,3078],{},"Leiding, omgeving, mechanische bescherming en bouw bepalen de oplossing.",[15,3080],{},[18,3082,3084],{"id":3083},"_10-ontbrekende-overspanningsbeveiliging-spd-bij-nieuwe-installatie","10. Ontbrekende overspanningsbeveiliging (SPD) bij nieuwe installatie",[11,3086,3087,539],{},[25,3088,2600],{},[30,3090,2605],{"id":3091},"beschrijving-9",[11,3093,3094],{},"Art. 4.5.1 schrijft algemeen voor dat personen en goederen beschermd moeten worden tegen de schadelijke gevolgen van overspanningen — volgens de regels van het vak. In de praktijk wordt bij nieuwe installaties en wezenlijke uitbreidingen een SPD (overspanningsbeveiliging) geëist. Bij bestaande installaties is het aanbevolen maar niet uitdrukkelijk voorgeschreven.",[30,3096,2612],{"id":3097},"waarom-het-een-probleem-is-9",[11,3099,3100],{},"Overspanningen door blikseminslag of netstoringen kunnen gevoelige elektronica vernietigen. Een SPD leidt overspanningen veilig naar de aarde af en beschermt de aangesloten toestellen.",[30,3102,2623],{"id":3103},"hoe-het-op-te-lossen-9",[53,3105,3106,3109,3112],{},[56,3107,3108],{},"SPD Type 2 in de verdeelkast installeren (na de hoofdschakelaar, vóór de RCD's)",[56,3110,3111],{},"Bij bliksembeveiliging bijkomend SPD Type 1",[56,3113,3114],{},"Regelmatig de statusindicator van de SPD controleren (groen = OK)",[30,3116,2694],{"id":3117},"typische-kosten-8",[11,3119,3120],{},"SPD-keuze, coördinatie, aansluiting en bordaanpassing zijn projectspecifiek.",[15,3122],{},[18,3124,3126],{"id":3125},"conclusie-zelfcontrole-als-planningshulp","Conclusie: Zelfcontrole als planningshulp",[11,3128,3129,3130,2662,3134,3139],{},"PlanElec signaleert bepaalde ondersteunde problemen. Fysieke gebreken ziet het niet en de zelfcontrole blijft gedeeltelijk. Bronnen: ",[582,3131,3133],{"href":584,"rel":3132},[586],"AREI Boek 1 V06",[582,3135,3138],{"href":3136,"rel":3137},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fthemas\u002Fenergie\u002Fbronnen-en-dragers-van-energie\u002Felektriciteit\u002Fveiligheid-en-controle-van\u002Fcontrole-van-huishoudelijke",[586],"officiële FOD-controleuitleg",", zonder frequentieranglijst.",[11,3141,3142],{},"Gebruik de punten in twee rondes: eerst documentatie en referenties, daarna de echte toestand, metingen en bescherming door bevoegde personen. Een aangepaste tekening bewijst niet dat een fysiek gebrek opgelost is. Omgekeerd moet uitgevoerde correctie opnieuw in schema en situatieplan verschijnen. Markeer open punten met bron en verantwoordelijke. Zo blijft dit voorbereiding, geen belofte over de keuring.",[11,3144,3145],{},"Bewaar de gedateerde versie samen met controleverslag, meetbewijzen en fabrikantdocumenten. Zo blijft later zichtbaar welke conclusie uit een tekening komt en welke werkelijk ter plaatse is gecontroleerd.",[11,3147,3148],{},"Noteer bij elke maatregel ook de gebruikte Boek 1-versie en het bewijs waarop de gekozen oplossing steunt.",[15,3150],{},[11,3152,3153],{},[25,3154,3155],{},"Gerelateerde artikelen:",[53,3157,3158,3164,3170,3176],{},[56,3159,3160],{},[582,3161,3163],{"href":3162},"\u002Fblog\u002Felektrokeuring-afgekeurd","Elektrokeuring afgekeurd — wat nu?",[56,3165,3166],{},[582,3167,3169],{"href":3168},"\u002Fblog\u002F30ma-differentieel","30 mA differentieel: Wanneer is het verplicht?",[56,3171,3172],{},[582,3173,3175],{"href":3174},"\u002Fblog\u002Fkabeldoorsnede-zekering","Kabeldoorsnede en zekering: De juiste combinatie",[56,3177,3178],{},[582,3179,3181],{"href":3180},"\u002Fblog\u002Fbadkamerkabels-arei-zones","Badkamerkabels en AREI-zones",[11,3183,3184,632,3187],{},[25,3185,3186],{},"Structureer uw planning met PlanElec en gebruik de zelfcontrole als voorbereiding op de professionele en officiële keuring.",[582,3188,3190],{"href":635,"rel":3189},[586],"Nu starten →",{"title":639,"searchDepth":640,"depth":640,"links":3192},[3193,3199,3205,3211,3217,3223,3229,3235,3241,3247,3253],{"id":2594,"depth":640,"text":2595,"children":3194},[3195,3196,3197,3198],{"id":2604,"depth":645,"text":2605},{"id":2611,"depth":645,"text":2612},{"id":2622,"depth":645,"text":2623},{"id":2637,"depth":645,"text":2638},{"id":2646,"depth":640,"text":2647,"children":3200},[3201,3202,3203,3204],{"id":2655,"depth":645,"text":2605},{"id":2669,"depth":645,"text":2612},{"id":2675,"depth":645,"text":2623},{"id":2693,"depth":645,"text":2694},{"id":2702,"depth":640,"text":2703,"children":3206},[3207,3208,3209,3210],{"id":2710,"depth":645,"text":2605},{"id":2716,"depth":645,"text":2612},{"id":2722,"depth":645,"text":2623},{"id":2742,"depth":645,"text":2694},{"id":2750,"depth":640,"text":2751,"children":3212},[3213,3214,3215,3216],{"id":2759,"depth":645,"text":2605},{"id":2769,"depth":645,"text":2612},{"id":2775,"depth":645,"text":2623},{"id":2789,"depth":645,"text":2694},{"id":2797,"depth":640,"text":2798,"children":3218},[3219,3220,3221,3222],{"id":2805,"depth":645,"text":2605},{"id":2811,"depth":645,"text":2612},{"id":2817,"depth":645,"text":2623},{"id":2834,"depth":645,"text":2694},{"id":2842,"depth":640,"text":2843,"children":3224},[3225,3226,3227,3228],{"id":2851,"depth":645,"text":2605},{"id":2857,"depth":645,"text":2612},{"id":2867,"depth":645,"text":2623},{"id":2938,"depth":645,"text":2694},{"id":2946,"depth":640,"text":2947,"children":3230},[3231,3232,3233,3234],{"id":2955,"depth":645,"text":2605},{"id":2965,"depth":645,"text":2612},{"id":2971,"depth":645,"text":2623},{"id":2985,"depth":645,"text":2694},{"id":2993,"depth":640,"text":2994,"children":3236},[3237,3238,3239,3240],{"id":3002,"depth":645,"text":2605},{"id":3012,"depth":645,"text":2612},{"id":3018,"depth":645,"text":2623},{"id":3032,"depth":645,"text":2694},{"id":3040,"depth":640,"text":3041,"children":3242},[3243,3244,3245,3246],{"id":3049,"depth":645,"text":2605},{"id":3055,"depth":645,"text":2612},{"id":3061,"depth":645,"text":2623},{"id":3075,"depth":645,"text":2694},{"id":3083,"depth":640,"text":3084,"children":3248},[3249,3250,3251,3252],{"id":3091,"depth":645,"text":2605},{"id":3097,"depth":645,"text":2612},{"id":3103,"depth":645,"text":2623},{"id":3117,"depth":645,"text":2694},{"id":3125,"depth":640,"text":3126},"Tien terugkerende controlepunten voor Belgische huishoudelijke installaties, zonder onbewezen ranglijst, afkeuringspercentage of kostenbelofte.","nl",{},"\u002Fblog\u002Ftop-10-arei-violations.nl",{"title":2584,"description":3254},"10-meest-voorkomende-arei-overtredingen","blog\u002Ftop-10-arei-violations.nl",[718,3262,3263,1419,3264,3265,3266,3267],"overtredingen","elektrokeuring","differentieel","aarding","belgie","tekortkomingen","fQCTwCaJdrEWzXK9lg4TW0XsTHwsmLQSZq8AA-j5iAs",1788389262979]