[{"data":1,"prerenderedAt":1871},["ShallowReactive",2],{"blog-post-en-electrical-inspection":3,"blog-alternates-electrical-inspection":431},{"id":4,"title":5,"articleId":6,"body":7,"category":399,"date":400,"description":401,"extension":402,"lastUpdated":403,"locale":404,"meta":405,"navigation":406,"path":407,"publishDate":408,"readTime":409,"refreshInterval":410,"seo":411,"slug":6,"stem":412,"tags":413,"__hash__":430},"blog\u002Fblog\u002Felectrical-inspection.en.md","Electrical Inspection in Belgium: The Complete Guide 2026","electrical-inspection",{"type":8,"value":9,"toc":378},"minimark",[10,15,19,22,26,29,70,79,83,86,91,94,114,118,121,144,148,151,171,175,178,205,208,212,223,226,230,239,242,259,262,266,269,272,275,279,282,285,289,293,296,299,302,305,308,317,321,324,328,335,367,372],[11,12,14],"h2",{"id":13},"what-is-an-electrical-inspection","What is an Electrical Inspection?",[16,17,18],"p",{},"In Belgium, electrical installations are inspected by an approved body at the events defined by the AREI\u002FRGIE. These include first use of a new installation, major modifications or extensions, periodic checks and certain property-sale situations.",[16,20,21],{},"The required procedure depends on the case. A sale inspection of an older installation is not the same as the conformity inspection of a new build. Fixed claims about delay and extra cost are not reliable without a project and provider.",[11,23,25],{"id":24},"when-do-you-need-an-inspection","When Do You Need an Inspection?",[16,27,28],{},"An electrical inspection is required in the following situations:",[30,31,32,40,46,52,58,64],"ul",{},[33,34,35,39],"li",{},[36,37,38],"strong",{},"New installations",": Before the initial connection to the grid",[33,41,42,45],{},[36,43,44],{},"Major modifications or extensions",": for example, adding a circuit at the board; minor changes are treated differently",[33,47,48,51],{},[36,49,50],{},"Periodic inspection",": Every 25 years for residential buildings",[33,53,54,57],{},[36,55,56],{},"Property sales",": Inspection visit when selling a dwelling unit",[33,59,60,63],{},[36,61,62],{},"After a violation report",": Re-inspection after fixing identified issues",[33,65,66,69],{},[36,67,68],{},"Capacity increase",": in the AREI cases that apply to an older domestic installation",[71,72,73],"blockquote",{},[16,74,75,78],{},[36,76,77],{},"Good to know",": Even if you're only adding a few new circuits, you may trigger a full re-inspection. Always check with your electrician or inspection body beforehand.",[11,80,82],{"id":81},"how-to-prepare-for-the-inspection","How to Prepare for the Inspection",[16,84,85],{},"Good preparation makes the installation inspectable, but cannot guarantee a positive result. Have the following ready:",[87,88,90],"h3",{"id":89},"_1-required-documentation","1. Required Documentation",[16,92,93],{},"The inspector will ask for the following documents:",[30,95,96,102,108],{},[33,97,98,101],{},[36,99,100],{},"Single-line diagram"," (Eindrahtschema \u002F Schéma unifilaire) — A schematic overview of all circuits, protection devices, and connections",[33,103,104,107],{},[36,105,106],{},"Floor plan"," (Situationsplan \u002F Plan de situation) — Shows the physical location of all electrical components",[33,109,110,113],{},[36,111,112],{},"Technical documentation"," needed for special equipment such as PV, an EV charger or a battery",[87,115,117],{"id":116},"_2-installation-requirements","2. Installation Requirements",[16,119,120],{},"Make sure your installation meets these basic requirements:",[30,122,123,126,129,132,135,138,141],{},[33,124,125],{},"All circuits are properly protected by circuit breakers",[33,127,128],{},"A 300mA differential switch protects the entire installation",[33,130,131],{},"Additional 30mA RCD protection (high or very high sensitivity) for socket-outlet circuits, lighting, wet rooms (bathroom\u002Fshower), as well as washing machines, dryers, and dishwashers",[33,133,134],{},"Proper earth connection with a resistance of at most 30 Ohms (AREI Art. 4.2.4.3b: if 30 Ohm is exceeded, additional high-sensitivity residual-current devices are required; general formula: R_A x I_delta_n \u003C= 50 V)",[33,136,137],{},"All cables are properly secured and protected",[33,139,140],{},"Junction boxes are accessible and properly closed",[33,142,143],{},"At least two separate lighting circuits for dwellings with more than two rooms (Art. 5.3.5.2b)",[87,145,147],{"id":146},"_3-common-mistakes-to-avoid","3. Common Mistakes to Avoid",[16,149,150],{},"These points deserve particular attention in practice; no unsupported ranking or failure statistic is claimed here:",[30,152,153,156,159,162,165,168],{},[33,154,155],{},"Missing or incorrect single-line diagram",[33,157,158],{},"Insufficient differential protection",[33,160,161],{},"Earth resistance too high",[33,163,164],{},"Cables not properly fixed or protected",[33,166,167],{},"Missing covers on junction boxes",[33,169,170],{},"Fewer than two separate lighting circuits for dwellings with more than two rooms",[11,172,174],{"id":173},"what-happens-during-the-inspection","What Happens During the Inspection?",[16,176,177],{},"Scope and duration depend on the installation and type of control. The inspector will among other things:",[179,180,181,187,193,199],"ol",{},[33,182,183,186],{},[36,184,185],{},"Check documentation"," — Verify that the single-line diagram and floor plan match the actual installation",[33,188,189,192],{},[36,190,191],{},"Visual inspection"," — Check all visible components, cables, and connections",[33,194,195,198],{},[36,196,197],{},"Measurements"," — Test earth resistance, insulation resistance, and loop impedance",[33,200,201,204],{},[36,202,203],{},"Functional tests"," — Test all differential switches and circuit breakers",[16,206,207],{},"After the inspection, you receive a written or electronic report. Its conclusion, infringements and any required follow-up are set out there. The often quoted 25-year period is the normal interval after a positive initial inspection of a domestic installation; it is not a universal “green certificate” for every situation.",[11,209,211],{"id":210},"identify-the-type-of-inspection-first","Identify the type of inspection first",[16,213,214,215,222],{},"The ",[216,217,221],"a",{"href":218,"rel":219},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations\u002Ftypes-de-controle-des",[220],"nofollow","official Federal Public Service Economy overview"," separates several procedures. A new installation and a major modification or extension undergo conformity control before use. A periodic inspection addresses safety during continuing operation. A sale inspection concerns certain older domestic installations that have not had the relevant complete conformity review. A capacity increase has its own conditions.",[16,224,225],{},"That distinction affects both deadlines and scope. For a major extension, the body considers the new work and its possible effect on unchanged parts. A minor change may not trigger the same control, but the installation file still needs updating. Describe the actual work to the electrician and inspection body instead of using the broad word “renovation”.",[11,227,229],{"id":228},"reconcile-the-documents-before-the-appointment","Reconcile the documents before the appointment",[16,231,232,233,238],{},"The federal ",[216,234,237],{"href":235,"rel":236},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[220],"domestic electrical inspection page"," lists at least the single-line diagrams, situation plans and the connection's EAN code when available. The single-line diagram represents circuits, interconnections and equipment characteristics. The situation plan locates the boards, boxes, sockets, lighting points, switches, fixed machines and sources referred to by the diagram.",[16,240,241],{},"Compare both drawings with the installation in a fixed order:",[179,243,244,247,250,253,256],{},[33,245,246],{},"do circuit references match at the board and on both drawings?",[33,248,249],{},"are ratings, poles, cable type and cross-section recorded correctly?",[33,251,252],{},"are newly added sockets, lights, fixed appliances and sources present?",[33,254,255],{},"can connection and junction boxes be found and accessed?",[33,257,258],{},"are the manufacturer records for PV, charger, battery or other special equipment available?",[16,260,261],{},"A polished drawing is not enough if it describes an old state. Conversely, technically sound work does not remove the documentation duty. Mark uncertainties and resolve them before the visit.",[11,263,265],{"id":264},"prepare-for-visual-examination-testing-and-measurement","Prepare for visual examination, testing and measurement",[16,267,268],{},"The inspection body compares documents with visible conditions and performs the tests and measurements required for that control. Owners should not invent values or copy measurements from an old report. Earth resistance, insulation and operation of protective devices must be assessed on the actual installation.",[16,270,271],{},"Provide safe access to the distribution board, earth-disconnection point and relevant rooms. Labels should be legible and covers complete. Tell the inspector in advance about local generation, a battery, backup function, charging equipment and older sections. Opening equipment or measuring live circuits is not a do-it-yourself preparation task.",[16,273,274],{},"Simple numbers also require context. Thirty ohms is not a universal pass\u002Ffail rule for every earthing arrangement; Book 1 relates earth resistance, residual-current protection and permissible touch voltage. Cable protection depends not just on cross-section but also conductor material, installation method, grouping, temperature, length and protective device.",[11,276,278],{"id":277},"act-on-the-report-not-on-a-generic-deadline","Act on the report, not on a generic deadline",[16,280,281],{},"A positive report records the assessment at the time and within the scope inspected. It does not remove maintenance duties or the need for a new assessment after later major work. Store the report with the installation file and record subsequent minor changes.",[16,283,284],{},"For a negative report, handle every listed infringement. Where infringements are found during conformity control before first use, the affected installation or section cannot be used until they are corrected and a new control is completed. For a negative periodic inspection, federal guidance describes a supplementary visit by the same body within twelve months. In the relevant sale inspection of an old dwelling, the buyer generally has eighteen months from the authentic deed to remedy the installation and arrange a new inspection. The report and control type remain decisive.",[11,286,288],{"id":287},"use-planelec-within-its-real-scope","Use PlanElec within its real scope",[11,290,292],{"id":291},"when-booking-and-on-the-day","When booking and on the day",[16,294,295],{},"Tell the inspection body whether the installation is domestic, the requested control type, the number of boards and any PV, battery, backup supply or charger. Ask which documents should be printed or digital, what access is needed, and confirm the body's current tariff directly. For a sale, mention the installation age and earlier reports; for an extension, distinguish old and new sections.",[16,297,298],{},"Provide a contact who knows the installation, keep boards and the earth-disconnection point safely accessible, and do not improvise electrical changes during the visit. Once the report arrives, check installation address, control type, inspected scope and document list for clerical errors. Raise technical questions in writing against the exact finding, and keep the final report with the plans that were presented.",[16,300,301],{},"If an area was inaccessible, check how that limitation affects the report and whether another visit is required.",[16,303,304],{},"Record that answer.",[16,306,307],{},"PlanElec can turn entered topology into a single-line diagram and situation plan, generate PDF documents, and flag supported planning issues that can be derived from the data. Its self-check is not a conformity certificate. It cannot see concealed wiring, perform electrical measurements or automatically know every manufacturer condition and legacy derogation.",[16,309,310,311,316],{},"Use it as a consistent documentation base: capture the installation, compare it with the executed work, have uncertainties reviewed professionally, and then export. The official conclusion remains with an approved inspection body. The ",[216,312,315],{"href":313,"rel":314},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Forganismes-de-controle-agrees",[220],"Federal Public Service Economy publishes the current list",".",[11,318,320],{"id":319},"record-the-inspected-scope-after-the-visit","Record the inspected scope after the visit",[16,322,323],{},"Note which boards, rooms, energy sources and operating modes were accessible and actually included. Compare that boundary with the wording in the report. A positive report for a clearly defined section does not assess additions made later or areas that were not inspected. If fixed wiring, protective devices, PV, battery or charging functions change after the visit, update the plans and installation file and determine which new control is required. Keep the exact plan version presented at the appointment unchanged beside the report; create a newly dated version for subsequent work. This preserves evidence of the configuration that the inspection body actually assessed.",[11,325,327],{"id":326},"how-planelec-helps","How PlanElec Helps",[16,329,330,331,334],{},"Creating the required documentation is often the most time-consuming part of preparing for an electrical inspection. ",[36,332,333],{},"PlanElec"," simplifies this process dramatically:",[30,336,337,343,349,355,361],{},[33,338,339,342],{},[36,340,341],{},"Create structured single-line diagrams"," from the recorded circuits",[33,344,345,348],{},[36,346,347],{},"Belgian symbol library"," for supported plan representations",[33,350,351,354],{},[36,352,353],{},"Situation plans"," based on the recorded floor plan",[33,356,357,360],{},[36,358,359],{},"Export to PDF"," for easy submission to the inspector",[33,362,363,366],{},[36,364,365],{},"Multi-language support"," — Documentation in Dutch, French, German, or English",[71,368,369],{},[16,370,371],{},"Compare the export with the executed installation and have design, measurements and unresolved technical questions assessed professionally.",[16,373,374],{},[216,375,377],{"href":376},"\u002F","Start creating your electrical documentation for free →",{"title":379,"searchDepth":380,"depth":380,"links":381},"",2,[382,383,384,390,391,392,393,394,395,396,397,398],{"id":13,"depth":380,"text":14},{"id":24,"depth":380,"text":25},{"id":81,"depth":380,"text":82,"children":385},[386,388,389],{"id":89,"depth":387,"text":90},3,{"id":116,"depth":387,"text":117},{"id":146,"depth":387,"text":147},{"id":173,"depth":380,"text":174},{"id":210,"depth":380,"text":211},{"id":228,"depth":380,"text":229},{"id":264,"depth":380,"text":265},{"id":277,"depth":380,"text":278},{"id":287,"depth":380,"text":288},{"id":291,"depth":380,"text":292},{"id":319,"depth":380,"text":320},{"id":326,"depth":380,"text":327},"guide","2026-01-08","Everything you need to know about the electrical inspection — from preparation to the final check.","md","2026-08-29","en",{},true,"\u002Fblog\u002Felectrical-inspection.en",null,"8 min",12,{"title":5,"description":401},"blog\u002Felectrical-inspection.en",[414,415,416,417,418,419,420,421,422,423,424,425,426,427,428,429],"AREI","RGIE","electrical inspection","keuring","contrôle électrique","single-line diagram","eendraadschema","Eindrahtschema","schéma unifilaire","situation plan","Situationsplan","plan de situation","compliance","RCD","earthing","Belgium","UND2MhK0gbJ9VxC4e_bm0KXCrjscn-fxExXd-qlyorU",[432,830,1085,1467],{"id":433,"title":434,"articleId":6,"body":435,"category":399,"date":400,"description":812,"extension":402,"lastUpdated":403,"locale":813,"meta":814,"navigation":406,"path":815,"publishDate":408,"readTime":409,"refreshInterval":410,"seo":816,"slug":817,"stem":818,"tags":819,"__hash__":829},"blog\u002Fblog\u002Felectrical-inspection.de.md","Stromabnahme in Belgien: Der komplette Leitfaden 2026",{"type":8,"value":436,"toc":793},[437,441,444,447,451,454,492,500,504,507,511,514,532,536,539,562,566,569,589,593,596,622,625,629,637,640,644,651,654,671,674,678,681,684,687,691,694,697,701,705,708,711,715,718,721,724,727,734,738,741,745,751,783,788],[11,438,440],{"id":439},"was-ist-eine-stromabnahme","Was ist eine Stromabnahme?",[16,442,443],{},"In Belgien werden elektrische Anlagen bei den im AREI\u002FRGIE festgelegten Anlässen von einem zugelassenen Kontrollorganismus geprüft. Dazu gehören insbesondere die Kontrolle vor Ingebrauchnahme einer neuen Anlage, wichtige Änderungen oder Erweiterungen, periodische Kontrollen und bestimmte Verkaufssituationen.",[16,445,446],{},"Welche Kontrolle erforderlich ist, hängt vom Anwendungsfall ab. Eine Verkaufskontrolle für eine ältere Installation ist nicht dasselbe wie die Konformitätskontrolle eines Neubaus. Starre Aussagen zu Dauer und Zusatzkosten sind ohne Projekt- und Anbieterbezug nicht belastbar.",[11,448,450],{"id":449},"wann-brauchen-sie-eine-abnahme","Wann brauchen Sie eine Abnahme?",[16,452,453],{},"Eine elektrische Abnahme ist in folgenden Situationen erforderlich:",[30,455,456,462,468,474,480,486],{},[33,457,458,461],{},[36,459,460],{},"Neuinstallationen",": Vor dem Erstanschluss ans Stromnetz",[33,463,464,467],{},[36,465,466],{},"Wichtige Änderungen oder Erweiterungen",": etwa ein neuer Stromkreis im Verteiler; kleine Änderungen werden anders eingeordnet",[33,469,470,473],{},[36,471,472],{},"Periodische Prüfung",": Alle 25 Jahre bei Wohngebäuden",[33,475,476,479],{},[36,477,478],{},"Immobilienverkauf",": Kontrollbesuch beim Verkauf einer Wohneinheit",[33,481,482,485],{},[36,483,484],{},"Nach einem Mängelbericht",": Wiederholungsprüfung nach Behebung festgestellter Mängel",[33,487,488,491],{},[36,489,490],{},"Leistungserhöhung",": in den vom AREI erfassten Fällen einer alten häuslichen Installation",[71,493,494],{},[16,495,496,499],{},[36,497,498],{},"Gut zu wissen",": Selbst wenn Sie nur einige neue Stromkreise hinzufügen, kann eine vollständige Neuprüfung ausgelöst werden. Klären Sie dies vorher immer mit Ihrem Elektriker oder der Prüfstelle ab.",[11,501,503],{"id":502},"wie-sie-sich-auf-die-abnahme-vorbereiten","Wie Sie sich auf die Abnahme vorbereiten",[16,505,506],{},"Eine gründliche Vorbereitung macht die Anlage prüfbar, garantiert aber kein positives Ergebnis. Folgendes sollten Sie bereithalten:",[87,508,510],{"id":509},"_1-erforderliche-dokumentation","1. Erforderliche Dokumentation",[16,512,513],{},"Der Prüfer wird folgende Unterlagen verlangen:",[30,515,516,521,526],{},[33,517,518,520],{},[36,519,421],{}," (Eendraadschema \u002F Schéma unifilaire) — Eine schematische Übersicht aller Stromkreise, Schutzvorrichtungen und Anschlüsse",[33,522,523,525],{},[36,524,424],{}," (Plan de situation) — Zeigt die physische Lage aller elektrischen Komponenten",[33,527,528,531],{},[36,529,530],{},"Technische Unterlagen",", soweit sie für besondere Komponenten wie PV-Anlage, Wallbox oder Speicher erforderlich sind",[87,533,535],{"id":534},"_2-anforderungen-an-die-installation","2. Anforderungen an die Installation",[16,537,538],{},"Stellen Sie sicher, dass Ihre Installation diese grundlegenden Anforderungen erfüllt:",[30,540,541,544,547,550,553,556,559],{},[33,542,543],{},"Alle Stromkreise sind ordnungsgemäß durch Leitungsschutzschalter geschützt",[33,545,546],{},"Ein 300mA FI-Schutzschalter schützt die gesamte Installation",[33,548,549],{},"Zusätzlicher 30mA FI-Schutz (hoch- bzw. sehr hochempfindlich) für Steckdosenstromkreise, Beleuchtung, Feuchträume (Bad\u002FDusche) sowie Waschmaschinen, Trockner und Geschirrspüler",[33,551,552],{},"Ordnungsgemäße Erdung mit einem Widerstand von höchstens 30 Ohm (AREI Art. 4.2.4.3b: bei Überschreitung von 30 Ω sind zusätzliche Differenzstrom-Schutzeinrichtungen mit hoher Empfindlichkeit vorgeschrieben; allgemeine Formel: R_A × I∆n ≤ 50 V)",[33,554,555],{},"Alle Kabel sind ordnungsgemäß befestigt und geschützt",[33,557,558],{},"Abzweigdosen sind zugänglich und ordnungsgemäß verschlossen",[33,560,561],{},"Mindestens zwei getrennte Beleuchtungsstromkreise bei Wohnungen mit mehr als zwei Räumen (Art. 5.3.5.2b)",[87,563,565],{"id":564},"_3-häufige-fehler-die-sie-vermeiden-sollten","3. Häufige Fehler, die Sie vermeiden sollten",[16,567,568],{},"In der Praxis verdienen diese Punkte besondere Aufmerksamkeit; es wird hier keine unbelegte Rangfolge oder Fehlerquote behauptet:",[30,570,571,574,577,580,583,586],{},[33,572,573],{},"Fehlendes oder falsches Eindrahtschema",[33,575,576],{},"Unzureichender FI-Schutz",[33,578,579],{},"Erdungswiderstand zu hoch",[33,581,582],{},"Kabel nicht ordnungsgemäß befestigt oder geschützt",[33,584,585],{},"Fehlende Abdeckungen an Abzweigdosen",[33,587,588],{},"Weniger als zwei getrennte Beleuchtungsstromkreise bei Wohnungen mit mehr als zwei Räumen",[11,590,592],{"id":591},"was-passiert-während-der-abnahme","Was passiert während der Abnahme?",[16,594,595],{},"Umfang und Dauer hängen von Anlage und Kontrollart ab. Der Vertreter des Kontrollorganismus wird unter anderem:",[179,597,598,604,610,616],{},[33,599,600,603],{},[36,601,602],{},"Dokumentation prüfen"," — Überprüfen, ob Eindrahtschema und Situationsplan mit der tatsächlichen Installation übereinstimmen",[33,605,606,609],{},[36,607,608],{},"Sichtprüfung"," — Alle sichtbaren Komponenten, Kabel und Anschlüsse kontrollieren",[33,611,612,615],{},[36,613,614],{},"Messungen durchführen"," — Erdungswiderstand, Isolationswiderstand und Schleifenimpedanz testen",[33,617,618,621],{},[36,619,620],{},"Funktionsprüfungen"," — Alle FI-Schutzschalter und Leitungsschutzschalter testen",[16,623,624],{},"Nach der Prüfung erhalten Sie einen schriftlichen oder elektronischen Bericht. Die Schlussfolgerung, festgestellte Verstöße und gegebenenfalls die erforderliche Folgemaßnahme stehen in diesem Bericht. Die oft genannte Frist von 25 Jahren bezeichnet die reguläre Periodizität nach einer positiven Erstkontrolle einer häuslichen Anlage; sie ist kein universelles „grünes Zertifikat“ für jede Situation.",[11,626,628],{"id":627},"kontrollart-zuerst-bestimmen","Kontrollart zuerst bestimmen",[16,630,631,632,636],{},"Die ",[216,633,635],{"href":218,"rel":634},[220],"offizielle Übersicht des SPF Economie"," unterscheidet mehrere Verfahren. Bei einer neuen Anlage und bei einer wichtigen Änderung oder Erweiterung erfolgt die Konformitätskontrolle vor der Ingebrauchnahme. Eine periodische Kontrolle dient der Sicherheit während des weiteren Betriebs. Eine Verkaufskontrolle betrifft bestimmte alte häusliche Anlagen, die nach dem maßgeblichen Stichtag noch keiner vollständigen Konformitätskontrolle unterzogen wurden. Bei einer Leistungserhöhung gelten wiederum eigene Voraussetzungen.",[16,638,639],{},"Diese Unterscheidung bestimmt nicht nur die Frist, sondern auch den betrachteten Umfang. Bei einer wichtigen Erweiterung prüft der Organismus die Erweiterung und ihre möglichen Auswirkungen auf den unveränderten Teil. Bei einer bloßen, nicht wichtigen Änderung muss das Dossier trotzdem nachgeführt werden. Beschreiben Sie dem Elektriker und Kontrollorganismus deshalb die tatsächlichen Arbeiten, statt nur „Renovierung“ anzukreuzen.",[11,641,643],{"id":642},"unterlagen-vor-dem-termin-abgleichen","Unterlagen vor dem Termin abgleichen",[16,645,631,646,650],{},[216,647,649],{"href":235,"rel":648},[220],"FOD-Seite zur häuslichen Elektrokontrolle"," nennt mindestens Eindrahtschema, Situationsplan und — sofern verfügbar — die EAN-Nummer des Anschlusses. Das Eindrahtschema zeigt Stromkreise, Verbindungen und Merkmale des Materials. Der Situationsplan verortet die darin genannten Verteiler, Dosen, Steckdosen, Lichtpunkte, Schalter, festen Maschinen und Quellen.",[16,652,653],{},"Vergleichen Sie beide Pläne systematisch mit der ausgeführten Anlage:",[179,655,656,659,662,665,668],{},[33,657,658],{},"Stimmen Stromkreiskennzeichen im Verteiler, Eindrahtschema und Situationsplan überein?",[33,660,661],{},"Sind Nennwerte, Polzahl, Kabeltyp und Querschnitt korrekt erfasst?",[33,663,664],{},"Sind neu hinzugefügte Steckdosen, Leuchten, feste Geräte und Quellen eingezeichnet?",[33,666,667],{},"Sind Verbindungs- und Abzweigdosen auffindbar und zugänglich?",[33,669,670],{},"Liegen Herstellerunterlagen für PV, Wallbox, Speicher oder andere besondere Betriebsmittel bereit?",[16,672,673],{},"Ein grafisch schöner Plan ist nicht ausreichend, wenn er eine alte Ausführung zeigt. Umgekehrt ersetzt eine fachlich richtige Installation nicht die geforderten Unterlagen. Markieren Sie offene Punkte und lassen Sie sie vor dem Kontrolltermin klären.",[11,675,677],{"id":676},"sichtprüfung-erprobung-und-messung-vorbereiten","Sichtprüfung, Erprobung und Messung vorbereiten",[16,679,680],{},"Der Organismus vergleicht Dokumentation und sichtbaren Zustand und führt die für die Kontrollart vorgesehenen Prüfungen und Messungen aus. Eigentümer sollten keine Messwerte erfinden oder aus einem früheren Bericht übernehmen. Erdungswiderstand, Isolationszustand und das Verhalten von Schutzgeräten müssen an der konkreten Installation beurteilt werden.",[16,682,683],{},"Sorgen Sie für sicheren Zugang zu Verteiler, Erdungstrennstelle und relevanten Räumen. Beschriftungen müssen lesbar sein; Abdeckungen dürfen nicht fehlen. Teilen Sie Besonderheiten wie lokale Erzeugung, Batterie, Notstromfunktion, Ladeinfrastruktur oder ältere Anlagenteile vorab mit. Eigenmächtiges Öffnen oder Messen unter Spannung gehört nicht zur Vorbereitung durch Laien.",[16,685,686],{},"Auch einfache Regeln dürfen nicht isoliert angewandt werden. Der Wert 30 Ohm ist beispielsweise kein pauschales Alles-oder-nichts-Kriterium für jede Erdungssituation; Buch 1 verknüpft Erdungswiderstand, Fehlerstromschutz und zulässige Berührungsspannung. Kabelschutz hängt nicht nur vom Querschnitt, sondern auch von Verlegeart, Material, Bündelung, Temperatur, Länge und Schutzgerät ab.",[11,688,690],{"id":689},"nach-dem-bericht","Nach dem Bericht",[16,692,693],{},"Ein positiver Bericht bestätigt die Bewertung zum Zeitpunkt und Umfang der Kontrolle. Er entbindet den Verantwortlichen nicht von Wartung oder von einer neuen Beurteilung nach späteren wichtigen Änderungen. Bewahren Sie Bericht und Installationsdossier gemeinsam auf und dokumentieren Sie spätere kleine Änderungen.",[16,695,696],{},"Bei einem negativen Bericht behandeln Sie jeden aufgeführten Verstoß einzeln. Für Verstöße bei der Konformitätskontrolle vor Ingebrauchnahme darf der betroffene Teil nicht in Gebrauch genommen werden, bevor die Verstöße behoben und erneut kontrolliert wurden. Bei der periodischen Kontrolle nennt die offizielle FOD-FAQ eine ergänzende Kontrolle durch denselben Organismus innerhalb von zwölf Monaten. Bei der Verkaufskontrolle einer einschlägigen alten Wohneinheit hat der Käufer grundsätzlich achtzehn Monate ab der authentischen Urkunde für Instandsetzung und neue Kontrolle. Der konkrete Bericht und die Kontrollart bleiben entscheidend.",[11,698,700],{"id":699},"planelec-realistisch-einsetzen","PlanElec realistisch einsetzen",[11,702,704],{"id":703},"fragen-bei-der-terminvereinbarung","Fragen bei der Terminvereinbarung",[16,706,707],{},"Nennen Sie dem Kontrollorganismus Wohn- oder Nichtwohnnutzung, Art der Kontrolle, Zahl der Verteiler und besondere Quellen. Fragen Sie, welche Unterlagen digital oder ausgedruckt erwartet werden, ob der gesamte Bau zugänglich sein muss und wie mit einer Anlage in Renovierung umzugehen ist. Lassen Sie sich Tarif, Zahlungsweise und Bedingungen für eine Terminverschiebung direkt bestätigen; veröffentlichte Pauschalen anderer Anbieter sind nicht übertragbar.",[16,709,710],{},"Bei einer Verkaufskontrolle teilen Sie Baualter und bekannte frühere Berichte mit. Bei einer wichtigen Erweiterung beschreiben Sie Altbestand und neuen Teil. Bei PV, Speicher oder Wallbox nennen Sie Betriebsart und relevante Herstellerunterlagen. So kann der Organismus den richtigen Kontrolltyp und Zeitbedarf planen, ohne dass Sie das Ergebnis vorwegnehmen.",[11,712,714],{"id":713},"am-kontrolltag","Am Kontrolltag",[16,716,717],{},"Halten Sie einen Ansprechpartner bereit, der die Anlage kennt, aber die Prüfung nicht beeinflusst. Entfernen Sie keine fest montierten Abdeckungen im Voraus, sofern der Organismus nichts anderes verlangt; sichere Zugänglichkeit ist wichtiger als improvisiertes Öffnen. Stellen Sie sicher, dass Haustiere, gelagerte Gegenstände oder abgeschlossene Räume den Zugang nicht verhindern.",[16,719,720],{},"Notieren Sie Fragen, ändern Sie während der Kontrolle aber nicht spontan die Installation. Nach Erhalt prüfen Sie Name und Adresse der Anlage, Kontrollart, Anlagenumfang und aufgeführte Dokumente auf offensichtliche Schreibfehler. Fachliche Einwände werden sachlich und schriftlich mit Bezug auf die konkrete Feststellung geklärt. Bewahren Sie die endgültige Fassung zusammen mit den vorgelegten Plänen auf.",[16,722,723],{},"Wenn während des Termins ein Raum oder Anlagenteil nicht zugänglich war, behandeln Sie das nicht als nebensächliche Formalität. Lesen Sie im Bericht nach, wie die Einschränkung die Schlussfolgerung beeinflusst, und klären Sie, ob eine zusätzliche Kontrolle erforderlich ist.",[16,725,726],{},"PlanElec kann die erfasste Topologie in Eindrahtschema und Situationsplan überführen, PDF-Unterlagen erzeugen und auf unterstützte, aus den Daten ableitbare Planungsprobleme hinweisen. Der Selbstcheck ist keine Konformitätsbescheinigung. Er sieht keine verdeckte Leitungsführung, führt keine elektrische Messung aus und kennt nicht automatisch jede Herstellerbedingung oder Abweichung einer Altanlage.",[16,728,729,730,316],{},"Nutzen Sie das Werkzeug deshalb als konsistente Dokumentationsbasis: Erfassen, mit der Ausführung vergleichen, Unklarheiten fachlich prüfen lassen und erst dann exportieren. Die offizielle Entscheidung bleibt beim zugelassenen Kontrollorganismus. Eine Liste dieser Stellen veröffentlicht der ",[216,731,733],{"href":313,"rel":732},[220],"SPF Economie",[11,735,737],{"id":736},"prüfumfang-nach-dem-termin-dokumentieren","Prüfumfang nach dem Termin dokumentieren",[16,739,740],{},"Notieren Sie, welche Verteiler, Räume, Stromquellen und Betriebsarten tatsächlich zugänglich und Bestandteil der Kontrolle waren. Stimmen Sie diese Abgrenzung mit der Bezeichnung im Bericht ab. Ein positiver Bericht für einen klar umgrenzten Anlagenteil ist keine Aussage über später ergänzte oder nicht besichtigte Teile. Werden nach dem Termin feste Leitungen, Schutzgeräte, PV-, Batterie- oder Ladefunktionen geändert, gehört die Änderung in Pläne und Anlagendossier; außerdem ist zu klären, welche neue Kontrolle erforderlich wird. Bewahren Sie die beim Termin vorgelegte Planversion unverändert beim Bericht auf und erstellen Sie für spätere Änderungen eine neue, datierte Version. Dadurch bleibt nachvollziehbar, welcher Ausführungsstand tatsächlich beurteilt wurde.",[11,742,744],{"id":743},"wie-planelec-hilft","Wie PlanElec hilft",[16,746,747,748,750],{},"Die Erstellung der erforderlichen Dokumentation ist oft der zeitaufwändigste Teil der Vorbereitung auf eine Stromabnahme. ",[36,749,333],{}," vereinfacht diesen Prozess erheblich:",[30,752,753,759,765,771,777],{},[33,754,755,758],{},[36,756,757],{},"Eindrahtschemas strukturiert erstellen"," aus den erfassten Stromkreisen",[33,760,761,764],{},[36,762,763],{},"Belgische Symbolbibliothek"," für die unterstützten Plandarstellungen",[33,766,767,770],{},[36,768,769],{},"Situationspläne"," auf Basis des erfassten Grundrisses",[33,772,773,776],{},[36,774,775],{},"Export als PDF"," zur einfachen Vorlage beim Prüfer",[33,778,779,782],{},[36,780,781],{},"Mehrsprachig"," — Dokumentation auf Niederländisch, Französisch, Deutsch oder Englisch",[71,784,785],{},[16,786,787],{},"Prüfen Sie den Export gegen die ausgeführte Anlage und lassen Sie Dimensionierung, Messungen und offene Fachfragen professionell beurteilen.",[16,789,790],{},[216,791,792],{"href":376},"Starten Sie jetzt kostenlos mit Ihrer elektrischen Dokumentation →",{"title":379,"searchDepth":380,"depth":380,"links":794},[795,796,797,802,803,804,805,806,807,808,809,810,811],{"id":439,"depth":380,"text":440},{"id":449,"depth":380,"text":450},{"id":502,"depth":380,"text":503,"children":798},[799,800,801],{"id":509,"depth":387,"text":510},{"id":534,"depth":387,"text":535},{"id":564,"depth":387,"text":565},{"id":591,"depth":380,"text":592},{"id":627,"depth":380,"text":628},{"id":642,"depth":380,"text":643},{"id":676,"depth":380,"text":677},{"id":689,"depth":380,"text":690},{"id":699,"depth":380,"text":700},{"id":703,"depth":380,"text":704},{"id":713,"depth":380,"text":714},{"id":736,"depth":380,"text":737},{"id":743,"depth":380,"text":744},"Alles was Sie über die elektrische Abnahme wissen müssen — von der Vorbereitung bis zur Prüfung.","de",{},"\u002Fblog\u002Felectrical-inspection.de",{"title":434,"description":812},"elektrische-abnahme","blog\u002Felectrical-inspection.de",[414,415,820,821,822,421,823,424,824,825,826,827,828,422,425],"Stromabnahme","Keuring","elektrische Abnahme","Eendraadschema","Konformitätserklärung","FI-Schutzschalter","Erdung","Elektriker","Belgien","2-rURvU7fgFiu_PZoaH1YpcfzfSZ7Am9PXQ1aQp45FY",{"id":4,"title":5,"articleId":6,"body":831,"category":399,"date":400,"description":401,"extension":402,"lastUpdated":403,"locale":404,"meta":1082,"navigation":406,"path":407,"publishDate":408,"readTime":409,"refreshInterval":410,"seo":1083,"slug":6,"stem":412,"tags":1084,"__hash__":430},{"type":8,"value":832,"toc":1064},[833,835,837,839,841,843,869,875,877,879,881,883,897,899,901,917,919,921,935,937,939,957,959,961,966,968,970,975,977,989,991,993,995,997,999,1001,1003,1005,1007,1009,1011,1013,1015,1017,1019,1024,1026,1028,1030,1034,1056,1060],[11,834,14],{"id":13},[16,836,18],{},[16,838,21],{},[11,840,25],{"id":24},[16,842,28],{},[30,844,845,849,853,857,861,865],{},[33,846,847,39],{},[36,848,38],{},[33,850,851,45],{},[36,852,44],{},[33,854,855,51],{},[36,856,50],{},[33,858,859,57],{},[36,860,56],{},[33,862,863,63],{},[36,864,62],{},[33,866,867,69],{},[36,868,68],{},[71,870,871],{},[16,872,873,78],{},[36,874,77],{},[11,876,82],{"id":81},[16,878,85],{},[87,880,90],{"id":89},[16,882,93],{},[30,884,885,889,893],{},[33,886,887,101],{},[36,888,100],{},[33,890,891,107],{},[36,892,106],{},[33,894,895,113],{},[36,896,112],{},[87,898,117],{"id":116},[16,900,120],{},[30,902,903,905,907,909,911,913,915],{},[33,904,125],{},[33,906,128],{},[33,908,131],{},[33,910,134],{},[33,912,137],{},[33,914,140],{},[33,916,143],{},[87,918,147],{"id":146},[16,920,150],{},[30,922,923,925,927,929,931,933],{},[33,924,155],{},[33,926,158],{},[33,928,161],{},[33,930,164],{},[33,932,167],{},[33,934,170],{},[11,936,174],{"id":173},[16,938,177],{},[179,940,941,945,949,953],{},[33,942,943,186],{},[36,944,185],{},[33,946,947,192],{},[36,948,191],{},[33,950,951,198],{},[36,952,197],{},[33,954,955,204],{},[36,956,203],{},[16,958,207],{},[11,960,211],{"id":210},[16,962,214,963,222],{},[216,964,221],{"href":218,"rel":965},[220],[16,967,225],{},[11,969,229],{"id":228},[16,971,232,972,238],{},[216,973,237],{"href":235,"rel":974},[220],[16,976,241],{},[179,978,979,981,983,985,987],{},[33,980,246],{},[33,982,249],{},[33,984,252],{},[33,986,255],{},[33,988,258],{},[16,990,261],{},[11,992,265],{"id":264},[16,994,268],{},[16,996,271],{},[16,998,274],{},[11,1000,278],{"id":277},[16,1002,281],{},[16,1004,284],{},[11,1006,288],{"id":287},[11,1008,292],{"id":291},[16,1010,295],{},[16,1012,298],{},[16,1014,301],{},[16,1016,304],{},[16,1018,307],{},[16,1020,310,1021,316],{},[216,1022,315],{"href":313,"rel":1023},[220],[11,1025,320],{"id":319},[16,1027,323],{},[11,1029,327],{"id":326},[16,1031,330,1032,334],{},[36,1033,333],{},[30,1035,1036,1040,1044,1048,1052],{},[33,1037,1038,342],{},[36,1039,341],{},[33,1041,1042,348],{},[36,1043,347],{},[33,1045,1046,354],{},[36,1047,353],{},[33,1049,1050,360],{},[36,1051,359],{},[33,1053,1054,366],{},[36,1055,365],{},[71,1057,1058],{},[16,1059,371],{},[16,1061,1062],{},[216,1063,377],{"href":376},{"title":379,"searchDepth":380,"depth":380,"links":1065},[1066,1067,1068,1073,1074,1075,1076,1077,1078,1079,1080,1081],{"id":13,"depth":380,"text":14},{"id":24,"depth":380,"text":25},{"id":81,"depth":380,"text":82,"children":1069},[1070,1071,1072],{"id":89,"depth":387,"text":90},{"id":116,"depth":387,"text":117},{"id":146,"depth":387,"text":147},{"id":173,"depth":380,"text":174},{"id":210,"depth":380,"text":211},{"id":228,"depth":380,"text":229},{"id":264,"depth":380,"text":265},{"id":277,"depth":380,"text":278},{"id":287,"depth":380,"text":288},{"id":291,"depth":380,"text":292},{"id":319,"depth":380,"text":320},{"id":326,"depth":380,"text":327},{},{"title":5,"description":401},[414,415,416,417,418,419,420,421,422,423,424,425,426,427,428,429],{"id":1086,"title":1087,"articleId":6,"body":1088,"category":399,"date":400,"description":1453,"extension":402,"lastUpdated":403,"locale":1454,"meta":1455,"navigation":406,"path":1456,"publishDate":408,"readTime":409,"refreshInterval":410,"seo":1457,"slug":1458,"stem":1459,"tags":1460,"__hash__":1466},"blog\u002Fblog\u002Felectrical-inspection.fr.md","Contrôle Électrique en Belgique : Le Guide Complet 2026",{"type":8,"value":1089,"toc":1435},[1090,1094,1097,1100,1104,1107,1145,1153,1157,1160,1164,1167,1187,1191,1194,1217,1221,1224,1244,1248,1251,1277,1280,1284,1292,1295,1299,1306,1309,1326,1329,1333,1336,1339,1342,1346,1349,1352,1356,1360,1363,1366,1369,1376,1380,1383,1387,1393,1425,1430],[11,1091,1093],{"id":1092},"quest-ce-quun-contrôle-électrique","Qu'est-ce qu'un Contrôle Électrique ?",[16,1095,1096],{},"En Belgique, les installations électriques sont contrôlées par un organisme agréé aux moments définis par le RGIE : notamment avant la mise en usage d'une nouvelle installation, lors d'une modification ou extension importante, périodiquement et dans certaines ventes.",[16,1098,1099],{},"La procédure dépend du cas. Le contrôle « vente » d'une ancienne installation n'est pas le contrôle de conformité d'une construction neuve. Une durée ou un surcoût fixe ne peut pas être annoncé sans connaître le projet et le prestataire.",[11,1101,1103],{"id":1102},"quand-avez-vous-besoin-dun-contrôle","Quand avez-vous besoin d'un contrôle ?",[16,1105,1106],{},"Un contrôle électrique est requis dans les situations suivantes :",[30,1108,1109,1115,1121,1127,1133,1139],{},[33,1110,1111,1114],{},[36,1112,1113],{},"Nouvelles installations"," : Avant le premier raccordement au réseau électrique",[33,1116,1117,1120],{},[36,1118,1119],{},"Modifications ou extensions importantes"," : par exemple l'ajout d'un circuit au tableau ; une petite modification est traitée autrement",[33,1122,1123,1126],{},[36,1124,1125],{},"Contrôle périodique"," : Tous les 25 ans pour les bâtiments résidentiels",[33,1128,1129,1132],{},[36,1130,1131],{},"Vente immobilière"," : Visite de contrôle lors de la vente d'une unité d'habitation",[33,1134,1135,1138],{},[36,1136,1137],{},"Après un rapport d'infraction"," : Recontrôle après correction des problèmes identifiés",[33,1140,1141,1144],{},[36,1142,1143],{},"Renforcement de puissance"," : dans les cas prévus pour certaines anciennes installations domestiques",[71,1146,1147],{},[16,1148,1149,1152],{},[36,1150,1151],{},"Bon à savoir"," : Même si vous n'ajoutez que quelques nouveaux circuits, un recontrôle complet peut être déclenché. Vérifiez toujours auprès de votre électricien ou organisme de contrôle au préalable.",[11,1154,1156],{"id":1155},"comment-se-préparer-au-contrôle","Comment se préparer au contrôle",[16,1158,1159],{},"Une bonne préparation rend l'installation contrôlable, sans garantir une conclusion positive. Préparez notamment :",[87,1161,1163],{"id":1162},"_1-documentation-requise","1. Documentation requise",[16,1165,1166],{},"L'inspecteur demandera les documents suivants :",[30,1168,1169,1175,1181],{},[33,1170,1171,1174],{},[36,1172,1173],{},"Schéma unifilaire"," — Un aperçu schématique de tous les circuits, dispositifs de protection et raccordements",[33,1176,1177,1180],{},[36,1178,1179],{},"Plan de situation"," — Indique l'emplacement physique de tous les composants électriques",[33,1182,1183,1186],{},[36,1184,1185],{},"Documents techniques"," utiles pour les équipements particuliers comme PV, borne ou batterie",[87,1188,1190],{"id":1189},"_2-exigences-de-linstallation","2. Exigences de l'installation",[16,1192,1193],{},"Assurez-vous que votre installation répond à ces exigences de base :",[30,1195,1196,1199,1202,1205,1208,1211,1214],{},[33,1197,1198],{},"Tous les circuits sont correctement protégés par des disjoncteurs",[33,1200,1201],{},"Un différentiel de 300mA protège l'ensemble de l'installation",[33,1203,1204],{},"Protection différentielle supplémentaire de 30mA (haute ou très haute sensibilité) pour les circuits de prises de courant, l'éclairage, les pièces humides (salle de bain\u002Fdouche), ainsi que les lave-linge, sèche-linge et lave-vaisselle",[33,1206,1207],{},"Mise à la terre correcte avec une résistance maximale de 30 Ohms (RGIE Art. 4.2.4.3b : en cas de dépassement de 30 Ω, des dispositifs différentiels à haute sensibilité supplémentaires sont requis ; formule générale : R_A × I∆n ≤ 50 V)",[33,1209,1210],{},"Tous les câbles sont correctement fixés et protégés",[33,1212,1213],{},"Les boîtes de dérivation sont accessibles et correctement fermées",[33,1215,1216],{},"Au moins deux circuits d'éclairage séparés pour les appartements de plus de deux pièces (Art. 5.3.5.2b)",[87,1218,1220],{"id":1219},"_3-erreurs-courantes-à-éviter","3. Erreurs courantes à éviter",[16,1222,1223],{},"Ces points méritent une attention particulière ; aucune statistique ni hiérarchie non sourcée n'est affirmée ici :",[30,1225,1226,1229,1232,1235,1238,1241],{},[33,1227,1228],{},"Schéma unifilaire manquant ou incorrect",[33,1230,1231],{},"Protection différentielle insuffisante",[33,1233,1234],{},"Résistance de terre trop élevée",[33,1236,1237],{},"Câbles mal fixés ou non protégés",[33,1239,1240],{},"Couvercles manquants sur les boîtes de dérivation",[33,1242,1243],{},"Moins de deux circuits d'éclairage séparés pour les appartements de plus de deux pièces",[11,1245,1247],{"id":1246},"que-se-passe-t-il-pendant-le-contrôle","Que se passe-t-il pendant le contrôle ?",[16,1249,1250],{},"La portée et la durée dépendent de l'installation et du type de contrôle. Le représentant va notamment :",[179,1252,1253,1259,1265,1271],{},[33,1254,1255,1258],{},[36,1256,1257],{},"Vérifier la documentation"," — S'assurer que le schéma unifilaire et le plan de situation correspondent à l'installation réelle",[33,1260,1261,1264],{},[36,1262,1263],{},"Inspection visuelle"," — Contrôler tous les composants, câbles et connexions visibles",[33,1266,1267,1270],{},[36,1268,1269],{},"Effectuer des mesures"," — Tester la résistance de terre, la résistance d'isolement et l'impédance de boucle",[33,1272,1273,1276],{},[36,1274,1275],{},"Tests fonctionnels"," — Tester tous les différentiels et disjoncteurs",[16,1278,1279],{},"Après le contrôle, vous recevez un rapport écrit ou électronique. Il mentionne la conclusion, les infractions et la suite éventuelle. Les 25 ans souvent cités correspondent à la périodicité ordinaire après un premier contrôle positif d'une installation domestique ; ce n'est pas un « certificat vert » universel.",[11,1281,1283],{"id":1282},"déterminer-dabord-le-type-de-contrôle","Déterminer d'abord le type de contrôle",[16,1285,1286,1287,1291],{},"La ",[216,1288,1290],{"href":218,"rel":1289},[220],"page officielle du SPF Economie"," distingue plusieurs procédures. Une installation neuve et une modification ou extension importante font l'objet d'un contrôle de conformité avant mise en usage. Le contrôle périodique suit la sécurité pendant l'exploitation. Le contrôle lors de la vente vise certaines anciennes installations domestiques qui n'ont pas subi l'examen complet concerné. Le renforcement de puissance possède encore d'autres conditions.",[16,1293,1294],{},"Cette distinction détermine les délais et la portée. Pour une extension importante, l'organisme considère les travaux et leurs effets possibles sur la partie inchangée. Une modification non importante n'entraîne pas nécessairement le même contrôle, mais le dossier doit rester à jour. Décrivez les travaux réels plutôt que de les résumer par le mot « rénovation ».",[11,1296,1298],{"id":1297},"comparer-les-plans-avec-linstallation","Comparer les plans avec l'installation",[16,1300,1286,1301,1305],{},[216,1302,1304],{"href":235,"rel":1303},[220],"page fédérale sur le contrôle domestique"," demande au minimum les schémas unifilaires, les plans de situation et, s'il est disponible, le code EAN. Le schéma décrit les circuits, connexions et caractéristiques du matériel. Le plan situe les tableaux, boîtes, prises, points lumineux, interrupteurs, machines fixes et sources auxquels il fait référence.",[16,1307,1308],{},"Effectuez un rapprochement systématique :",[179,1310,1311,1314,1317,1320,1323],{},[33,1312,1313],{},"les repères de circuits correspondent-ils au tableau et sur les deux plans ?",[33,1315,1316],{},"calibres, nombre de pôles, type et section des câbles sont-ils corrects ?",[33,1318,1319],{},"les prises, luminaires, appareils fixes et sources ajoutés figurent-ils sur les plans ?",[33,1321,1322],{},"les boîtes de connexion et de dérivation restent-elles repérables et accessibles ?",[33,1324,1325],{},"les notices du PV, de la borne, de la batterie ou d'un autre matériel spécial sont-elles disponibles ?",[16,1327,1328],{},"Un beau dessin ne suffit pas s'il décrit un état ancien. Inversement, une réalisation correcte n'efface pas l'obligation documentaire. Notez les incertitudes et résolvez-les avant le rendez-vous.",[11,1330,1332],{"id":1331},"préparer-lexamen-les-essais-et-les-mesures","Préparer l'examen, les essais et les mesures",[16,1334,1335],{},"L'organisme compare les documents avec l'état visible et réalise les essais et mesures prévus. Il ne faut ni inventer de valeurs ni recopier celles d'un ancien rapport. Résistance de terre, isolement et fonctionnement des protections s'apprécient sur l'installation présente.",[16,1337,1338],{},"Rendez accessibles le tableau, la barrette de coupure de terre et les locaux concernés. Les étiquettes doivent être lisibles et les enveloppes complètes. Signalez la production locale, la batterie, la fonction de secours, la recharge et les parties anciennes. L'ouverture d'appareils ou les mesures sous tension ne sont pas des tâches de préparation pour un particulier.",[16,1340,1341],{},"Les chiffres simples demandent aussi du contexte. Trente ohms n'est pas un verdict universel pour toute mise à la terre : le Livre 1 relie résistance de terre, protection différentielle et tension de contact admissible. La protection d'un câble dépend de sa section, mais aussi du matériau, de la pose, du groupement, de la température, de la longueur et du dispositif choisi.",[11,1343,1345],{"id":1344},"suivre-le-rapport-et-le-bon-délai","Suivre le rapport et le bon délai",[16,1347,1348],{},"Un rapport positif consigne une appréciation à un moment et pour une portée définis. Il ne supprime ni l'entretien ni un nouveau contrôle après de futurs travaux importants. Conservez-le avec le dossier et notez les petites modifications ultérieures.",[16,1350,1351],{},"En cas de rapport négatif, traitez chaque infraction. Lors d'un contrôle avant mise en usage, la partie concernée ne peut être utilisée avant correction et nouveau contrôle. Après un contrôle périodique négatif, les informations fédérales prévoient une visite complémentaire par le même organisme dans les douze mois. Pour le contrôle « vente » d'une ancienne habitation concernée, l'acheteur dispose en principe de dix-huit mois à compter de l'acte authentique pour remettre en ordre et faire réaliser une nouvelle visite. Le type de contrôle et le rapport restent déterminants.",[11,1353,1355],{"id":1354},"employer-planelec-dans-son-périmètre-réel","Employer PlanElec dans son périmètre réel",[11,1357,1359],{"id":1358},"lors-de-la-réservation-et-le-jour-du-contrôle","Lors de la réservation et le jour du contrôle",[16,1361,1362],{},"Indiquez à l'organisme l'usage domestique, le type de contrôle, le nombre de tableaux et la présence de PV, batterie, secours ou borne. Demandez quels documents doivent être imprimés ou numériques, quels accès prévoir et confirmez directement le tarif actuel. Pour une vente, mentionnez l'âge et les anciens rapports ; pour une extension, séparez clairement existant et neuf.",[16,1364,1365],{},"Prévoyez un interlocuteur connaissant l'installation, rendez tableaux et barrette de terre accessibles en sécurité et ne modifiez rien improvisé pendant la visite. À réception, vérifiez adresse, type, portée et liste des documents. Posez toute question technique par écrit en citant le constat exact et conservez le rapport final avec les plans présentés.",[16,1367,1368],{},"PlanElec transforme la topologie saisie en schéma unifilaire et plan de situation, produit des PDF et signale certains problèmes de conception déductibles des données. Son autocontrôle n'est pas une attestation de conformité. Il ne voit pas les canalisations cachées, n'effectue aucune mesure et ne connaît pas automatiquement chaque notice ou dérogation ancienne.",[16,1370,1371,1372,316],{},"Utilisez-le comme base documentaire cohérente : saisir, comparer avec la réalisation, faire vérifier les incertitudes, puis exporter. La conclusion officielle appartient à l'organisme agréé. Le ",[216,1373,1375],{"href":313,"rel":1374},[220],"SPF Economie en publie la liste",[11,1377,1379],{"id":1378},"consigner-le-périmètre-contrôlé-après-la-visite","Consigner le périmètre contrôlé après la visite",[16,1381,1382],{},"Notez quels tableaux, locaux, sources d'énergie et modes de fonctionnement étaient accessibles et réellement compris dans le contrôle. Comparez cette limite avec le libellé du rapport. Un rapport positif pour une partie clairement délimitée ne se prononce pas sur les ajouts ultérieurs ni sur les zones non inspectées. Si des canalisations fixes, protections, fonctions photovoltaïques, batterie ou recharge changent après la visite, actualisez les plans et le dossier, puis déterminez quel nouveau contrôle est requis. Conservez sans modification la version des plans présentée au rendez-vous avec le rapport ; créez une nouvelle version datée pour les travaux suivants. Il reste ainsi possible d'identifier l'état effectivement évalué par l'organisme.",[11,1384,1386],{"id":1385},"comment-planelec-vous-aide","Comment PlanElec vous aide",[16,1388,1389,1390,1392],{},"La création de la documentation requise est souvent la partie la plus chronophage de la préparation d'un contrôle électrique. ",[36,1391,333],{}," simplifie considérablement ce processus :",[30,1394,1395,1401,1407,1413,1419],{},[33,1396,1397,1400],{},[36,1398,1399],{},"Créer des schémas unifilaires structurés"," à partir des circuits saisis",[33,1402,1403,1406],{},[36,1404,1405],{},"Bibliothèque de symboles belges"," pour les représentations prises en charge",[33,1408,1409,1412],{},[36,1410,1411],{},"Plans de situation"," basés sur le plan d'étage saisi",[33,1414,1415,1418],{},[36,1416,1417],{},"Export en PDF"," pour une soumission facile à l'inspecteur",[33,1420,1421,1424],{},[36,1422,1423],{},"Support multilingue"," — Documentation en néerlandais, français, allemand ou anglais",[71,1426,1427],{},[16,1428,1429],{},"Comparez l'export à l'installation réalisée et faites valider dimensionnement, mesures et questions techniques par un professionnel.",[16,1431,1432],{},[216,1433,1434],{"href":376},"Commencez gratuitement votre documentation électrique →",{"title":379,"searchDepth":380,"depth":380,"links":1436},[1437,1438,1439,1444,1445,1446,1447,1448,1449,1450,1451,1452],{"id":1092,"depth":380,"text":1093},{"id":1102,"depth":380,"text":1103},{"id":1155,"depth":380,"text":1156,"children":1440},[1441,1442,1443],{"id":1162,"depth":387,"text":1163},{"id":1189,"depth":387,"text":1190},{"id":1219,"depth":387,"text":1220},{"id":1246,"depth":380,"text":1247},{"id":1282,"depth":380,"text":1283},{"id":1297,"depth":380,"text":1298},{"id":1331,"depth":380,"text":1332},{"id":1344,"depth":380,"text":1345},{"id":1354,"depth":380,"text":1355},{"id":1358,"depth":380,"text":1359},{"id":1378,"depth":380,"text":1379},{"id":1385,"depth":380,"text":1386},"Tout ce que vous devez savoir sur le contrôle électrique — de la préparation à l'inspection finale.","fr",{},"\u002Fblog\u002Felectrical-inspection.fr",{"title":1087,"description":1453},"controle-electrique","blog\u002Felectrical-inspection.fr",[414,415,418,417,422,420,425,424,1461,1462,1463,1464,1465,421,419],"conformité","différentiel","mise à la terre","électricien","Belgique","1rKs4EEbNHCpHdxeRfe6J7rl6kAoW8lN3wM5YUMuR9E",{"id":1468,"title":1469,"articleId":6,"body":1470,"category":399,"date":400,"description":1855,"extension":402,"lastUpdated":403,"locale":1856,"meta":1857,"navigation":406,"path":1858,"publishDate":408,"readTime":409,"refreshInterval":410,"seo":1859,"slug":1860,"stem":1861,"tags":1862,"__hash__":1870},"blog\u002Fblog\u002Felectrical-inspection.nl.md","Elektrische Keuring in België: De Volledige Gids 2026",{"type":8,"value":1471,"toc":1836},[1472,1476,1479,1482,1486,1489,1527,1535,1539,1542,1546,1549,1568,1572,1575,1598,1602,1605,1625,1629,1632,1658,1661,1665,1673,1676,1680,1688,1691,1708,1711,1715,1718,1721,1724,1728,1731,1734,1738,1742,1745,1748,1752,1755,1758,1761,1764,1767,1770,1777,1781,1784,1788,1794,1826,1831],[11,1473,1475],{"id":1474},"wat-is-een-elektrische-keuring","Wat is een Elektrische Keuring?",[16,1477,1478],{},"In België worden elektrische installaties op de in het AREI bepaalde momenten door een erkend organisme gekeurd. Het gaat onder meer om ingebruikname van een nieuwe installatie, belangrijke wijzigingen of uitbreidingen, periodieke controles en bepaalde verkopen.",[16,1480,1481],{},"De juiste procedure hangt van de situatie af. Een verkoopkeuring van een oudere installatie is niet hetzelfde als de gelijkvormigheidscontrole van nieuwbouw. Vaste uitspraken over vertraging of extra kosten zijn zonder project en aanbieder niet betrouwbaar.",[11,1483,1485],{"id":1484},"wanneer-heeft-u-een-keuring-nodig","Wanneer heeft u een keuring nodig?",[16,1487,1488],{},"Een elektrische keuring is vereist in de volgende situaties:",[30,1490,1491,1497,1503,1509,1515,1521],{},[33,1492,1493,1496],{},[36,1494,1495],{},"Nieuwe installaties",": Voor de eerste aansluiting op het elektriciteitsnet",[33,1498,1499,1502],{},[36,1500,1501],{},"Belangrijke wijzigingen of uitbreidingen",": bijvoorbeeld een nieuwe kring in het bord; kleine wijzigingen worden anders behandeld",[33,1504,1505,1508],{},[36,1506,1507],{},"Periodieke keuring",": Elke 25 jaar bij woningen",[33,1510,1511,1514],{},[36,1512,1513],{},"Verkoop van onroerend goed",": Controlebezoek bij verkoop van een wooneenheid",[33,1516,1517,1520],{},[36,1518,1519],{},"Na een inbreukverslag",": Herkeuring na het verhelpen van vastgestelde gebreken",[33,1522,1523,1526],{},[36,1524,1525],{},"Vermogensverhoging",": in de AREI-gevallen voor bepaalde oude huishoudelijke installaties",[71,1528,1529],{},[16,1530,1531,1534],{},[36,1532,1533],{},"Goed om te weten",": Zelfs als u slechts enkele nieuwe kringen toevoegt, kan een volledige herkeuring nodig zijn. Informeer vooraf altijd bij uw elektricien of keuringsorganisme.",[11,1536,1538],{"id":1537},"hoe-u-zich-voorbereidt-op-de-keuring","Hoe u zich voorbereidt op de keuring",[16,1540,1541],{},"Een goede voorbereiding maakt de installatie controleerbaar, maar garandeert geen positief resultaat. Leg onder meer klaar:",[87,1543,1545],{"id":1544},"_1-vereiste-documentatie","1. Vereiste documentatie",[16,1547,1548],{},"De keurder zal de volgende documenten opvragen:",[30,1550,1551,1556,1562],{},[33,1552,1553,1555],{},[36,1554,823],{}," — Een schematisch overzicht van alle kringen, beveiligingsapparaten en aansluitingen",[33,1557,1558,1561],{},[36,1559,1560],{},"Situatieplan"," — Toont de fysieke locatie van alle elektrische componenten",[33,1563,1564,1567],{},[36,1565,1566],{},"Technische documentatie"," die nodig is voor bijzondere apparatuur zoals PV, laadpaal of batterij",[87,1569,1571],{"id":1570},"_2-eisen-aan-de-installatie","2. Eisen aan de installatie",[16,1573,1574],{},"Zorg ervoor dat uw installatie aan deze basiseisen voldoet:",[30,1576,1577,1580,1583,1586,1589,1592,1595],{},[33,1578,1579],{},"Alle kringen zijn correct beveiligd door automatische zekeringen",[33,1581,1582],{},"Een 300mA differentieelschakelaar beschermt de volledige installatie",[33,1584,1585],{},"Extra 30mA differentieelbescherming (hoge of zeer hoge gevoeligheid) voor stopcontactkringen, verlichting, natte ruimtes (badkamer\u002Fdouche), evenals wasmachines, droogkasten en vaatwassers",[33,1587,1588],{},"Correcte aarding met een weerstand van hoogstens 30 Ohm (AREI Art. 4.2.4.3b: bij overschrijding van 30 Ω zijn bijkomende differentieelschakelaars met hoge gevoeligheid vereist; algemene formule: R_A × I∆n ≤ 50 V)",[33,1590,1591],{},"Alle kabels zijn correct bevestigd en beschermd",[33,1593,1594],{},"Aftakdozen zijn bereikbaar en correct afgesloten",[33,1596,1597],{},"Minstens twee afzonderlijke verlichtingskringen bij woningen met meer dan twee kamers (Art. 5.3.5.2b)",[87,1599,1601],{"id":1600},"_3-veelgemaakte-fouten-om-te-vermijden","3. Veelgemaakte fouten om te vermijden",[16,1603,1604],{},"Deze punten verdienen in de praktijk bijzondere aandacht; hier wordt geen onbewezen ranglijst of uitvalpercentage beweerd:",[30,1606,1607,1610,1613,1616,1619,1622],{},[33,1608,1609],{},"Ontbrekend of onjuist eendraadschema",[33,1611,1612],{},"Onvoldoende differentieelbescherming",[33,1614,1615],{},"Aardingsweerstand te hoog",[33,1617,1618],{},"Kabels niet correct bevestigd of beschermd",[33,1620,1621],{},"Ontbrekende deksels op aftakdozen",[33,1623,1624],{},"Minder dan twee afzonderlijke verlichtingskringen bij woningen met meer dan twee kamers",[11,1626,1628],{"id":1627},"wat-gebeurt-er-tijdens-de-keuring","Wat gebeurt er tijdens de keuring?",[16,1630,1631],{},"Omvang en duur hangen van installatie en controletype af. De keurder zal onder meer:",[179,1633,1634,1640,1646,1652],{},[33,1635,1636,1639],{},[36,1637,1638],{},"Documentatie controleren"," — Verifiëren of het eendraadschema en situatieplan overeenkomen met de werkelijke installatie",[33,1641,1642,1645],{},[36,1643,1644],{},"Visuele inspectie"," — Alle zichtbare componenten, kabels en verbindingen controleren",[33,1647,1648,1651],{},[36,1649,1650],{},"Metingen uitvoeren"," — Aardingsweerstand, isolatieweerstand en lusimpedantie testen",[33,1653,1654,1657],{},[36,1655,1656],{},"Functionele testen"," — Alle differentieelschakelaars en automaten testen",[16,1659,1660],{},"Na de keuring ontvangt u een schriftelijk of elektronisch verslag. Daarin staan conclusie, inbreuken en eventuele vervolgactie. De vaak genoemde 25 jaar is de gewone periodiciteit na een positieve eerste controle van een huishoudelijke installatie; het is geen universeel “groen certificaat” voor elke situatie.",[11,1662,1664],{"id":1663},"bepaal-eerst-het-soort-controle","Bepaal eerst het soort controle",[16,1666,1667,1668,1672],{},"De ",[216,1669,1671],{"href":218,"rel":1670},[220],"officiële FOD-pagina"," onderscheidt verschillende procedures. Een nieuwe installatie en een belangrijke wijziging of uitbreiding krijgen vóór ingebruikname een gelijkvormigheidscontrole. De periodieke keuring volgt de veiligheid tijdens het gebruik. Een verkoopkeuring betreft bepaalde oude huishoudelijke installaties die niet aan het relevante volledige onderzoek werden onderworpen. Een vermogensverhoging heeft eigen voorwaarden.",[16,1674,1675],{},"Dat onderscheid bepaalt termijn en scope. Bij een belangrijke uitbreiding bekijkt het organisme de werken en hun mogelijke invloed op het ongewijzigde deel. Een niet-belangrijke wijziging veroorzaakt niet noodzakelijk dezelfde controle, maar het installatiedossier moet wel worden bijgewerkt. Beschrijf de echte werken in plaats van alleen “renovatie” te vermelden.",[11,1677,1679],{"id":1678},"stem-documenten-en-uitvoering-af","Stem documenten en uitvoering af",[16,1681,1682,1683,1687],{},"De federale ",[216,1684,1686],{"href":235,"rel":1685},[220],"informatie over huishoudelijke controles"," noemt minstens eendraadschema's, situatieplannen en, indien beschikbaar, de EAN-code. Het eendraadschema beschrijft kringen, verbindingen en materiaalkenmerken. Het situatieplan lokaliseert de borden, dozen, contactdozen, lichtpunten, schakelaars, vaste machines en bronnen waarnaar het schema verwijst.",[16,1689,1690],{},"Vergelijk beide plannen systematisch met de uitvoering:",[179,1692,1693,1696,1699,1702,1705],{},[33,1694,1695],{},"stemmen kringreferenties in het bord en op beide plannen overeen?",[33,1697,1698],{},"zijn nominale waarden, polen, kabeltype en doorsnede juist genoteerd?",[33,1700,1701],{},"staan nieuwe contactdozen, verlichting, vaste toestellen en bronnen erop?",[33,1703,1704],{},"zijn verbindings- en aftakdozen terug te vinden en bereikbaar?",[33,1706,1707],{},"zijn fabrikantdocumenten voor PV, lader, batterij en bijzonder materieel beschikbaar?",[16,1709,1710],{},"Een mooie tekening volstaat niet als ze een oude toestand toont. Omgekeerd heft degelijk werk de documentatieplicht niet op. Markeer onzekerheden en los ze vóór de afspraak op.",[11,1712,1714],{"id":1713},"bereid-visueel-onderzoek-beproeving-en-meting-voor","Bereid visueel onderzoek, beproeving en meting voor",[16,1716,1717],{},"Het organisme vergelijkt documenten met de zichtbare toestand en voert de voorziene proeven en metingen uit. Verzin geen meetwaarden en kopieer ze niet uit een oud verslag. Aardingsweerstand, isolatie en werking van beveiligingstoestellen moeten aan de actuele installatie worden beoordeeld.",[16,1719,1720],{},"Zorg voor veilige toegang tot verdeelbord, aardingsonderbreker en betrokken ruimten. Labels moeten leesbaar en afdekkingen volledig zijn. Meld lokale productie, batterij, noodstroomfunctie, laadinfrastructuur en oude delen vooraf. Toestellen openen of onder spanning meten is geen voorbereidingstaak voor een leek.",[16,1722,1723],{},"Ook eenvoudige getallen hebben context nodig. Dertig ohm is geen universele goed\u002Fafkeurgrens voor elke aarding; Boek 1 koppelt aardingsweerstand, differentieelbescherming en toegelaten aanraakspanning. Kabelbescherming hangt behalve van doorsnede ook af van materiaal, plaatsingswijze, bundeling, temperatuur, lengte en beveiliging.",[11,1725,1727],{"id":1726},"volg-het-verslag-en-de-juiste-termijn","Volg het verslag en de juiste termijn",[16,1729,1730],{},"Een positief verslag legt de beoordeling op dat moment en binnen die scope vast. Het neemt onderhoudsplichten of een nieuwe controle na latere belangrijke werken niet weg. Bewaar het bij het dossier en leg latere kleine wijzigingen vast.",[16,1732,1733],{},"Behandel bij een negatief verslag elke vermelde inbreuk. Bij inbreuken tijdens de controle vóór ingebruikname mag het betrokken deel niet worden gebruikt tot herstel en nieuwe controle. Na een negatieve periodieke controle beschrijft de federale informatie een aanvullende controle door hetzelfde organisme binnen twaalf maanden. Bij de relevante verkoopkeuring van een oude woning heeft de koper doorgaans achttien maanden vanaf de authentieke akte om te herstellen en een nieuwe controle te laten uitvoeren. Verslag en controletype blijven bepalend.",[11,1735,1737],{"id":1736},"gebruik-planelec-binnen-de-werkelijke-scope","Gebruik PlanElec binnen de werkelijke scope",[11,1739,1741],{"id":1740},"vragen-bij-de-afspraak","Vragen bij de afspraak",[16,1743,1744],{},"Meld huishoudelijk of niet-huishoudelijk gebruik, het gewenste controletype, het aantal borden en bijzondere bronnen. Vraag welke stukken gedrukt of digitaal nodig zijn, welke ruimten bereikbaar moeten zijn en hoe een lopende renovatie wordt behandeld. Bevestig tarief, betaalwijze en verplaatsingsvoorwaarden rechtstreeks; tarieven van een andere aanbieder zijn niet overdraagbaar.",[16,1746,1747],{},"Vermeld bij verkoop het bouwjaar en vroegere verslagen. Beschrijf bij een belangrijke uitbreiding duidelijk oud en nieuw. Noem bij PV, batterij, noodstroom of laadpaal de bedrijfswijze en beschikbare fabrikantstukken. Zo kan het organisme de juiste controle en nodige tijd plannen zonder dat iemand het resultaat voorspelt.",[11,1749,1751],{"id":1750},"op-de-controledag","Op de controledag",[16,1753,1754],{},"Voorzie een contactpersoon die de installatie kent. Maak borden, aardingsonderbreker en betrokken ruimten veilig bereikbaar, maar verwijder geen vaste afdekkingen zonder instructie. Zorg dat opslag, gesloten deuren of huisdieren de toegang niet hinderen. Voer tijdens de controle geen spontane elektrische wijzigingen uit.",[16,1756,1757],{},"Controleer bij ontvangst van het verslag adres, controletype, onderzochte scope en documentenlijst op schrijffouten. Leg technische vragen schriftelijk voor met verwijzing naar de precieze vaststelling. Bewaar de definitieve versie samen met de voorgelegde plannen en leg latere kleine wijzigingen apart vast.",[16,1759,1760],{},"Was een ruimte of installatiedeel niet bereikbaar, beschouw dat dan niet als een detail. Lees hoe de beperking de conclusie beïnvloedt en vraag of een extra bezoek nodig is. Noteer ook welke toestellen tijdens de controle aangesloten, uitgeschakeld of niet beschikbaar waren.",[16,1762,1763],{},"Maak na de controle één gearchiveerde set met het definitieve verslag, exact de voorgelegde plannen en de bijbehorende technische fiches. Geef die set een duidelijke datum. Werk bij een latere wijziging verder op een kopie, zodat steeds aantoonbaar blijft welke documentversie bij welk verslag hoorde. Dat voorkomt verwarring bij verkoop, onderhoud of een volgende periodieke controle.",[16,1765,1766],{},"Bewaar die set gedurende de volledige gebruiksperiode.",[16,1768,1769],{},"PlanElec zet ingevoerde topologie om in eendraadschema en situatieplan, maakt PDF-documenten en signaleert ondersteunde planningsproblemen die uit de gegevens afleidbaar zijn. De zelfcontrole is geen gelijkvormigheidsattest. Ze ziet geen verborgen leidingen, voert geen metingen uit en kent niet automatisch elke fabrikantvoorwaarde of afwijking voor oude installaties.",[16,1771,1772,1773,316],{},"Gebruik het als consistente documentatiebasis: invoeren, met de uitvoering vergelijken, onzekerheden professioneel laten beoordelen en daarna exporteren. De officiële conclusie blijft bij het erkende keuringsorganisme. De ",[216,1774,1776],{"href":313,"rel":1775},[220],"FOD Economie publiceert de lijst",[11,1778,1780],{"id":1779},"leg-de-gekeurde-scope-na-het-bezoek-vast","Leg de gekeurde scope na het bezoek vast",[16,1782,1783],{},"Noteer welke borden, ruimten, energiebronnen en bedrijfsmodi toegankelijk waren en werkelijk in de keuring zaten. Vergelijk die begrenzing met de omschrijving in het verslag. Een positief verslag voor een duidelijk afgebakend installatiedeel beoordeelt geen latere uitbreidingen of niet onderzochte delen. Wijzigen na het bezoek vaste leidingen, beveiligingstoestellen, PV-, batterij- of laadfuncties, werk dan plannen en installatiedossier bij en bepaal welke nieuwe controle nodig is. Bewaar de exact voorgelegde planversie ongewijzigd bij het verslag; maak voor latere werken een nieuw gedateerde versie. Zo blijft aantoonbaar welke uitvoeringsstand het keuringsorganisme werkelijk heeft beoordeeld.",[11,1785,1787],{"id":1786},"hoe-planelec-helpt","Hoe PlanElec helpt",[16,1789,1790,1791,1793],{},"Het opstellen van de vereiste documentatie is vaak het meest tijdrovende onderdeel van de voorbereiding op een elektrische keuring. ",[36,1792,333],{}," vereenvoudigt dit proces aanzienlijk:",[30,1795,1796,1802,1808,1814,1820],{},[33,1797,1798,1801],{},[36,1799,1800],{},"Gestructureerde eendraadschema's maken"," uit de ingevoerde kringen",[33,1803,1804,1807],{},[36,1805,1806],{},"Belgische symbolenbibliotheek"," voor ondersteunde planweergaven",[33,1809,1810,1813],{},[36,1811,1812],{},"Situatieplannen"," op basis van de ingevoerde plattegrond",[33,1815,1816,1819],{},[36,1817,1818],{},"Exporteren naar PDF"," voor eenvoudige indiening bij de keurder",[33,1821,1822,1825],{},[36,1823,1824],{},"Meertalige ondersteuning"," — Documentatie in het Nederlands, Frans, Duits of Engels",[71,1827,1828],{},[16,1829,1830],{},"Vergelijk de export met de uitvoering en laat ontwerp, metingen en open technische vragen professioneel beoordelen.",[16,1832,1833],{},[216,1834,1835],{"href":376},"Begin nu gratis met uw elektrische documentatie →",{"title":379,"searchDepth":380,"depth":380,"links":1837},[1838,1839,1840,1845,1846,1847,1848,1849,1850,1851,1852,1853,1854],{"id":1474,"depth":380,"text":1475},{"id":1484,"depth":380,"text":1485},{"id":1537,"depth":380,"text":1538,"children":1841},[1842,1843,1844],{"id":1544,"depth":387,"text":1545},{"id":1570,"depth":387,"text":1571},{"id":1600,"depth":387,"text":1601},{"id":1627,"depth":380,"text":1628},{"id":1663,"depth":380,"text":1664},{"id":1678,"depth":380,"text":1679},{"id":1713,"depth":380,"text":1714},{"id":1726,"depth":380,"text":1727},{"id":1736,"depth":380,"text":1737},{"id":1740,"depth":380,"text":1741},{"id":1750,"depth":380,"text":1751},{"id":1779,"depth":380,"text":1780},{"id":1786,"depth":380,"text":1787},"Alles wat u moet weten over de elektrische keuring — van voorbereiding tot het uiteindelijke onderzoek.","nl",{},"\u002Fblog\u002Felectrical-inspection.nl",{"title":1469,"description":1855},"elektrische-keuring","blog\u002Felectrical-inspection.nl",[414,415,417,1863,420,1864,1865,1866,1867,1868,1869,421,422,425,424],"elektrische keuring","situatieschema","conformiteitsverklaring","differentieel","aarding","elektricien","België","iV01hVSEQdP3Q6Iclx4ta8KqGaVo07j7KBpJYaJWiUQ",1788389264962]