[{"data":1,"prerenderedAt":4212},["ShallowReactive",2],{"blog-post-nl-oud-arei-part-8":3,"blog-alternates-old-building-arei-part8":943},{"id":4,"title":5,"articleId":6,"body":7,"category":920,"date":921,"description":922,"extension":923,"lastUpdated":924,"locale":925,"meta":926,"navigation":927,"path":928,"publishDate":921,"readTime":929,"refreshInterval":930,"seo":931,"slug":932,"stem":933,"tags":934,"__hash__":942},"blog\u002Fblog\u002Fold-building-arei-part8.nl.md","Oudere installaties en AREI Part 8: Bijzondere regels voor bestaande installaties","old-building-arei-part8",{"type":8,"value":9,"toc":876},"minimark",[10,19,22,27,34,45,54,56,60,67,72,75,79,86,90,118,126,128,132,135,139,183,187,223,235,239,242,272,276,283,287,308,312,315,317,321,328,332,426,430,433,459,461,465,469,476,480,487,499,503,573,588,590,594,601,605,612,634,638,656,658,662,669,673,687,691,702,706,717,721,724,726,730,784,786,790,817,819,833,837,840,843,846,856,859,863,866,870,873],[11,12,13,14,18],"p",{},"Niet elke elektrische installatie in België moet aan de nieuwste AREI-voorschriften voldoen. Voor oudere gebouwen bestaat er met ",[15,16,17],"strong",{},"Part 8 (Partie 8)"," een apart regelwerk dat bepaalde afwijkingen van de huidige standaard tolereert — zolang er geen onmiddellijk gevaar bestaat. Dit artikel legt uit wanneer Part 8 geldt, wat toegelaten is en waar de grenzen liggen.",[20,21],"hr",{},[23,24,26],"h2",{"id":25},"wat-is-part-8","Wat is Part 8?",[11,28,29,30,33],{},"Part 8 van het AREI (Algemeen Reglement op de Elektrische Installaties) is een ",[15,31,32],{},"bijzondere regeling voor bestaande installaties"," die vóór de inwerkingtreding van het huidige AREI werden aangelegd en gekeurd.",[11,35,36,37,40,41,44],{},"Het basisprincipe: zolang een installatie ",[15,38,39],{},"veilig"," functioneert en ",[15,42,43],{},"geen onmiddellijk gevaar"," vormt, hoeft ze niet volledig op de nieuwste stand gebracht te worden — ook al voldoet ze niet aan alle huidige voorschriften.",[46,47,48],"blockquote",{},[11,49,50,53],{},[15,51,52],{},"Belangrijk:"," Part 8 is geen vrijbrief. Het definieert duidelijk welke afwijkingen getolereerd worden en welke niet.",[20,55],{},[23,57,59],{"id":58},"wanneer-geldt-part-8","Wanneer geldt Part 8?",[11,61,62,63,66],{},"Part 8 geldt voor installaties die aan ",[15,64,65],{},"één"," van de volgende voorwaarden voldoen:",[68,69,71],"h3",{"id":70},"voorwaarde-1-installatie-vóór-01101981","Voorwaarde 1: Installatie vóór 01.10.1981",[11,73,74],{},"Installaties die vóór 1 oktober 1981 werden aangelegd (datum van inwerkingtreding van het oorspronkelijke AREI) vallen in principe onder Part 8.",[68,76,78],{"id":77},"voorwaarde-2-onder-het-oude-arei-gekeurd","Voorwaarde 2: Onder het oude AREI gekeurd",[11,80,81,82,85],{},"Installaties die onder een eerdere versie van het AREI werden gekeurd en sindsdien ",[15,83,84],{},"niet wezenlijk gewijzigd"," zijn.",[68,87,89],{"id":88},"wat-telt-als-wezenlijke-wijziging","Wat telt als \"wezenlijke wijziging\"?",[91,92,93,100,106,112],"ul",{},[94,95,96,97],"li",{},"Toevoegen van ",[15,98,99],{},"nieuwe kringen",[94,101,102,103],{},"Uitbreiding van de ",[15,104,105],{},"verdeelkast",[94,107,108,109],{},"Wijziging van de ",[15,110,111],{},"meterinstallatie",[94,113,114,115],{},"Omvangrijke ",[15,116,117],{},"herbekabeling",[46,119,120],{},[11,121,122,125],{},[15,123,124],{},"Let op:"," Kleine wijzigingen zoals het vervangen van een stopcontact of schakelaar gelden NIET als wezenlijke wijziging.",[20,127],{},[23,129,131],{"id":130},"wat-is-onder-part-8-toegelaten-getolereerde-afwijkingen","Wat is onder Part 8 toegelaten? (Getolereerde afwijkingen)",[11,133,134],{},"De volgende punten wijken af van het huidige AREI, maar worden onder Part 8 bij de keuring getolereerd:",[68,136,138],{"id":137},"_1-oude-kabeltypes","1. Oude kabeltypes",[140,141,142,155],"table",{},[143,144,145],"thead",{},[146,147,148,152],"tr",{},[149,150,151],"th",{},"Huidig AREI",[149,153,154],{},"Part 8 tolereert",[156,157,158,167,175],"tbody",{},[146,159,160,164],{},[161,162,163],"td",{},"XVB \u002F VOBst in Preflex",[161,165,166],{},"VOB-kabels in oude leidingen",[146,168,169,172],{},[161,170,171],{},"Cca-brandveiligheidsklasse",[161,173,174],{},"Oudere kabeltypes zonder CPR-classificatie",[146,176,177,180],{},[161,178,179],{},"Minimale doorsnede 2,5 mm² voor stopcontacten",[161,181,182],{},"Minimaal 1 mm² bij max. 6 A zekering of 10 A automaat (Art. 8.2.1 Nr. 5)",[68,184,186],{"id":185},"_2-aardlekschakelaars-rcd-differentieelschakelaar","2. Aardlekschakelaars (RCD \u002F Differentieelschakelaar)",[140,188,189,197],{},[143,190,191],{},[146,192,193,195],{},[149,194,151],{},[149,196,154],{},[156,198,199,207,215],{},[146,200,201,204],{},[161,202,203],{},"30 mA RCD per stopcontactkring",[161,205,206],{},"Geen 30 mA RCD nodig (alleen 300 mA hoofd-RCD)",[146,208,209,212],{},[161,210,211],{},"30 mA RCD voor badkamer verplicht",[161,213,214],{},"Blijft verplicht (niet gedekt door de Part 8-afwijking, Art. 4.2.4.3 b nr. 3 \u002F Art. 7.1.4.3)",[146,216,217,220],{},[161,218,219],{},"Max. 8 kringen per RCD",[161,221,222],{},"Meer kringen toegelaten",[46,224,225],{},[11,226,227,230,231,234],{},[15,228,229],{},"Opmerking:"," Ook onder Part 8 wordt een ",[15,232,233],{},"300 mA hoofd-RCD"," aanbevolen en bij nieuwe meterinstallatie vaak door de netbeheerder vereist.",[68,236,238],{"id":237},"_3-stopcontacten-zonder-aardingcontact","3. Stopcontacten zonder aardingcontact",[11,240,241],{},"Oude stopcontacten (type C, zonder aardpen) worden onder Part 8 getolereerd, op voorwaarde dat:",[91,243,244,251,258,269],{},[94,245,246,247,250],{},"Het stopcontact beschermd wordt door een ",[15,248,249],{},"differentieelschakelaar met hoge of zeer hoge gevoeligheid"," (max. 30 mA) (Art. 8.2.1 nr. 6 letter b).",[94,252,253,254,257],{},"Geen toestellen van ",[15,255,256],{},"beschermingsklasse I"," (met metalen behuizing) worden aangesloten.",[94,259,260,261,264,265,268],{},"Het stopcontact niet in de ",[15,262,263],{},"badkamer"," of op ",[15,266,267],{},"vochtige plaatsen"," zit.",[94,270,271],{},"De kring verder intact is.",[68,273,275],{"id":274},"_4-geen-spd-overspanningsbeveiliging","4. Geen SPD (overspanningsbeveiliging)",[11,277,278,279,282],{},"Het huidige AREI schrijft voor nieuwe installaties een SPD (Surge Protection Device) Type 2 voor. Onder Part 8 is dit ",[15,280,281],{},"niet vereist",".",[68,284,286],{"id":285},"_5-oude-verdeeltechniek","5. Oude verdeeltechniek",[91,288,289,295,301],{},[94,290,291,294],{},[15,292,293],{},"Smeltzekeringen"," in plaats van MCBs zijn toegelaten.",[94,296,297,300],{},[15,298,299],{},"Schroefzekeringen"," (Diazed) worden getolereerd.",[94,302,303,304,307],{},"Ontbrekende ",[15,305,306],{},"opschriften"," worden als gebrek vermeld, maar leiden niet tot afkeuring.",[68,309,311],{"id":310},"_6-geen-brandveiligheidsclassificatie-van-kabels","6. Geen brandveiligheidsclassificatie van kabels",[11,313,314],{},"Kabels zonder CPR-classificatie (vóór 2017 geïnstalleerd) worden getolereerd, aangezien de CPR-verordening pas vanaf juli 2017 voor nieuwe installaties geldt.",[20,316],{},[23,318,320],{"id":319},"wat-is-niet-toegelaten-ook-onder-part-8","Wat is NIET toegelaten (ook onder Part 8)?",[11,322,323,324,327],{},"Bepaalde toestanden worden ",[15,325,326],{},"nooit getolereerd",", ongeacht de ouderdom van de installatie:",[68,329,331],{"id":330},"absoluut-ongeoorloofd","Absoluut ongeoorloofd:",[140,333,334,344],{},[143,335,336],{},[146,337,338,341],{},[149,339,340],{},"Toestand",[149,342,343],{},"Waarom?",[156,345,346,356,366,376,386,396,406,416],{},[146,347,348,353],{},[161,349,350],{},[15,351,352],{},"Blote of beschadigde kabels",[161,354,355],{},"Onmiddellijk elektrocutiegevaar",[146,357,358,363],{},[161,359,360],{},[15,361,362],{},"Volledig ontbrekende aarding",[161,364,365],{},"Geen bescherming bij isolatiefout",[146,367,368,373],{},[161,369,370],{},[15,371,372],{},"Water in contact met elektriciteit",[161,374,375],{},"Levensgevaar",[146,377,378,383],{},[161,379,380],{},[15,381,382],{},"Toegankelijke spanningvoerende delen",[161,384,385],{},"Direct aanrakingsrisico",[146,387,388,393],{},[161,389,390],{},[15,391,392],{},"Oververhitte kabels of verbindingen",[161,394,395],{},"Brandgevaar",[146,397,398,403],{},[161,399,400],{},[15,401,402],{},"Losse verbindingen in aftakdozen",[161,404,405],{},"Vlamboog-\u002Fbrandgevaar",[146,407,408,413],{},[161,409,410],{},[15,411,412],{},"Aftakdozen zonder deksel",[161,414,415],{},"Aanrakingsbescherming ontbreekt",[146,417,418,423],{},[161,419,420],{},[15,421,422],{},"Badkamer-stopcontact in zone 0 of 1",[161,424,425],{},"Levensgevaar, ook onder Part 8 verboden",[68,427,429],{"id":428},"veiligheidsgerelateerde-minimumvereisten","Veiligheidsgerelateerde minimumvereisten:",[11,431,432],{},"Ook onder Part 8 moet gewaarborgd zijn:",[91,434,435,441,447,453],{},[94,436,437,440],{},[15,438,439],{},"Voldoende doorsnede"," voor de werkelijke belasting (geen overbelast 0,75 mm²-kabel).",[94,442,443,446],{},[15,444,445],{},"Werkende zekeringen"," (geen \"overbrugde\" zekeringen).",[94,448,449,452],{},[15,450,451],{},"Aarding van de hoofdverdeler"," (verbinding met aardingselektrode).",[94,454,455,458],{},[15,456,457],{},"Toegankelijkheid"," van de verdeelkast.",[20,460],{},[23,462,464],{"id":463},"periodieke-keuring","Periodieke keuring",[68,466,468],{"id":467},"elke-25-jaar-verplicht","Elke 25 jaar verplicht",[11,470,471,472,475],{},"Bestaande installaties onder Part 8 moeten elke ",[15,473,474],{},"25 jaar"," een periodieke keuring ondergaan door een erkend controleorganisme.",[68,477,479],{"id":478},"bij-eigendomsoverdracht","Bij eigendomsoverdracht",[11,481,482,483,486],{},"Bij ",[15,484,485],{},"verkoop van een woning"," is een geldig keuringsattest (minder dan 25 jaar oud) verplicht. Ontbreekt dit, dan moet vóór de verkoop een keuring plaatsvinden.",[46,488,489],{},[11,490,491,494,495,498],{},[15,492,493],{},"18-maandentermijn (Art. 8.4.2.2):"," Bij aankoop van een woning met een negatief keuringsverslag heeft de koper ",[15,496,497],{},"18 maanden"," vanaf de aankoopdatum om de gebreken te verhelpen en een herkeuring te laten uitvoeren.",[68,500,502],{"id":501},"wat-wordt-bij-de-periodieke-keuring-gecontroleerd","Wat wordt bij de periodieke keuring gecontroleerd?",[140,504,505,515],{},[143,506,507],{},[146,508,509,512],{},[149,510,511],{},"Controlepunt",[149,513,514],{},"Beoordeling",[156,516,517,525,533,541,549,557,565],{},[146,518,519,522],{},[161,520,521],{},"Visuele inspectie kabels en verbindingen",[161,523,524],{},"Beschadiging, oververhitting",[146,526,527,530],{},[161,528,529],{},"Aardingsweerstand meten",[161,531,532],{},"≤ 30 Ω (reglementaire drempel conform Art. 4.2.4.3b; daarboven bijkomende beschermingsmaatregelen nodig)",[146,534,535,538],{},[161,536,537],{},"Isolatieweerstand meten",[161,539,540],{},"> 0,5 MΩ",[146,542,543,546],{},[161,544,545],{},"RCD-test (indien aanwezig)",[161,547,548],{},"Uitschakeltijd en -stroom",[146,550,551,554],{},[161,552,553],{},"Kortsluitbeveiliging controleren",[161,555,556],{},"Zekeringen \u002F MCBs aanwezig",[146,558,559,562],{},[161,560,561],{},"Bescherming tegen direct aanraken",[161,563,564],{},"Afdekkingen, IP-bescherming",[146,566,567,570],{},[161,568,569],{},"Documentatie",[161,571,572],{},"Éénlijnschema + situatieschema aanwezig?",[46,574,575],{},[11,576,577,579,580,583,584,587],{},[15,578,229],{}," Ook onder Part 8 moeten een ",[15,581,582],{},"éénlijnschema"," en een ",[15,585,586],{},"situatieschema"," aanwezig zijn — ook als deze achteraf moeten worden opgesteld.",[20,589],{},[23,591,593],{"id":592},"de-besmettingsregel-bij-gedeeltelijke-renovatie","De besmettingsregel bij gedeeltelijke renovatie",[11,595,596,597,600],{},"Een bijzonder belangrijk aspect bij oudere gebouwen: de zogenaamde ",[15,598,599],{},"besmettingsregel"," (contamination rule).",[68,602,604],{"id":603},"hoe-werkt-het","Hoe werkt het?",[11,606,607,608,611],{},"Wanneer u een deel van uw installatie ",[15,609,610],{},"wezenlijk wijzigt"," (bijv. nieuwe kringen toevoegen), geldt:",[613,614,615,622,628],"ol",{},[94,616,617,618,621],{},"Het ",[15,619,620],{},"nieuwe deel"," moet volledig voldoen aan het huidige AREI.",[94,623,617,624,627],{},[15,625,626],{},"bestaande deel"," wordt verder beoordeeld volgens Part 8.",[94,629,630,633],{},[15,631,632],{},"MAAR:"," Als het nieuwe deel het bestaande deel \"besmet\" (bijv. nieuwe kabels in dezelfde verdeelkast), kan de controleur beslissen dat de hele verdeelkast aan het huidige AREI moet voldoen.",[68,635,637],{"id":636},"praktische-gevolgen","Praktische gevolgen:",[91,639,640,646,653],{},[94,641,642,643,85],{},"Plan renovaties zo dat nieuwe en oude delen ",[15,644,645],{},"duidelijk gescheiden",[94,647,648,649,652],{},"Idealiter een ",[15,650,651],{},"aparte onderverdeler"," voor nieuwe kringen.",[94,654,655],{},"Documenteer precies wat oud en wat nieuw is.",[20,657],{},[23,659,661],{"id":660},"aanbeveling-stapsgewijze-modernisering","Aanbeveling: Stapsgewijze modernisering",[11,663,664,665,668],{},"Hoewel Part 8 afwijkingen tolereert, is een ",[15,666,667],{},"stapsgewijze modernisering"," aan te raden:",[68,670,672],{"id":671},"prioriteit-1-veiligheidskritisch","Prioriteit 1 (Veiligheidskritisch)",[91,674,675,678,681,684],{},[94,676,677],{},"300 mA hoofd-RCD bijplaatsen (indien niet aanwezig)",[94,679,680],{},"Beschadigde kabels vervangen",[94,682,683],{},"Losse verbindingen herstellen",[94,685,686],{},"Aarding controleren en eventueel verbeteren",[68,688,690],{"id":689},"prioriteit-2-aanbevolen","Prioriteit 2 (Aanbevolen)",[91,692,693,696,699],{},[94,694,695],{},"30 mA groeps-RCDs voor badkamer en keuken",[94,697,698],{},"Oude smeltzekeringen vervangen door MCBs",[94,700,701],{},"SPD Type 2 bijplaatsen",[68,703,705],{"id":704},"prioriteit-3-comfort-toekomstbestendigheid","Prioriteit 3 (Comfort + toekomstbestendigheid)",[91,707,708,711,714],{},[94,709,710],{},"Verdeelkast moderniseren (meer rijen, opschriften)",[94,712,713],{},"Stopcontacten met aarding bijplaatsen",[94,715,716],{},"Voorbereiding voor laadpaal \u002F zonnepanelen",[68,718,720],{"id":719},"werk-afbakenen-vóór-een-prijsaanvraag","Werk afbakenen vóór een prijsaanvraag",[11,722,723],{},"Gebruik geen algemene online prijsvork als budget. Laat de werkelijke installatie opnemen en vraag een gedateerde offerte waarin veiligheidsherstel en vrijwillige modernisering apart staan.",[20,725],{},[23,727,729],{"id":728},"samenvatting","Samenvatting",[140,731,732,742],{},[143,733,734],{},[146,735,736,739],{},[149,737,738],{},"Vraag",[149,740,741],{},"Antwoord",[156,743,744,752,760,768,776],{},[146,745,746,749],{},[161,747,748],{},"Moet mijn oud gebouw aan het huidige AREI voldoen?",[161,750,751],{},"Niet volledig, Part 8 staat afwijkingen toe",[146,753,754,757],{},[161,755,756],{},"Heb ik een 30 mA RCD nodig?",[161,758,759],{},"Onder Part 8 niet verplicht, maar sterk aanbevolen",[146,761,762,765],{},[161,763,764],{},"Zijn oude stopcontacten zonder aarding toegelaten?",[161,766,767],{},"Onder voorwaarden ja (geen badkamer, geen klasse-I-toestellen)",[146,769,770,773],{},[161,771,772],{},"Hoe vaak moet er gekeurd worden?",[161,774,775],{},"Afhankelijk van historiek en aanleiding; verkoop is casusgebonden",[146,777,778,781],{},[161,779,780],{},"Wat bij gedeeltelijke renovatie?",[161,782,783],{},"Nieuw deel = huidig AREI, oud deel = Part 8 (scope volgens het reglement bepalen)",[20,785],{},[23,787,789],{"id":788},"gerelateerde-artikelen","Gerelateerde artikelen",[91,791,792,799,805,811],{},[94,793,794],{},[795,796,798],"a",{"href":797},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België: Wat wordt gecontroleerd?",[94,800,801],{},[795,802,804],{"href":803},"\u002Fblog\u002Farei-2026-wijzigingen","Wat verandert er met het AREI 2026?",[94,806,807],{},[795,808,810],{"href":809},"\u002Fblog\u002Fpreflex-vs-vrije-bedrading","Preflex vs. vrije bedrading",[94,812,813],{},[795,814,816],{"href":815},"\u002Fblog\u002Fverdeelkast-plannen-opbouw","Verdeelkast plannen",[20,818],{},[11,820,821],{},[822,823,824,825,828,829],"em",{},"Ook voor oudere gebouwen helpt ",[15,826,827],{},"PlanElec"," om éénlijnschema en situatieschema digitaal op te bouwen. De zelfcontrole is indicatief; laat de documenten en toepasselijke afwijkingen professioneel beoordelen. ",[795,830,832],{"href":831},"\u002F","Gratis starten →",[23,834,836],{"id":835},"bepaal-de-installatiehistoriek-vóór-een-afwijking","Bepaal de installatiehistoriek vóór een afwijking",[11,838,839],{},"De bouwdatum volstaat niet. Maak een tijdlijn met eerdere keuringsverslagen, bordlabels, facturen, vergunningen en zichtbare uitvoering. Bepaal welke delen vóór 1 oktober 1981 bestonden, wat later belangrijk gewijzigd of uitgebreid werd en of die werken een conformiteitscontrole kregen. Deel 8 definieert oude installaties en concrete afwijkingen; niet elk onderdeel in een oud huis is daardoor vrijgesteld.",[11,841,842],{},"Markeer oude en nieuwe delen op een werkkopie van het eendraadschema. Noteer per ingeroepen afwijking de precieze V06-bepaling, betrokken kring, bewijs van ouderdom en resterende veiligheidsvoorwaarden. Ontbreekt bewijs, schrijf dan onbekend; kabelkleur of uitzicht dateert de aanleg niet betrouwbaar. Het erkende controleorganisme beoordeelt de toepasbaarheid.",[11,844,845],{},"Gebruik de informele “besmettingsregel” niet alsof het een AREI-artikel is. Een belangrijke wijziging of uitbreiding wordt volgens de actuele toepasselijke voorschriften beoordeeld; de status van bestaande delen hangt af van definities, scope en controlehistoriek. Een gedeeld bord of gedeelde bescherming maakt de grens belangrijk, maar de omvang volgt uit reglement en project, niet uit een slogan. Bespreek ze vóór de werken.",[11,847,848,849,855],{},"Volg bij verkoop de ",[795,850,854],{"href":851,"rel":852},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fthemas\u002Fenergie\u002Fbronnen-en-dragers-van-energie\u002Felektriciteit\u002Fveiligheid-en-controle-van\u002Fboek-1-van-het-algemeen",[853],"nofollow","FOD Economie-FAQ",". Ze onderscheidt verkopersplichten, mededeling door koper en het traject van 18 maanden na een negatief verkoopverslag. Dat is niet hetzelfde als de termijn van 12 maanden bij andere negatieve controles. Datum van authentieke akte en verslagtype zijn bepalend.",[11,857,858],{},"Het overdrachtdossier bevat actuele schema's, verslagen, verklaringen, instructies en wijzigingen. PlanElec helpt referenties gelijk te houden, maar beslist niet of een afwijking geldt en dekt niet elk Deel 8-geval. Nagekeken op 29 augustus 2026 tegen Boek 1 V06 en de FOD-pagina van 1 april 2026.",[68,860,862],{"id":861},"opname-ter-plaatse-zonder-voorbarige-conclusie","Opname ter plaatse zonder voorbarige conclusie",[11,864,865],{},"Fotografeer en label borden, beveiligingen, differentiëlen, aardverbindingen, zichtbare leidingen en aftakdozen zonder delen onder spanning te openen. Teken elke geïdentificeerde kring eerst als bestaande toestand. Onbekende oorsprong, doorsnede of onleesbare waarde blijft uitdrukkelijk onbekend. Daarna scheidt de vakpersoon onmiddellijke veiligheidswerken, controleplichtige wijzigingen en vrijwillige modernisering. Zo doet een nette nieuwe tekening niet alsof een onvolledig onderzocht oud deel volgens een huidig nieuwbouwontwerp werd uitgevoerd.",[68,867,869],{"id":868},"beslissingslijst","Beslissingslijst",[11,871,872],{},"Noteer per afwijking of ze behouden, veiliger gemaakt of tijdens de werken volledig vernieuwd wordt. Koppel de beslissing aan bepaling, vaststelling en verantwoordelijke. Archiveer na afloop oude markeringen, nieuwe kringreferenties en keuringsverslag samen.",[11,874,875],{},"Gebruik de uiteindelijke keuringsbevindingen om de schema’s bij te werken; bewaar ook de vorige toestand zodat de oorsprong van wijzigingen traceerbaar blijft.",{"title":877,"searchDepth":878,"depth":878,"links":879},"",2,[880,881,887,895,899,904,908,914,915,916],{"id":25,"depth":878,"text":26},{"id":58,"depth":878,"text":59,"children":882},[883,885,886],{"id":70,"depth":884,"text":71},3,{"id":77,"depth":884,"text":78},{"id":88,"depth":884,"text":89},{"id":130,"depth":878,"text":131,"children":888},[889,890,891,892,893,894],{"id":137,"depth":884,"text":138},{"id":185,"depth":884,"text":186},{"id":237,"depth":884,"text":238},{"id":274,"depth":884,"text":275},{"id":285,"depth":884,"text":286},{"id":310,"depth":884,"text":311},{"id":319,"depth":878,"text":320,"children":896},[897,898],{"id":330,"depth":884,"text":331},{"id":428,"depth":884,"text":429},{"id":463,"depth":878,"text":464,"children":900},[901,902,903],{"id":467,"depth":884,"text":468},{"id":478,"depth":884,"text":479},{"id":501,"depth":884,"text":502},{"id":592,"depth":878,"text":593,"children":905},[906,907],{"id":603,"depth":884,"text":604},{"id":636,"depth":884,"text":637},{"id":660,"depth":878,"text":661,"children":909},[910,911,912,913],{"id":671,"depth":884,"text":672},{"id":689,"depth":884,"text":690},{"id":704,"depth":884,"text":705},{"id":719,"depth":884,"text":720},{"id":728,"depth":878,"text":729},{"id":788,"depth":878,"text":789},{"id":835,"depth":878,"text":836,"children":917},[918,919],{"id":861,"depth":884,"text":862},{"id":868,"depth":884,"text":869},"guide","2026-04-14","Wat geldt voor oudere elektrische installaties in België. AREI Part 8 uitgelegd: toegelaten afwijkingen, periodieke keuring en tips voor stapsgewijze modernisering.","md","2026-08-29","nl",{},true,"\u002Fblog\u002Fold-building-arei-part8.nl","8 min",12,{"title":5,"description":922},"oud-arei-part-8","blog\u002Fold-building-arei-part8.nl",[935,936,937,938,939,940,941],"oudere installatie","AREI","Part 8","bestaande installatie","renovatie","keuring","periodiek","yY4x4UWP0MNgw4_L54A5bTjESJsT5_vgxvn5rmhPsVs",[944,1837,2710,3584],{"id":945,"title":946,"articleId":6,"body":947,"category":920,"date":921,"description":1823,"extension":923,"lastUpdated":924,"locale":1824,"meta":1825,"navigation":927,"path":1826,"publishDate":921,"readTime":929,"refreshInterval":930,"seo":1827,"slug":1828,"stem":1829,"tags":1830,"__hash__":1836},"blog\u002Fblog\u002Fold-building-arei-part8.de.md","Altbau und AREI Part 8: Sonderregeln für bestehende Installationen",{"type":8,"value":948,"toc":1782},[949,955,957,961,968,979,987,989,993,1000,1004,1007,1011,1018,1022,1048,1056,1058,1062,1065,1069,1106,1110,1146,1158,1162,1165,1195,1199,1205,1209,1230,1234,1237,1239,1243,1250,1254,1348,1352,1355,1381,1383,1387,1391,1394,1398,1405,1417,1421,1490,1505,1507,1511,1517,1521,1528,1549,1553,1572,1574,1578,1585,1589,1603,1607,1618,1622,1633,1637,1640,1644,1698,1700,1704,1730,1732,1743,1747,1750,1753,1756,1765,1768,1772,1775,1779],[11,950,951,952,954],{},"Nicht jede Elektroinstallation in Belgien muss den neuesten AREI-Vorschriften entsprechen. Für ältere Gebäude gibt es mit ",[15,953,17],{}," ein eigenes Regelwerk, das bestimmte Abweichungen vom aktuellen Standard toleriert — solange keine unmittelbare Gefahr besteht. Dieser Artikel erklärt, wann Part 8 gilt, was erlaubt ist und wo die Grenzen liegen.",[20,956],{},[23,958,960],{"id":959},"was-ist-part-8","Was ist Part 8?",[11,962,963,964,967],{},"Part 8 des AREI (Allgemeines Reglement über die Elektrischen Installationen \u002F Règlement Général sur les Installations Électriques) ist eine ",[15,965,966],{},"Sonderregelung für bestehende Installationen",", die vor Inkrafttreten des aktuellen AREI errichtet und abgenommen wurden.",[11,969,970,971,974,975,978],{},"Das Grundprinzip: Solange eine Installation ",[15,972,973],{},"sicher"," funktioniert und ",[15,976,977],{},"keine unmittelbare Gefahr"," darstellt, muss sie nicht vollständig auf den neuesten Stand gebracht werden — auch wenn sie nicht allen aktuellen Vorschriften entspricht.",[46,980,981],{},[11,982,983,986],{},[15,984,985],{},"Wichtig:"," Part 8 ist kein Freibrief. Es definiert klar, welche Abweichungen toleriert werden und welche nicht.",[20,988],{},[23,990,992],{"id":991},"wann-gilt-part-8","Wann gilt Part 8?",[11,994,995,996,999],{},"Part 8 gilt für Installationen, die ",[15,997,998],{},"eine"," der folgenden Bedingungen erfüllen:",[68,1001,1003],{"id":1002},"bedingung-1-installation-vor-dem-01101981","Bedingung 1: Installation vor dem 01.10.1981",[11,1005,1006],{},"Installationen, die vor dem 1. Oktober 1981 errichtet wurden (Datum des Inkrafttretens des ursprünglichen AREI), fallen grundsätzlich unter Part 8.",[68,1008,1010],{"id":1009},"bedingung-2-unter-dem-alten-arei-abgenommen","Bedingung 2: Unter dem alten AREI abgenommen",[11,1012,1013,1014,1017],{},"Installationen, die unter einer früheren Version des AREI abgenommen wurden und seit der letzten Abnahme ",[15,1015,1016],{},"nicht wesentlich verändert"," wurden.",[68,1019,1021],{"id":1020},"was-zählt-als-wesentliche-änderung","Was zählt als „wesentliche Änderung\"?",[91,1023,1024,1030,1036,1042],{},[94,1025,1026,1027],{},"Hinzufügen ",[15,1028,1029],{},"neuer Stromkreise",[94,1031,1032,1033],{},"Erweiterung des ",[15,1034,1035],{},"Verteilerkastens",[94,1037,1038,1039],{},"Änderung der ",[15,1040,1041],{},"Zähleranlage",[94,1043,1044,1045],{},"Umfangreiche ",[15,1046,1047],{},"Umverdrahtung",[46,1049,1050],{},[11,1051,1052,1055],{},[15,1053,1054],{},"Achtung:"," Kleine Änderungen wie der Austausch einer Steckdose oder eines Schalters gelten NICHT als wesentliche Änderung.",[20,1057],{},[23,1059,1061],{"id":1060},"was-ist-unter-part-8-erlaubt-tolerierte-abweichungen","Was ist unter Part 8 erlaubt? (Tolerierte Abweichungen)",[11,1063,1064],{},"Die folgenden Punkte weichen vom aktuellen AREI ab, werden aber unter Part 8 bei der Kontrolle toleriert:",[68,1066,1068],{"id":1067},"_1-alte-kabeltypen","1. Alte Kabeltypen",[140,1070,1071,1081],{},[143,1072,1073],{},[146,1074,1075,1078],{},[149,1076,1077],{},"Aktuelles AREI",[149,1079,1080],{},"Part 8 toleriert",[156,1082,1083,1090,1098],{},[146,1084,1085,1087],{},[161,1086,163],{},[161,1088,1089],{},"VOB-Kabel in alten Leerrohren",[146,1091,1092,1095],{},[161,1093,1094],{},"Cca-Brandschutzklasse",[161,1096,1097],{},"Ältere Kabeltypen ohne CPR-Klassifizierung",[146,1099,1100,1103],{},[161,1101,1102],{},"Mindestquerschnitt 2,5 mm² für Steckdosen",[161,1104,1105],{},"Mindestens 1 mm² bei Absicherung mit max. 6 A Sicherung oder 10 A Leitungsschutzschalter",[68,1107,1109],{"id":1108},"_2-fehlerstromschutzschalter-rcd-differenzialschalter","2. Fehlerstromschutzschalter (RCD \u002F Differenzialschalter)",[140,1111,1112,1120],{},[143,1113,1114],{},[146,1115,1116,1118],{},[149,1117,1077],{},[149,1119,1080],{},[156,1121,1122,1130,1138],{},[146,1123,1124,1127],{},[161,1125,1126],{},"30 mA RCD pro Steckdosenkreis",[161,1128,1129],{},"Kein 30 mA RCD nötig (nur 300 mA Haupt-RCD)",[146,1131,1132,1135],{},[161,1133,1134],{},"30 mA RCD für Badezimmer Pflicht",[161,1136,1137],{},"Bleibt Pflicht (nicht von der Part-8-Abweichung erfasst, Art. 4.2.4.3 b Nr. 3 \u002F Art. 7.1.4.3)",[146,1139,1140,1143],{},[161,1141,1142],{},"Max. 8 Kreise pro RCD",[161,1144,1145],{},"Mehr Kreise erlaubt",[46,1147,1148],{},[11,1149,1150,1153,1154,1157],{},[15,1151,1152],{},"Hinweis:"," Auch unter Part 8 wird ein ",[15,1155,1156],{},"300 mA Haupt-RCD"," empfohlen und bei Neuinstallation des Zählers oft vom Netzbetreiber vorausgesetzt.",[68,1159,1161],{"id":1160},"_3-steckdosen-ohne-erdungskontakt","3. Steckdosen ohne Erdungskontakt",[11,1163,1164],{},"Alte Steckdosen ohne Erdungsanschluss (die modernen belgischen Steckdosen sind Typ E mit Erdungsstift) werden unter Part 8 toleriert, sofern:",[91,1166,1167,1174,1181,1192],{},[94,1168,1169,1170,1173],{},"Die Steckdose durch einen ",[15,1171,1172],{},"Fehlerstromschutzschalter mit hoher oder sehr hoher Empfindlichkeit"," (max. 30 mA) geschützt ist (Art. 8.2.1 Nr. 6 Buchstabe b).",[94,1175,1176,1177,1180],{},"Keine Geräte der ",[15,1178,1179],{},"Schutzklasse I"," (mit Metallgehäuse) angeschlossen werden.",[94,1182,1183,1184,1187,1188,1191],{},"Die Steckdose nicht im ",[15,1185,1186],{},"Badezimmer"," oder an ",[15,1189,1190],{},"feuchten Orten"," ist.",[94,1193,1194],{},"Der Stromkreis ansonsten intakt ist.",[68,1196,1198],{"id":1197},"_4-kein-spd-überspannungsschutz","4. Kein SPD (Überspannungsschutz)",[11,1200,1201,1202,282],{},"Das aktuelle AREI schreibt für Neuinstallationen einen SPD (Surge Protection Device) Typ 2 vor. Unter Part 8 ist das ",[15,1203,1204],{},"nicht erforderlich",[68,1206,1208],{"id":1207},"_5-alte-verteilertechnik","5. Alte Verteilertechnik",[91,1210,1211,1217,1223],{},[94,1212,1213,1216],{},[15,1214,1215],{},"Schmelzsicherungen"," statt MCBs sind erlaubt.",[94,1218,1219,1222],{},[15,1220,1221],{},"Drehsicherungen"," (Diazed) werden toleriert.",[94,1224,1225,1226,1229],{},"Fehlende ",[15,1227,1228],{},"Beschriftung"," wird als Mangel vermerkt, führt aber nicht zum Durchfallen.",[68,1231,1233],{"id":1232},"_6-keine-brandschutzklassifizierung-der-kabel","6. Keine Brandschutzklassifizierung der Kabel",[11,1235,1236],{},"Kabel ohne CPR-Klassifizierung (vor 2017 installiert) werden toleriert, da die CPR-Verordnung erst ab Juli 2017 für neue Installationen gilt.",[20,1238],{},[23,1240,1242],{"id":1241},"was-ist-nicht-erlaubt-auch-unter-part-8","Was ist NICHT erlaubt (auch unter Part 8)?",[11,1244,1245,1246,1249],{},"Bestimmte Zustände werden ",[15,1247,1248],{},"niemals toleriert",", unabhängig vom Alter der Installation:",[68,1251,1253],{"id":1252},"absolut-unzulässig","Absolut unzulässig:",[140,1255,1256,1266],{},[143,1257,1258],{},[146,1259,1260,1263],{},[149,1261,1262],{},"Zustand",[149,1264,1265],{},"Warum?",[156,1267,1268,1278,1288,1298,1308,1318,1328,1338],{},[146,1269,1270,1275],{},[161,1271,1272],{},[15,1273,1274],{},"Blanke oder beschädigte Kabel",[161,1276,1277],{},"Unmittelbare Stromschlaggefahr",[146,1279,1280,1285],{},[161,1281,1282],{},[15,1283,1284],{},"Fehlende Erdung komplett",[161,1286,1287],{},"Kein Schutz bei Isolationsfehler",[146,1289,1290,1295],{},[161,1291,1292],{},[15,1293,1294],{},"Wasser in Kontakt mit Elektrik",[161,1296,1297],{},"Lebensgefahr",[146,1299,1300,1305],{},[161,1301,1302],{},[15,1303,1304],{},"Zugängliche spannungsführende Teile",[161,1306,1307],{},"Direktes Berührungsrisiko",[146,1309,1310,1315],{},[161,1311,1312],{},[15,1313,1314],{},"Überhitzte Kabel oder Verbindungen",[161,1316,1317],{},"Brandgefahr",[146,1319,1320,1325],{},[161,1321,1322],{},[15,1323,1324],{},"Lose Verbindungen in Verteilerdosen",[161,1326,1327],{},"Lichtbogen-\u002FBrandgefahr",[146,1329,1330,1335],{},[161,1331,1332],{},[15,1333,1334],{},"Abzweigdosen ohne Deckel",[161,1336,1337],{},"Berührungsschutz fehlt",[146,1339,1340,1345],{},[161,1341,1342],{},[15,1343,1344],{},"Badezimmer-Steckdose in Zone 0 oder 1",[161,1346,1347],{},"Lebensgefahr, auch unter Part 8 verboten",[68,1349,1351],{"id":1350},"sicherheitsrelevante-mindestanforderungen","Sicherheitsrelevante Mindestanforderungen:",[11,1353,1354],{},"Auch unter Part 8 muss gewährleistet sein:",[91,1356,1357,1363,1369,1375],{},[94,1358,1359,1362],{},[15,1360,1361],{},"Ausreichender Querschnitt"," für die tatsächliche Belastung (kein überlastetes 0,75 mm²-Kabel).",[94,1364,1365,1368],{},[15,1366,1367],{},"Funktionierende Sicherungen"," (keine „gebrückten\" Sicherungen).",[94,1370,1371,1374],{},[15,1372,1373],{},"Erdung des Hauptverteilers"," (Verbindung zur Erdungselektrode).",[94,1376,1377,1380],{},[15,1378,1379],{},"Zugänglichkeit"," des Verteilerkastens.",[20,1382],{},[23,1384,1386],{"id":1385},"periodische-kontrolle","Periodische Kontrolle",[68,1388,1390],{"id":1389},"periodizität-hängt-von-der-anlagenhistorie-ab","Periodizität hängt von der Anlagenhistorie ab",[11,1392,1393],{},"Die Aussage „jede Altanlage alle 25 Jahre“ ist zu pauschal. Der FÖD Wirtschaft unterscheidet Anlagen mit früherer AREI-Kontrolle von alten Anlagen vor dem 1. Oktober 1981 ohne entsprechende Kontrollhistorie. Verkauf, bedeutende Änderung oder Erweiterung, Leistungserhöhung und Bedingungen eines früheren Berichts können verschiedene Besuche und Fristen auslösen. Prüfen Sie den amtlichen Fall und den letzten Bericht.",[68,1395,1397],{"id":1396},"bei-eigentümerwechsel","Bei Eigentümerwechsel",[11,1399,1400,1401,1404],{},"Bei ",[15,1402,1403],{},"Verkauf einer Immobilie"," ist eine gültige Kontrollbescheinigung (weniger als 25 Jahre alt) Pflicht. Liegt keine vor, muss vor dem Verkauf eine Kontrolle durchgeführt werden.",[46,1406,1407],{},[11,1408,1409,1412,1413,1416],{},[15,1410,1411],{},"18-Monate-Frist (Art. 8.4.2.2):"," Bei Kauf einer Immobilie mit negativem Prüfbericht hat der Käufer ",[15,1414,1415],{},"18 Monate"," ab Kaufdatum, um die Mängel zu beheben und eine Nachkontrolle durchführen zu lassen.",[68,1418,1420],{"id":1419},"was-wird-bei-der-periodischen-kontrolle-geprüft","Was wird bei der periodischen Kontrolle geprüft?",[140,1422,1423,1433],{},[143,1424,1425],{},[146,1426,1427,1430],{},[149,1428,1429],{},"Prüfpunkt",[149,1431,1432],{},"Beurteilung",[156,1434,1435,1443,1451,1458,1466,1474,1482],{},[146,1436,1437,1440],{},[161,1438,1439],{},"Sichtprüfung der Kabel und Verbindungen",[161,1441,1442],{},"Beschädigung, Überhitzung",[146,1444,1445,1448],{},[161,1446,1447],{},"Erdungswiderstand messen",[161,1449,1450],{},"≤ 30 Ω (regulatorische Schwelle gemäß Art. 4.2.4.3b; darüber zusätzliche Schutzmaßnahmen nötig)",[146,1452,1453,1456],{},[161,1454,1455],{},"Isolationswiderstand messen",[161,1457,540],{},[146,1459,1460,1463],{},[161,1461,1462],{},"RCD-Test (falls vorhanden)",[161,1464,1465],{},"Auslösezeit und -strom",[146,1467,1468,1471],{},[161,1469,1470],{},"Kurzschlussschutz prüfen",[161,1472,1473],{},"Sicherungen \u002F MCBs vorhanden",[146,1475,1476,1479],{},[161,1477,1478],{},"Schutz gegen direktes Berühren",[161,1480,1481],{},"Abdeckungen, IP-Schutz",[146,1483,1484,1487],{},[161,1485,1486],{},"Dokumentation",[161,1488,1489],{},"Eindrahtschema + Situationsplan vorhanden?",[46,1491,1492],{},[11,1493,1494,1496,1497,1500,1501,1504],{},[15,1495,1152],{}," Auch unter Part 8 müssen ein ",[15,1498,1499],{},"Eindrahtschema"," und ein ",[15,1502,1503],{},"Situationsplan"," vorhanden sein — auch wenn diese nachträglich erstellt werden müssen.",[20,1506],{},[23,1508,1510],{"id":1509},"die-kontaminationsregel-bei-teilrenovierung","Die Kontaminationsregel bei Teilrenovierung",[11,1512,1513,1514,282],{},"Ein besonders wichtiger Aspekt bei Altbauten: die sogenannte ",[15,1515,1516],{},"Kontaminationsregel",[68,1518,1520],{"id":1519},"wie-funktioniert-sie","Wie funktioniert sie?",[11,1522,1523,1524,1527],{},"Wenn Sie einen Teil Ihrer Installation ",[15,1525,1526],{},"wesentlich verändern"," (z. B. neue Stromkreise hinzufügen), gilt:",[613,1529,1530,1537,1543],{},[94,1531,1532,1533,1536],{},"Der ",[15,1534,1535],{},"neue Teil"," muss vollständig dem aktuellen AREI entsprechen.",[94,1538,1532,1539,1542],{},[15,1540,1541],{},"bestehende Teil"," wird weiterhin nach Part 8 beurteilt.",[94,1544,1545,1548],{},[15,1546,1547],{},"ABER:"," Wenn der neue Teil den bestehenden Teil „kontaminiert\" (z. B. neue Kabel im selben Verteiler), kann der Kontrolleur entscheiden, dass der gesamte Verteiler dem aktuellen AREI entsprechen muss.",[68,1550,1552],{"id":1551},"praktische-konsequenz","Praktische Konsequenz:",[91,1554,1555,1562,1569],{},[94,1556,1557,1558,1561],{},"Planen Sie Renovierungen so, dass neue und alte Teile ",[15,1559,1560],{},"klar getrennt"," sind.",[94,1563,1564,1565,1568],{},"Idealerweise einen ",[15,1566,1567],{},"separaten Unterverteiler"," für neue Stromkreise.",[94,1570,1571],{},"Dokumentieren Sie genau, was alt und was neu ist.",[20,1573],{},[23,1575,1577],{"id":1576},"empfehlung-schrittweise-modernisierung","Empfehlung: Schrittweise Modernisierung",[11,1579,1580,1581,1584],{},"Auch wenn Part 8 Abweichungen toleriert, empfiehlt sich eine ",[15,1582,1583],{},"schrittweise Modernisierung",":",[68,1586,1588],{"id":1587},"priorität-1-sicherheitskritisch","Priorität 1 (Sicherheitskritisch)",[91,1590,1591,1594,1597,1600],{},[94,1592,1593],{},"300 mA Haupt-RCD nachrüsten (falls nicht vorhanden)",[94,1595,1596],{},"Beschädigte Kabel ersetzen",[94,1598,1599],{},"Lose Verbindungen beheben",[94,1601,1602],{},"Erdung prüfen und ggf. verbessern",[68,1604,1606],{"id":1605},"priorität-2-empfohlen","Priorität 2 (Empfohlen)",[91,1608,1609,1612,1615],{},[94,1610,1611],{},"30 mA Gruppen-RCDs für Badezimmer und Küche",[94,1613,1614],{},"Alte Schmelzsicherungen durch MCBs ersetzen",[94,1616,1617],{},"SPD Typ 2 nachrüsten",[68,1619,1621],{"id":1620},"priorität-3-komfort-zukunftssicherheit","Priorität 3 (Komfort + Zukunftssicherheit)",[91,1623,1624,1627,1630],{},[94,1625,1626],{},"Verteiler modernisieren (mehr Reihen, Beschriftung)",[94,1628,1629],{},"Steckdosen mit Erdung nachrüsten",[94,1631,1632],{},"Vorbereitung für Wallbox \u002F PV-Anlage",[68,1634,1636],{"id":1635},"arbeiten-vor-der-preisabfrage-abgrenzen","Arbeiten vor der Preisabfrage abgrenzen",[11,1638,1639],{},"Pauschale Online-Preisspannen sind kein belastbares Budget. Lassen Sie den Bestand aufnehmen, trennen Sie Sicherheitsmängel von freiwilligen Verbesserungen und holen Sie ein datiertes Angebot für das konkrete Gebäude ein. Leitungswege, Oberflächen, Zugänglichkeit, Verteilerzustand und Renovierungsumfang verändern den Aufwand wesentlich.",[23,1641,1643],{"id":1642},"zusammenfassung","Zusammenfassung",[140,1645,1646,1656],{},[143,1647,1648],{},[146,1649,1650,1653],{},[149,1651,1652],{},"Frage",[149,1654,1655],{},"Antwort",[156,1657,1658,1666,1674,1682,1690],{},[146,1659,1660,1663],{},[161,1661,1662],{},"Muss mein Altbau dem aktuellen AREI entsprechen?",[161,1664,1665],{},"Nicht vollständig, Part 8 erlaubt Abweichungen",[146,1667,1668,1671],{},[161,1669,1670],{},"Brauche ich einen 30 mA RCD?",[161,1672,1673],{},"Unter Part 8 nicht Pflicht, aber dringend empfohlen",[146,1675,1676,1679],{},[161,1677,1678],{},"Sind alte Steckdosen ohne Erdung erlaubt?",[161,1680,1681],{},"Unter Bedingungen ja (kein Badezimmer, keine Schutzklasse-I-Geräte)",[146,1683,1684,1687],{},[161,1685,1686],{},"Wie oft muss kontrolliert werden?",[161,1688,1689],{},"Abhängig von Kontrollhistorie und Anlass; Verkauf ist fallspezifisch",[146,1691,1692,1695],{},[161,1693,1694],{},"Was passiert bei Teilrenovierung?",[161,1696,1697],{},"Neuer Teil = aktuelles AREI, alter Teil = Part 8 (Umfang aus dem Regelwerk bestimmen)",[20,1699],{},[23,1701,1703],{"id":1702},"verwandte-artikel","Verwandte Artikel",[91,1705,1706,1712,1718,1724],{},[94,1707,1708],{},[795,1709,1711],{"href":1710},"\u002Fde\u002Fblog\u002Felektrische-kontrolle","Elektrische Kontrolle in Belgien: Was wird geprüft?",[94,1713,1714],{},[795,1715,1717],{"href":1716},"\u002Fde\u002Fblog\u002Farei-2026-aenderungen","Was ändert sich mit dem AREI 2026?",[94,1719,1720],{},[795,1721,1723],{"href":1722},"\u002Fde\u002Fblog\u002Fpreflex-vs-freie-verlegung","Preflex vs. freie Verlegung",[94,1725,1726],{},[795,1727,1729],{"href":1728},"\u002Fde\u002Fblog\u002Fschaltschrank-planen-aufbau","Schaltschrank planen",[20,1731],{},[11,1733,1734],{},[822,1735,1736,1737,1739,1740],{},"Auch für Altbauten hilft ",[15,1738,827],{},", Eindrahtschema und Situationsplan digital aufzubauen. Selbstcheck und Dokumente bleiben orientierend und müssen für den konkreten Bestand fachlich geprüft werden. ",[795,1741,1742],{"href":831},"Kostenlos starten →",[23,1744,1746],{"id":1745},"anlagenhistorie-vor-der-abweichung-klären","Anlagenhistorie vor der Abweichung klären",[11,1748,1749],{},"Das Gebäudealter allein reicht nicht. Erstellen Sie aus früheren Kontrollberichten, Verteilerbeschriftungen, Rechnungen, Genehmigungen und sichtbarer Ausführung eine Zeitleiste. Bestimmen Sie, welche Teile vor dem 1. Oktober 1981 bestanden, was später bedeutend geändert oder erweitert wurde und ob diese Arbeiten einer Konformitätskontrolle unterlagen. Teil 8 definiert Altanlagen und konkrete Abweichungen; er erklärt nicht jedes Bauteil in einem alten Haus zur Ausnahme.",[11,1751,1752],{},"Kennzeichnen Sie alte und neue Bereiche auf einer Arbeitskopie des Eindrahtschemas. Für jede beanspruchte Abweichung notieren Sie genaue V06-Stelle, betroffenen Kreis, Altersnachweis und verbleibende Sicherheitsbedingungen. Fehlen Belege, bleibt das Feld unbekannt; Kabelfarbe oder Aussehen sind kein verlässliches Datum. Der Kontrollorganismus entscheidet die Anwendbarkeit am tatsächlichen Bestand.",[11,1754,1755],{},"Verwenden Sie die informelle „Kontaminationsregel“ nicht wie einen AREI-Artikel. Eine bedeutende Änderung oder Erweiterung wird nach den anwendbaren aktuellen Vorschriften beurteilt; der Status vorhandener Teile folgt Definition, Geltungsbereich und Kontrollhistorie. Gemeinsame Verteiler und Schutzmaßnahmen machen die Abgrenzung wichtig, doch der Umfang ergibt sich aus Regelwerk und Projekt, nicht aus einem Schlagwort. Klären Sie strittige Grenzen vor Arbeitsbeginn.",[11,1757,1758,1759,1764],{},"Beim Verkauf gilt die ",[795,1760,1763],{"href":1761,"rel":1762},"https:\u002F\u002Feconomie.fgov.be\u002Fde\u002Fthemen\u002Fenergie\u002Fsicherheit-und-kontrolle\u002Fbuch-1-der-allgemeinen",[853],"FÖD-FAQ zu alten Anlagen",". Sie trennt Verkäuferpflichten, Mitteilung des Käufers und den 18-Monatsweg nach negativem Verkaufskontrollbericht. Dieser Ablauf ist nicht mit der 12-Monats-Nachkontrolle anderer negativer Fälle austauschbar. Datum der authentischen Urkunde und Berichtsart sind entscheidend.",[11,1766,1767],{},"Zur Übergabeakte gehören aktuelle Schemas, Kontrollberichte, Erklärungen, Anleitungen und spätere Änderungen. PlanElec hilft bei gleichen Referenzen, entscheidet aber weder die Zulässigkeit einer Abweichung noch alle Teil-8-Fälle. Geprüft am 29. August 2026 gegen AREI Buch 1 V06 und die FÖD-Seite mit Stand 1. April 2026.",[68,1769,1771],{"id":1770},"vor-ort-aufnahme-ohne-voreilige-schlussfolgerung","Vor-Ort-Aufnahme ohne voreilige Schlussfolgerung",[11,1773,1774],{},"Fotografieren und kennzeichnen Sie Verteiler, Sicherungen, Differenzstromschutz, Erdungsanschlüsse, sichtbare Leitungen und Abzweigdosen, ohne Abdeckungen unter Spannung zu entfernen. Übertragen Sie jeden identifizierten Kreis zunächst als Ist-Zustand. Offene Herkunft, unbekannter Querschnitt oder unlesbare Sicherungswerte bleiben explizit offen. Erst danach trennt die Fachkraft unmittelbare Sicherheitsmaßnahmen, kontrollpflichtige Änderungen und freiwillige Modernisierung. Diese Reihenfolge verhindert, dass eine moderne Zeichnung einen ungeklärten Altbestand fälschlich als heutigen Neubau darstellt.",[68,1776,1778],{"id":1777},"fachliche-entscheidungsliste","Fachliche Entscheidungsliste",[11,1780,1781],{},"Halten Sie zu jeder Abweichung fest, ob sie beibehalten, sicherheitstechnisch verbessert oder im Zuge der Arbeiten vollständig erneuert wird. Begründen Sie die Entscheidung mit Regelstelle, Befund und Verantwortlichem. Nach Abschluss werden alte Markierungen, neue Stromkreisreferenzen und der Kontrollbericht gemeinsam archiviert.",{"title":877,"searchDepth":878,"depth":878,"links":1783},[1784,1785,1790,1798,1802,1807,1811,1817,1818,1819],{"id":959,"depth":878,"text":960},{"id":991,"depth":878,"text":992,"children":1786},[1787,1788,1789],{"id":1002,"depth":884,"text":1003},{"id":1009,"depth":884,"text":1010},{"id":1020,"depth":884,"text":1021},{"id":1060,"depth":878,"text":1061,"children":1791},[1792,1793,1794,1795,1796,1797],{"id":1067,"depth":884,"text":1068},{"id":1108,"depth":884,"text":1109},{"id":1160,"depth":884,"text":1161},{"id":1197,"depth":884,"text":1198},{"id":1207,"depth":884,"text":1208},{"id":1232,"depth":884,"text":1233},{"id":1241,"depth":878,"text":1242,"children":1799},[1800,1801],{"id":1252,"depth":884,"text":1253},{"id":1350,"depth":884,"text":1351},{"id":1385,"depth":878,"text":1386,"children":1803},[1804,1805,1806],{"id":1389,"depth":884,"text":1390},{"id":1396,"depth":884,"text":1397},{"id":1419,"depth":884,"text":1420},{"id":1509,"depth":878,"text":1510,"children":1808},[1809,1810],{"id":1519,"depth":884,"text":1520},{"id":1551,"depth":884,"text":1552},{"id":1576,"depth":878,"text":1577,"children":1812},[1813,1814,1815,1816],{"id":1587,"depth":884,"text":1588},{"id":1605,"depth":884,"text":1606},{"id":1620,"depth":884,"text":1621},{"id":1635,"depth":884,"text":1636},{"id":1642,"depth":878,"text":1643},{"id":1702,"depth":878,"text":1703},{"id":1745,"depth":878,"text":1746,"children":1820},[1821,1822],{"id":1770,"depth":884,"text":1771},{"id":1777,"depth":884,"text":1778},"Was bei älteren Elektroinstallationen in Belgien gilt. AREI Part 8 erklärt: erlaubte Abweichungen, periodische Kontrolle und Tipps zur schrittweisen Modernisierung.","de",{},"\u002Fblog\u002Fold-building-arei-part8.de",{"title":946,"description":1823},"altbau-arei-part-8","blog\u002Fold-building-arei-part8.de",[1831,936,937,1832,1833,1834,1835],"altbau","bestandsinstallation","renovierung","kontrolle","periodisch","aUuZQhnPAlVlk0lx3mTTWY3gedJ4a6sHEwrrct1-PG8",{"id":1838,"title":1839,"articleId":6,"body":1840,"category":920,"date":921,"description":2696,"extension":923,"lastUpdated":924,"locale":2697,"meta":2698,"navigation":927,"path":2699,"publishDate":921,"readTime":929,"refreshInterval":930,"seo":2700,"slug":2701,"stem":2702,"tags":2703,"__hash__":2709},"blog\u002Fblog\u002Fold-building-arei-part8.en.md","Old Buildings and AREI Part 8: Special Rules for Existing Installations",{"type":8,"value":1841,"toc":2658},[1842,1848,1850,1854,1861,1872,1880,1882,1886,1893,1897,1900,1904,1911,1915,1941,1949,1951,1955,1958,1962,1999,2003,2039,2050,2054,2057,2086,2090,2096,2100,2121,2125,2128,2130,2134,2141,2145,2239,2243,2246,2272,2274,2278,2282,2285,2289,2296,2308,2312,2382,2396,2398,2402,2408,2412,2419,2440,2444,2462,2464,2468,2475,2479,2493,2497,2508,2512,2523,2527,2530,2534,2588,2590,2594,2620,2622,2633,2637,2640,2643,2646,2655],[11,1843,1844,1845,1847],{},"Not every electrical installation in Belgium needs to comply with the latest AREI\u002FRGIE regulations. For older buildings, ",[15,1846,17],{}," provides a dedicated set of rules that tolerates certain deviations from the current standard — as long as no immediate danger exists. This article explains when Part 8 applies, what is permitted, and where the limits lie.",[20,1849],{},[23,1851,1853],{"id":1852},"what-is-part-8","What Is Part 8?",[11,1855,1856,1857,1860],{},"Part 8 of the AREI (Algemeen Reglement op de Elektrische Installaties \u002F Règlement Général sur les Installations Électriques) is a ",[15,1858,1859],{},"special regulation for existing installations"," that were constructed and approved before the current AREI came into force.",[11,1862,1863,1864,1867,1868,1871],{},"The basic principle: as long as an installation functions ",[15,1865,1866],{},"safely"," and poses ",[15,1869,1870],{},"no immediate danger",", it does not need to be fully brought up to the latest standards — even if it does not meet all current requirements.",[46,1873,1874],{},[11,1875,1876,1879],{},[15,1877,1878],{},"Important:"," Part 8 is not a free pass. It clearly defines which deviations are tolerated and which are not.",[20,1881],{},[23,1883,1885],{"id":1884},"when-does-part-8-apply","When Does Part 8 Apply?",[11,1887,1888,1889,1892],{},"Part 8 applies to installations that meet ",[15,1890,1891],{},"one"," of the following conditions:",[68,1894,1896],{"id":1895},"condition-1-installation-before-01101981","Condition 1: Installation Before 01.10.1981",[11,1898,1899],{},"Installations constructed before 1 October 1981 (the date the original AREI came into force) fall under Part 8 by default.",[68,1901,1903],{"id":1902},"condition-2-approved-under-the-old-arei","Condition 2: Approved Under the Old AREI",[11,1905,1906,1907,1910],{},"Installations that were approved under a previous version of the AREI and have ",[15,1908,1909],{},"not been substantially modified"," since the last approval.",[68,1912,1914],{"id":1913},"what-counts-as-a-substantial-modification","What Counts as a \"Substantial Modification\"?",[91,1916,1917,1923,1929,1935],{},[94,1918,1919,1920],{},"Adding ",[15,1921,1922],{},"new circuits",[94,1924,1925,1926],{},"Expanding the ",[15,1927,1928],{},"distribution board",[94,1930,1931,1932],{},"Modifying the ",[15,1933,1934],{},"metering installation",[94,1936,1937,1938],{},"Extensive ",[15,1939,1940],{},"rewiring",[46,1942,1943],{},[11,1944,1945,1948],{},[15,1946,1947],{},"Note:"," Small changes such as replacing a socket outlet or switch do NOT count as a substantial modification.",[20,1950],{},[23,1952,1954],{"id":1953},"what-is-permitted-under-part-8-tolerated-deviations","What Is Permitted Under Part 8? (Tolerated Deviations)",[11,1956,1957],{},"The following points deviate from the current AREI but are tolerated under Part 8 during inspection:",[68,1959,1961],{"id":1960},"_1-old-cable-types","1. Old Cable Types",[140,1963,1964,1974],{},[143,1965,1966],{},[146,1967,1968,1971],{},[149,1969,1970],{},"Current AREI",[149,1972,1973],{},"Part 8 tolerates",[156,1975,1976,1983,1991],{},[146,1977,1978,1980],{},[161,1979,163],{},[161,1981,1982],{},"VOB cables in old conduits",[146,1984,1985,1988],{},[161,1986,1987],{},"Cca fire reaction class",[161,1989,1990],{},"Older cable types without CPR classification",[146,1992,1993,1996],{},[161,1994,1995],{},"Minimum cross-section 2.5 mm² for sockets",[161,1997,1998],{},"Minimum 1 mm² with max. 6A fuse or 10A MCB (Art. 8.2.1 Nr. 5)",[68,2000,2002],{"id":2001},"_2-residual-current-devices-rcd","2. Residual Current Devices (RCD)",[140,2004,2005,2013],{},[143,2006,2007],{},[146,2008,2009,2011],{},[149,2010,1970],{},[149,2012,1973],{},[156,2014,2015,2023,2031],{},[146,2016,2017,2020],{},[161,2018,2019],{},"30 mA RCD per socket circuit",[161,2021,2022],{},"No 30 mA RCD needed (only 300 mA main RCD)",[146,2024,2025,2028],{},[161,2026,2027],{},"30 mA RCD mandatory for bathroom",[161,2029,2030],{},"Remains mandatory (not covered by the Part 8 deviation, Art. 4.2.4.3 b No. 3 \u002F Art. 7.1.4.3)",[146,2032,2033,2036],{},[161,2034,2035],{},"Max. 8 circuits per RCD",[161,2037,2038],{},"More circuits permitted",[46,2040,2041],{},[11,2042,2043,2045,2046,2049],{},[15,2044,1947],{}," Even under Part 8, a ",[15,2047,2048],{},"300 mA main RCD"," is recommended and often required by the grid operator when a new meter is installed.",[68,2051,2053],{"id":2052},"_3-socket-outlets-without-earth-contact","3. Socket Outlets Without Earth Contact",[11,2055,2056],{},"Old socket outlets (type C, without earth pin) are tolerated under Part 8, provided that:",[91,2058,2059,2066,2073,2083],{},[94,2060,2061,2062,2065],{},"The socket is protected by a ",[15,2063,2064],{},"high or very high sensitivity RCD"," (max. 30 mA) (Art. 8.2.1 No. 6 letter b).",[94,2067,2068,2069,2072],{},"No ",[15,2070,2071],{},"Class I"," appliances (with metal housing) are connected.",[94,2074,2075,2076,2079,2080,282],{},"The socket is not in the ",[15,2077,2078],{},"bathroom"," or in a ",[15,2081,2082],{},"damp location",[94,2084,2085],{},"The circuit is otherwise intact.",[68,2087,2089],{"id":2088},"_4-no-spd-surge-protection","4. No SPD (Surge Protection)",[11,2091,2092,2093,282],{},"The current AREI requires a Type 2 SPD (Surge Protection Device) for new installations. Under Part 8, this is ",[15,2094,2095],{},"not required",[68,2097,2099],{"id":2098},"_5-old-distribution-technology","5. Old Distribution Technology",[91,2101,2102,2108,2114],{},[94,2103,2104,2107],{},[15,2105,2106],{},"Fuses"," instead of MCBs are permitted.",[94,2109,2110,2113],{},[15,2111,2112],{},"Screw-type fuses"," (Diazed) are tolerated.",[94,2115,2116,2117,2120],{},"Missing ",[15,2118,2119],{},"labelling"," is noted as a deficiency but does not cause a failure.",[68,2122,2124],{"id":2123},"_6-no-fire-reaction-classification-of-cables","6. No Fire Reaction Classification of Cables",[11,2126,2127],{},"Cables without CPR classification (installed before 2017) are tolerated, as the CPR regulation only applies from July 2017 for new installations.",[20,2129],{},[23,2131,2133],{"id":2132},"what-is-not-permitted-even-under-part-8","What Is NOT Permitted (Even Under Part 8)?",[11,2135,2136,2137,2140],{},"Certain conditions are ",[15,2138,2139],{},"never tolerated",", regardless of the installation's age:",[68,2142,2144],{"id":2143},"absolutely-impermissible","Absolutely Impermissible:",[140,2146,2147,2157],{},[143,2148,2149],{},[146,2150,2151,2154],{},[149,2152,2153],{},"Condition",[149,2155,2156],{},"Why?",[156,2158,2159,2169,2179,2189,2199,2209,2219,2229],{},[146,2160,2161,2166],{},[161,2162,2163],{},[15,2164,2165],{},"Bare or damaged cables",[161,2167,2168],{},"Immediate electrocution risk",[146,2170,2171,2176],{},[161,2172,2173],{},[15,2174,2175],{},"Complete absence of earthing",[161,2177,2178],{},"No protection in case of insulation fault",[146,2180,2181,2186],{},[161,2182,2183],{},[15,2184,2185],{},"Water in contact with electrics",[161,2187,2188],{},"Danger to life",[146,2190,2191,2196],{},[161,2192,2193],{},[15,2194,2195],{},"Accessible live parts",[161,2197,2198],{},"Direct contact risk",[146,2200,2201,2206],{},[161,2202,2203],{},[15,2204,2205],{},"Overheated cables or connections",[161,2207,2208],{},"Fire risk",[146,2210,2211,2216],{},[161,2212,2213],{},[15,2214,2215],{},"Loose connections in junction boxes",[161,2217,2218],{},"Arc\u002Ffire risk",[146,2220,2221,2226],{},[161,2222,2223],{},[15,2224,2225],{},"Junction boxes without covers",[161,2227,2228],{},"Contact protection missing",[146,2230,2231,2236],{},[161,2232,2233],{},[15,2234,2235],{},"Bathroom socket in zone 0 or 1",[161,2237,2238],{},"Danger to life, prohibited even under Part 8",[68,2240,2242],{"id":2241},"safety-related-minimum-requirements","Safety-Related Minimum Requirements:",[11,2244,2245],{},"Even under Part 8, the following must be ensured:",[91,2247,2248,2254,2260,2266],{},[94,2249,2250,2253],{},[15,2251,2252],{},"Adequate cross-section"," for the actual load (no overloaded 0.75 mm² cable).",[94,2255,2256,2259],{},[15,2257,2258],{},"Functioning fuses"," (no \"bridged\" fuses).",[94,2261,2262,2265],{},[15,2263,2264],{},"Earthing of the main board"," (connection to earth electrode).",[94,2267,2268,2271],{},[15,2269,2270],{},"Accessibility"," of the distribution board.",[20,2273],{},[23,2275,2277],{"id":2276},"periodic-inspection","Periodic Inspection",[68,2279,2281],{"id":2280},"periodicity-depends-on-the-installation-history","Periodicity depends on the installation history",[11,2283,2284],{},"A blanket “every old installation every 25 years” statement is not accurate. The FPS Economy distinguishes installations already controlled under the AREI from old pre-1 October 1981 installations that were never brought into that control history. Sale, significant modification or extension, power increase and earlier report conditions can trigger different visits and deadlines. Check the official case guidance and the latest report.",[68,2286,2288],{"id":2287},"on-change-of-ownership","On Change of Ownership",[11,2290,2291,2292,2295],{},"When ",[15,2293,2294],{},"selling a property",", a valid inspection certificate (less than 25 years old) is mandatory. If none exists, an inspection must be carried out before the sale.",[46,2297,2298],{},[11,2299,2300,2303,2304,2307],{},[15,2301,2302],{},"18-month deadline (Art. 8.4.2.2):"," When purchasing a property with a negative inspection report, the buyer has ",[15,2305,2306],{},"18 months"," from the purchase date to remedy the defects and have a re-inspection carried out.",[68,2309,2311],{"id":2310},"what-is-checked-during-the-periodic-inspection","What Is Checked During the Periodic Inspection?",[140,2313,2314,2324],{},[143,2315,2316],{},[146,2317,2318,2321],{},[149,2319,2320],{},"Inspection Point",[149,2322,2323],{},"Assessment",[156,2325,2326,2334,2342,2350,2358,2366,2374],{},[146,2327,2328,2331],{},[161,2329,2330],{},"Visual inspection of cables and connections",[161,2332,2333],{},"Damage, overheating",[146,2335,2336,2339],{},[161,2337,2338],{},"Earth resistance measurement",[161,2340,2341],{},"≤ 30 Ohm (regulatory threshold per Art. 4.2.4.3b; above this, additional protective measures required)",[146,2343,2344,2347],{},[161,2345,2346],{},"Insulation resistance measurement",[161,2348,2349],{},"> 0.5 MOhm",[146,2351,2352,2355],{},[161,2353,2354],{},"RCD test (if present)",[161,2356,2357],{},"Trip time and current",[146,2359,2360,2363],{},[161,2361,2362],{},"Short-circuit protection check",[161,2364,2365],{},"Fuses \u002F MCBs present",[146,2367,2368,2371],{},[161,2369,2370],{},"Protection against direct contact",[161,2372,2373],{},"Covers, IP protection",[146,2375,2376,2379],{},[161,2377,2378],{},"Documentation",[161,2380,2381],{},"Single-line diagram + situation plan present?",[46,2383,2384],{},[11,2385,2386,2045,2388,2391,2392,2395],{},[15,2387,1947],{},[15,2389,2390],{},"single-line diagram"," and a ",[15,2393,2394],{},"situation plan"," must be available — even if they need to be created retrospectively.",[20,2397],{},[23,2399,2401],{"id":2400},"the-contamination-rule-for-partial-renovations","The Contamination Rule for Partial Renovations",[11,2403,2404,2405,282],{},"A particularly important aspect for old buildings: the so-called ",[15,2406,2407],{},"contamination rule",[68,2409,2411],{"id":2410},"how-does-it-work","How Does It Work?",[11,2413,2414,2415,2418],{},"When you ",[15,2416,2417],{},"substantially modify"," part of your installation (e.g., adding new circuits):",[613,2420,2421,2428,2434],{},[94,2422,2423,2424,2427],{},"The ",[15,2425,2426],{},"new part"," must fully comply with the current AREI.",[94,2429,2423,2430,2433],{},[15,2431,2432],{},"existing part"," continues to be assessed under Part 8.",[94,2435,2436,2439],{},[15,2437,2438],{},"BUT:"," If the new part \"contaminates\" the existing part (e.g., new cables in the same distribution board), the inspector may decide that the entire board must comply with the current AREI.",[68,2441,2443],{"id":2442},"practical-consequences","Practical Consequences:",[91,2445,2446,2452,2459],{},[94,2447,2448,2449,282],{},"Plan renovations so that new and old parts are ",[15,2450,2451],{},"clearly separated",[94,2453,2454,2455,2458],{},"Ideally, use a ",[15,2456,2457],{},"separate sub-board"," for new circuits.",[94,2460,2461],{},"Document precisely what is old and what is new.",[20,2463],{},[23,2465,2467],{"id":2466},"recommendation-gradual-modernisation","Recommendation: Gradual Modernisation",[11,2469,2470,2471,2474],{},"Even though Part 8 tolerates deviations, ",[15,2472,2473],{},"gradual modernisation"," is recommended:",[68,2476,2478],{"id":2477},"priority-1-safety-critical","Priority 1 (Safety-Critical)",[91,2480,2481,2484,2487,2490],{},[94,2482,2483],{},"Retrofit a 300 mA main RCD (if not present)",[94,2485,2486],{},"Replace damaged cables",[94,2488,2489],{},"Fix loose connections",[94,2491,2492],{},"Check and improve earthing if necessary",[68,2494,2496],{"id":2495},"priority-2-recommended","Priority 2 (Recommended)",[91,2498,2499,2502,2505],{},[94,2500,2501],{},"30 mA group RCDs for bathroom and kitchen",[94,2503,2504],{},"Replace old fuses with MCBs",[94,2506,2507],{},"Retrofit SPD Type 2",[68,2509,2511],{"id":2510},"priority-3-comfort-future-proofing","Priority 3 (Comfort + Future-Proofing)",[91,2513,2514,2517,2520],{},[94,2515,2516],{},"Modernise the board (more rows, labelling)",[94,2518,2519],{},"Retrofit socket outlets with earth",[94,2521,2522],{},"Preparation for EV charger \u002F PV system",[68,2524,2526],{"id":2525},"scope-work-before-pricing","Scope work before pricing",[11,2528,2529],{},"Do not use a generic online price range as a factual budget. Have the existing installation inventoried, classify safety defects separately from optional improvements, and request a dated quotation for the actual building. Cable routes, finishes, accessibility, board condition and the intended renovation scope change the work materially.",[23,2531,2533],{"id":2532},"summary","Summary",[140,2535,2536,2546],{},[143,2537,2538],{},[146,2539,2540,2543],{},[149,2541,2542],{},"Question",[149,2544,2545],{},"Answer",[156,2547,2548,2556,2564,2572,2580],{},[146,2549,2550,2553],{},[161,2551,2552],{},"Does my old building need to comply with the current AREI?",[161,2554,2555],{},"Not fully, Part 8 permits deviations",[146,2557,2558,2561],{},[161,2559,2560],{},"Do I need a 30 mA RCD?",[161,2562,2563],{},"Not mandatory under Part 8, but strongly recommended",[146,2565,2566,2569],{},[161,2567,2568],{},"Are old sockets without earth permitted?",[161,2570,2571],{},"Under conditions yes (no bathroom, no Class I appliances)",[146,2573,2574,2577],{},[161,2575,2576],{},"How often must inspections take place?",[161,2578,2579],{},"Depends on control history and trigger; sale rules are case-specific",[146,2581,2582,2585],{},[161,2583,2584],{},"What about partial renovation?",[161,2586,2587],{},"New part = current AREI, old part = Part 8 (scope must be established from the regulation)",[20,2589],{},[23,2591,2593],{"id":2592},"related-articles","Related Articles",[91,2595,2596,2602,2608,2614],{},[94,2597,2598],{},[795,2599,2601],{"href":2600},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical Inspection in Belgium: What Is Checked?",[94,2603,2604],{},[795,2605,2607],{"href":2606},"\u002Fen\u002Fblog\u002Farei-2026-changes","What Changes with the AREI 2026?",[94,2609,2610],{},[795,2611,2613],{"href":2612},"\u002Fen\u002Fblog\u002Fpreflex-vs-open-wiring","Preflex vs. Open Wiring",[94,2615,2616],{},[795,2617,2619],{"href":2618},"\u002Fen\u002Fblog\u002Fdistribution-board-planning-guide","Distribution Board Planning",[20,2621],{},[11,2623,2624],{},[822,2625,2626,2627,2629,2630],{},"For older buildings, ",[15,2628,827],{}," helps build the single-line diagram and situation plan digitally. The self-check is advisory; have the documents and applicable derogations reviewed professionally. ",[795,2631,2632],{"href":831},"Start for free →",[23,2634,2636],{"id":2635},"determine-the-legal-history-before-choosing-a-derogation","Determine the legal history before choosing a derogation",[11,2638,2639],{},"The date of the building is not enough. Build a timeline from earlier inspection reports, board labels, invoices, permits and visible construction. Identify which parts existed before 1 October 1981, which were later modified or extended, and whether those later works received a conformity inspection. Part 8 defines old installations and specific derogations; it does not turn every component in an old house into an exempt component.",[11,2641,2642],{},"Mark old and new parts on a working copy of the single-line diagram. For every proposed derogation, record the exact V06 provision, the circuit concerned, the evidence of age and the remaining safety conditions. If evidence is missing, label it unknown rather than assigning a date from cable colour or appearance. The approved control body determines whether the derogation applies to the actual installation.",[11,2644,2645],{},"Do not use the informal “contamination rule” as if it were an AREI article. A significant modification or extension is assessed under the applicable current provisions, while the status of existing parts depends on definitions, scope and inspection history. Shared boards and protective measures can make the boundary important, but the correct scope must be established from regulation and project, not a slogan. Ask the control body before work when the boundary affects the renovation strategy.",[11,2647,2648,2649,2654],{},"For a sale, follow the ",[795,2650,2653],{"href":2651,"rel":2652},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Flivre-1-du-reglement-general",[853],"FPS Economy sale FAQ",". It distinguishes seller duties, buyer communication and the 18-month route after a negative sale inspection. That route is not interchangeable with the 12-month follow-up for other negative controls. The authentic deed date and report type matter.",[11,2656,2657],{},"The handover file should contain current diagrams, reports, declarations, instructions and subsequent modifications. PlanElec can help reconcile identifiers, but does not decide derogation eligibility or cover every Part 8 case. Reviewed on 29 August 2026 against Book 1 V06 and the FPS page updated 1 April 2026.",{"title":877,"searchDepth":878,"depth":878,"links":2659},[2660,2661,2666,2674,2678,2683,2687,2693,2694,2695],{"id":1852,"depth":878,"text":1853},{"id":1884,"depth":878,"text":1885,"children":2662},[2663,2664,2665],{"id":1895,"depth":884,"text":1896},{"id":1902,"depth":884,"text":1903},{"id":1913,"depth":884,"text":1914},{"id":1953,"depth":878,"text":1954,"children":2667},[2668,2669,2670,2671,2672,2673],{"id":1960,"depth":884,"text":1961},{"id":2001,"depth":884,"text":2002},{"id":2052,"depth":884,"text":2053},{"id":2088,"depth":884,"text":2089},{"id":2098,"depth":884,"text":2099},{"id":2123,"depth":884,"text":2124},{"id":2132,"depth":878,"text":2133,"children":2675},[2676,2677],{"id":2143,"depth":884,"text":2144},{"id":2241,"depth":884,"text":2242},{"id":2276,"depth":878,"text":2277,"children":2679},[2680,2681,2682],{"id":2280,"depth":884,"text":2281},{"id":2287,"depth":884,"text":2288},{"id":2310,"depth":884,"text":2311},{"id":2400,"depth":878,"text":2401,"children":2684},[2685,2686],{"id":2410,"depth":884,"text":2411},{"id":2442,"depth":884,"text":2443},{"id":2466,"depth":878,"text":2467,"children":2688},[2689,2690,2691,2692],{"id":2477,"depth":884,"text":2478},{"id":2495,"depth":884,"text":2496},{"id":2510,"depth":884,"text":2511},{"id":2525,"depth":884,"text":2526},{"id":2532,"depth":878,"text":2533},{"id":2592,"depth":878,"text":2593},{"id":2635,"depth":878,"text":2636},"What applies to older electrical installations in Belgium. AREI Part 8 explained: permitted deviations, periodic inspection, and tips for gradual modernisation.","en",{},"\u002Fblog\u002Fold-building-arei-part8.en",{"title":1839,"description":2696},"old-building-arei-part-8","blog\u002Fold-building-arei-part8.en",[2704,936,937,2705,2706,2707,2708],"old building","existing installation","renovation","inspection","periodic","y1-nu9SVYmjq40UW8PulFYQ6Od1nX3ruefF5fhklc8g",{"id":2711,"title":2712,"articleId":6,"body":2713,"category":920,"date":921,"description":3569,"extension":923,"lastUpdated":924,"locale":3570,"meta":3571,"navigation":927,"path":3572,"publishDate":921,"readTime":929,"refreshInterval":930,"seo":3573,"slug":3574,"stem":3575,"tags":3576,"__hash__":3583},"blog\u002Fblog\u002Fold-building-arei-part8.fr.md","Ancien bâtiment et RGIE Partie 8 : Règles spéciales pour les installations existantes",{"type":8,"value":2714,"toc":3531},[2715,2722,2724,2728,2735,2746,2754,2756,2760,2767,2771,2774,2778,2785,2789,2815,2823,2825,2829,2832,2836,2874,2878,2914,2926,2930,2933,2962,2966,2972,2976,2998,3002,3005,3007,3011,3018,3022,3116,3120,3123,3149,3151,3155,3159,3162,3166,3173,3185,3189,3257,3271,3273,3277,3283,3287,3294,3315,3319,3337,3339,3343,3350,3354,3368,3372,3383,3387,3398,3402,3405,3409,3462,3464,3468,3494,3496,3507,3511,3514,3517,3520,3528],[11,2716,2717,2718,2721],{},"Toute installation électrique en Belgique ne doit pas forcément répondre aux dernières prescriptions du RGIE. Pour les bâtiments plus anciens, la ",[15,2719,2720],{},"Partie 8"," constitue un ensemble de règles spécifiques qui tolère certaines dérogations par rapport au standard actuel — tant qu'il n'existe pas de danger immédiat. Cet article explique quand la Partie 8 s'applique, ce qui est autorisé et où se trouvent les limites.",[20,2723],{},[23,2725,2727],{"id":2726},"quest-ce-que-la-partie-8","Qu'est-ce que la Partie 8 ?",[11,2729,2730,2731,2734],{},"La Partie 8 du RGIE (Règlement Général sur les Installations Électriques) est une ",[15,2732,2733],{},"réglementation spéciale pour les installations existantes"," qui ont été réalisées et réceptionnées avant l'entrée en vigueur du RGIE actuel.",[11,2736,2737,2738,2741,2742,2745],{},"Le principe de base : tant qu'une installation fonctionne de manière ",[15,2739,2740],{},"sûre"," et ne représente ",[15,2743,2744],{},"aucun danger immédiat",", elle n'a pas à être entièrement mise aux normes actuelles — même si elle ne répond pas à toutes les prescriptions en vigueur.",[46,2747,2748],{},[11,2749,2750,2753],{},[15,2751,2752],{},"Important :"," La Partie 8 n'est pas un blanc-seing. Elle définit clairement quelles dérogations sont tolérées et lesquelles ne le sont pas.",[20,2755],{},[23,2757,2759],{"id":2758},"quand-la-partie-8-sapplique-t-elle","Quand la Partie 8 s'applique-t-elle ?",[11,2761,2762,2763,2766],{},"La Partie 8 s'applique aux installations qui remplissent ",[15,2764,2765],{},"l'une"," des conditions suivantes :",[68,2768,2770],{"id":2769},"condition-1-installation-avant-le-01101981","Condition 1 : Installation avant le 01.10.1981",[11,2772,2773],{},"Les installations réalisées avant le 1er octobre 1981 (date d'entrée en vigueur du RGIE original) tombent en principe sous la Partie 8.",[68,2775,2777],{"id":2776},"condition-2-réceptionnée-sous-lancien-rgie","Condition 2 : Réceptionnée sous l'ancien RGIE",[11,2779,2780,2781,2784],{},"Les installations qui ont été réceptionnées sous une version antérieure du RGIE et qui n'ont ",[15,2782,2783],{},"pas été substantiellement modifiées"," depuis la dernière réception.",[68,2786,2788],{"id":2787},"quest-ce-quune-modification-substantielle","Qu'est-ce qu'une « modification substantielle » ?",[91,2790,2791,2797,2803,2809],{},[94,2792,2793,2794],{},"Ajout de ",[15,2795,2796],{},"nouveaux circuits",[94,2798,2799,2800],{},"Extension du ",[15,2801,2802],{},"tableau de distribution",[94,2804,2805,2806],{},"Modification de l'",[15,2807,2808],{},"installation de comptage",[94,2810,2811,2814],{},[15,2812,2813],{},"Recâblage"," important",[46,2816,2817],{},[11,2818,2819,2822],{},[15,2820,2821],{},"Attention :"," Les petites modifications comme le remplacement d'une prise ou d'un interrupteur ne comptent PAS comme modification substantielle.",[20,2824],{},[23,2826,2828],{"id":2827},"ce-qui-est-autorisé-sous-la-partie-8-dérogations-tolérées","Ce qui est autorisé sous la Partie 8 (Dérogations tolérées)",[11,2830,2831],{},"Les points suivants s'écartent du RGIE actuel, mais sont tolérés sous la Partie 8 lors du contrôle :",[68,2833,2835],{"id":2834},"_1-anciens-types-de-câbles","1. Anciens types de câbles",[140,2837,2838,2848],{},[143,2839,2840],{},[146,2841,2842,2845],{},[149,2843,2844],{},"RGIE actuel",[149,2846,2847],{},"Partie 8 tolère",[156,2849,2850,2858,2866],{},[146,2851,2852,2855],{},[161,2853,2854],{},"XVB \u002F VOBst en Preflex",[161,2856,2857],{},"Câbles VOB dans d'anciennes gaines",[146,2859,2860,2863],{},[161,2861,2862],{},"Classe de réaction au feu Cca",[161,2864,2865],{},"Types de câbles plus anciens sans classification CPR",[146,2867,2868,2871],{},[161,2869,2870],{},"Section minimale 2,5 mm² pour les prises",[161,2872,2873],{},"Minimum 1 mm² avec fusible max. 6 A ou disjoncteur max. 10 A (Art. 8.2.1 Nr. 5)",[68,2875,2877],{"id":2876},"_2-différentiels-rcd","2. Différentiels (RCD)",[140,2879,2880,2888],{},[143,2881,2882],{},[146,2883,2884,2886],{},[149,2885,2844],{},[149,2887,2847],{},[156,2889,2890,2898,2906],{},[146,2891,2892,2895],{},[161,2893,2894],{},"Différentiel 30 mA par circuit prises",[161,2896,2897],{},"Pas de 30 mA nécessaire (seulement 300 mA principal)",[146,2899,2900,2903],{},[161,2901,2902],{},"Différentiel 30 mA obligatoire pour salle de bain",[161,2904,2905],{},"Reste obligatoire (non couvert par la dérogation Partie 8, Art. 4.2.4.3 b N° 3 \u002F Art. 7.1.4.3)",[146,2907,2908,2911],{},[161,2909,2910],{},"Max. 8 circuits par RCD",[161,2912,2913],{},"Plus de circuits autorisés",[46,2915,2916],{},[11,2917,2918,2921,2922,2925],{},[15,2919,2920],{},"Note :"," Même sous la Partie 8, un ",[15,2923,2924],{},"différentiel principal 300 mA"," est recommandé et souvent exigé par le gestionnaire de réseau lors d'une nouvelle installation de compteur.",[68,2927,2929],{"id":2928},"_3-prises-sans-contact-de-terre","3. Prises sans contact de terre",[11,2931,2932],{},"Les anciennes prises (type C, sans broche de terre) sont tolérées sous la Partie 8, à condition que :",[91,2934,2935,2942,2949,2959],{},[94,2936,2937,2938,2941],{},"La prise soit protégée par un ",[15,2939,2940],{},"différentiel à haute ou très haute sensibilité"," (max. 30 mA) (Art. 8.2.1 N° 6 lettre b).",[94,2943,2944,2945,2948],{},"Aucun appareil de ",[15,2946,2947],{},"classe de protection I"," (avec boîtier métallique) ne soit branché.",[94,2950,2951,2952,2955,2956,282],{},"La prise ne soit pas dans la ",[15,2953,2954],{},"salle de bain"," ou dans un ",[15,2957,2958],{},"lieu humide",[94,2960,2961],{},"Le circuit soit par ailleurs intact.",[68,2963,2965],{"id":2964},"_4-pas-de-parafoudre-spd","4. Pas de parafoudre (SPD)",[11,2967,2968,2969,282],{},"Le RGIE actuel prescrit un parafoudre (SPD) Type 2 pour les nouvelles installations. Sous la Partie 8, ce n'est ",[15,2970,2971],{},"pas requis",[68,2973,2975],{"id":2974},"_5-ancienne-technique-de-distribution","5. Ancienne technique de distribution",[91,2977,2978,2985,2991],{},[94,2979,2980,2981,2984],{},"Les ",[15,2982,2983],{},"fusibles"," au lieu de disjoncteurs sont autorisés.",[94,2986,2980,2987,2990],{},[15,2988,2989],{},"fusibles à vis"," (Diazed) sont tolérés.",[94,2992,2993,2994,2997],{},"L'absence d'",[15,2995,2996],{},"étiquetage"," est mentionnée comme défaut, mais n'entraîne pas un échec.",[68,2999,3001],{"id":3000},"_6-pas-de-classification-de-réaction-au-feu-des-câbles","6. Pas de classification de réaction au feu des câbles",[11,3003,3004],{},"Les câbles sans classification CPR (installés avant 2017) sont tolérés, car le règlement CPR ne s'applique qu'à partir de juillet 2017 pour les nouvelles installations.",[20,3006],{},[23,3008,3010],{"id":3009},"ce-qui-nest-pas-autorisé-même-sous-la-partie-8","Ce qui n'est PAS autorisé (même sous la Partie 8)",[11,3012,3013,3014,3017],{},"Certaines situations ne sont ",[15,3015,3016],{},"jamais tolérées",", quel que soit l'âge de l'installation :",[68,3019,3021],{"id":3020},"absolument-inadmissible","Absolument inadmissible :",[140,3023,3024,3034],{},[143,3025,3026],{},[146,3027,3028,3031],{},[149,3029,3030],{},"Situation",[149,3032,3033],{},"Pourquoi ?",[156,3035,3036,3046,3056,3066,3076,3086,3096,3106],{},[146,3037,3038,3043],{},[161,3039,3040],{},[15,3041,3042],{},"Câbles dénudés ou endommagés",[161,3044,3045],{},"Danger immédiat d'électrocution",[146,3047,3048,3053],{},[161,3049,3050],{},[15,3051,3052],{},"Absence totale de mise à la terre",[161,3054,3055],{},"Pas de protection en cas de défaut d'isolement",[146,3057,3058,3063],{},[161,3059,3060],{},[15,3061,3062],{},"Eau en contact avec l'électricité",[161,3064,3065],{},"Danger de mort",[146,3067,3068,3073],{},[161,3069,3070],{},[15,3071,3072],{},"Parties sous tension accessibles",[161,3074,3075],{},"Risque de contact direct",[146,3077,3078,3083],{},[161,3079,3080],{},[15,3081,3082],{},"Câbles ou connexions en surchauffe",[161,3084,3085],{},"Risque d'incendie",[146,3087,3088,3093],{},[161,3089,3090],{},[15,3091,3092],{},"Connexions desserrées dans les boîtes de dérivation",[161,3094,3095],{},"Risque d'arc\u002Fincendie",[146,3097,3098,3103],{},[161,3099,3100],{},[15,3101,3102],{},"Boîtes de dérivation sans couvercle",[161,3104,3105],{},"Protection contre les contacts manquante",[146,3107,3108,3113],{},[161,3109,3110],{},[15,3111,3112],{},"Prise de salle de bain en zone 0 ou 1",[161,3114,3115],{},"Danger de mort, interdit même sous Partie 8",[68,3117,3119],{"id":3118},"exigences-minimales-de-sécurité","Exigences minimales de sécurité :",[11,3121,3122],{},"Même sous la Partie 8, il faut garantir :",[91,3124,3125,3131,3137,3143],{},[94,3126,3127,3130],{},[15,3128,3129],{},"Section suffisante"," pour la charge réelle (pas de câble 0,75 mm² surchargé).",[94,3132,3133,3136],{},[15,3134,3135],{},"Fusibles fonctionnels"," (pas de fusibles « pontés »).",[94,3138,3139,3142],{},[15,3140,3141],{},"Mise à la terre du tableau principal"," (connexion à l'électrode de terre).",[94,3144,3145,3148],{},[15,3146,3147],{},"Accessibilité"," du tableau de distribution.",[20,3150],{},[23,3152,3154],{"id":3153},"contrôle-périodique","Contrôle périodique",[68,3156,3158],{"id":3157},"la-périodicité-dépend-de-lhistorique","La périodicité dépend de l'historique",[11,3160,3161],{},"Dire que toute ancienne installation est contrôlée automatiquement tous les 25 ans est trop général. Le SPF Économie distingue les installations déjà contrôlées sous le RGIE et les anciennes installations d'avant le 1er octobre 1981 sans cet historique. Vente, modification ou extension importante, renforcement et conditions d'un rapport antérieur peuvent entraîner des visites et délais différents. Vérifiez le cas officiel et le dernier rapport.",[68,3163,3165],{"id":3164},"lors-dun-changement-de-propriétaire","Lors d'un changement de propriétaire",[11,3167,3168,3169,3172],{},"Lors de la ",[15,3170,3171],{},"vente d'un bien immobilier",", une attestation de contrôle valide (de moins de 25 ans) est obligatoire. Si elle n'existe pas, un contrôle doit être effectué avant la vente.",[46,3174,3175],{},[11,3176,3177,3180,3181,3184],{},[15,3178,3179],{},"Délai de 18 mois (Art. 8.4.2.2) :"," Lors de l'achat d'un bien immobilier avec un rapport de contrôle négatif, l'acheteur dispose de ",[15,3182,3183],{},"18 mois"," à compter de la date d'achat pour remédier aux défauts et faire effectuer un recontrôle.",[68,3186,3188],{"id":3187},"que-vérifie-t-on-lors-du-contrôle-périodique","Que vérifie-t-on lors du contrôle périodique ?",[140,3190,3191,3201],{},[143,3192,3193],{},[146,3194,3195,3198],{},[149,3196,3197],{},"Point de contrôle",[149,3199,3200],{},"Évaluation",[156,3202,3203,3211,3219,3226,3234,3242,3250],{},[146,3204,3205,3208],{},[161,3206,3207],{},"Inspection visuelle des câbles et connexions",[161,3209,3210],{},"Dommages, surchauffe",[146,3212,3213,3216],{},[161,3214,3215],{},"Mesure de la résistance de terre",[161,3217,3218],{},"≤ 30 Ω (seuil réglementaire selon Art. 4.2.4.3b ; au-delà, des mesures de protection supplémentaires sont nécessaires)",[146,3220,3221,3224],{},[161,3222,3223],{},"Mesure de la résistance d'isolement",[161,3225,540],{},[146,3227,3228,3231],{},[161,3229,3230],{},"Test RCD (si présent)",[161,3232,3233],{},"Temps et courant de déclenchement",[146,3235,3236,3239],{},[161,3237,3238],{},"Vérification de la protection contre les courts-circuits",[161,3240,3241],{},"Fusibles \u002F disjoncteurs présents",[146,3243,3244,3247],{},[161,3245,3246],{},"Protection contre les contacts directs",[161,3248,3249],{},"Couvercles, protection IP",[146,3251,3252,3254],{},[161,3253,2378],{},[161,3255,3256],{},"Schéma unifilaire + plan de situation présents ?",[46,3258,3259],{},[11,3260,3261,2921,3263,3266,3267,3270],{},[15,3262,2920],{},[15,3264,3265],{},"schéma unifilaire"," et un ",[15,3268,3269],{},"plan de situation"," doivent être disponibles — même s'ils doivent être établis rétroactivement.",[20,3272],{},[23,3274,3276],{"id":3275},"la-règle-de-contamination-lors-dune-rénovation-partielle","La règle de contamination lors d'une rénovation partielle",[11,3278,3279,3280,282],{},"Un aspect particulièrement important pour les anciens bâtiments : la ",[15,3281,3282],{},"règle de contamination",[68,3284,3286],{"id":3285},"comment-fonctionne-t-elle","Comment fonctionne-t-elle ?",[11,3288,3289,3290,3293],{},"Lorsque vous modifiez ",[15,3291,3292],{},"substantiellement"," une partie de votre installation (par ex. ajout de nouveaux circuits) :",[613,3295,3296,3303,3309],{},[94,3297,3298,3299,3302],{},"La ",[15,3300,3301],{},"nouvelle partie"," doit entièrement répondre au RGIE actuel.",[94,3304,3298,3305,3308],{},[15,3306,3307],{},"partie existante"," continue d'être évaluée selon la Partie 8.",[94,3310,3311,3314],{},[15,3312,3313],{},"MAIS :"," Si la nouvelle partie « contamine » la partie existante (par ex. nouveaux câbles dans le même tableau), le contrôleur peut décider que l'ensemble du tableau doit répondre au RGIE actuel.",[68,3316,3318],{"id":3317},"conséquences-pratiques","Conséquences pratiques :",[91,3320,3321,3327,3334],{},[94,3322,3323,3324,282],{},"Planifiez les rénovations de manière à ce que les parties nouvelles et anciennes soient ",[15,3325,3326],{},"clairement séparées",[94,3328,3329,3330,3333],{},"Idéalement, un ",[15,3331,3332],{},"sous-tableau séparé"," pour les nouveaux circuits.",[94,3335,3336],{},"Documentez précisément ce qui est ancien et ce qui est nouveau.",[20,3338],{},[23,3340,3342],{"id":3341},"recommandation-modernisation-progressive","Recommandation : Modernisation progressive",[11,3344,3345,3346,3349],{},"Même si la Partie 8 tolère des dérogations, une ",[15,3347,3348],{},"modernisation progressive"," est recommandée :",[68,3351,3353],{"id":3352},"priorité-1-critique-pour-la-sécurité","Priorité 1 (Critique pour la sécurité)",[91,3355,3356,3359,3362,3365],{},[94,3357,3358],{},"Installer un différentiel principal 300 mA (s'il est absent)",[94,3360,3361],{},"Remplacer les câbles endommagés",[94,3363,3364],{},"Réparer les connexions desserrées",[94,3366,3367],{},"Vérifier et améliorer la mise à la terre si nécessaire",[68,3369,3371],{"id":3370},"priorité-2-recommandé","Priorité 2 (Recommandé)",[91,3373,3374,3377,3380],{},[94,3375,3376],{},"Différentiels de groupe 30 mA pour salle de bain et cuisine",[94,3378,3379],{},"Remplacer les anciens fusibles par des disjoncteurs",[94,3381,3382],{},"Installer un parafoudre Type 2",[68,3384,3386],{"id":3385},"priorité-3-confort-pérennité","Priorité 3 (Confort + pérennité)",[91,3388,3389,3392,3395],{},[94,3390,3391],{},"Moderniser le tableau (plus de rangées, étiquetage)",[94,3393,3394],{},"Installer des prises avec terre",[94,3396,3397],{},"Préparation pour borne de recharge \u002F installation PV",[68,3399,3401],{"id":3400},"définir-les-travaux-avant-de-chiffrer","Définir les travaux avant de chiffrer",[11,3403,3404],{},"Une fourchette générique en ligne n'est pas un budget fiable. Faites inventorier l'installation, séparez les défauts de sécurité des améliorations facultatives et demandez une offre datée pour le bâtiment réel. Tracés, finitions, accès, état du tableau et ampleur de rénovation modifient fortement le travail.",[23,3406,3408],{"id":3407},"résumé","Résumé",[140,3410,3411,3420],{},[143,3412,3413],{},[146,3414,3415,3417],{},[149,3416,2542],{},[149,3418,3419],{},"Réponse",[156,3421,3422,3430,3438,3446,3454],{},[146,3423,3424,3427],{},[161,3425,3426],{},"Mon ancien bâtiment doit-il répondre au RGIE actuel ?",[161,3428,3429],{},"Pas entièrement, la Partie 8 autorise des dérogations",[146,3431,3432,3435],{},[161,3433,3434],{},"Ai-je besoin d'un différentiel 30 mA ?",[161,3436,3437],{},"Pas obligatoire sous Partie 8, mais fortement recommandé",[146,3439,3440,3443],{},[161,3441,3442],{},"Les anciennes prises sans terre sont-elles autorisées ?",[161,3444,3445],{},"Sous conditions oui (pas de salle de bain, pas d'appareils classe I)",[146,3447,3448,3451],{},[161,3449,3450],{},"À quelle fréquence faut-il contrôler ?",[161,3452,3453],{},"Selon l'historique et le motif ; la vente suit son cas précis",[146,3455,3456,3459],{},[161,3457,3458],{},"Que se passe-t-il en cas de rénovation partielle ?",[161,3460,3461],{},"Nouvelle partie = RGIE actuel, ancienne = Partie 8 (règle de contamination)",[20,3463],{},[23,3465,3467],{"id":3466},"articles-connexes","Articles connexes",[91,3469,3470,3476,3482,3488],{},[94,3471,3472],{},[795,3473,3475],{"href":3474},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique : Que vérifie-t-on ?",[94,3477,3478],{},[795,3479,3481],{"href":3480},"\u002Ffr\u002Fblog\u002Frgie-2026-changements","Que change le RGIE 2026 ?",[94,3483,3484],{},[795,3485,3487],{"href":3486},"\u002Ffr\u002Fblog\u002Fpreflex-vs-pose-libre","Preflex vs. pose libre",[94,3489,3490],{},[795,3491,3493],{"href":3492},"\u002Ffr\u002Fblog\u002Fplanifier-tableau-electrique","Planifier un tableau électrique",[20,3495],{},[11,3497,3498],{},[822,3499,3500,3501,3503,3504],{},"Même pour les anciens bâtiments, ",[15,3502,827],{}," aide à construire numériquement le schéma unifilaire et le plan de situation. L'auto-contrôle est indicatif ; faites vérifier les documents et les dérogations applicables par un professionnel. ",[795,3505,3506],{"href":831},"Commencer gratuitement →",[23,3508,3510],{"id":3509},"établir-lhistorique-avant-dinvoquer-une-dérogation","Établir l'historique avant d'invoquer une dérogation",[11,3512,3513],{},"L'âge du bâtiment ne suffit pas. Constituez une chronologie à partir des rapports, étiquettes de tableau, factures, permis et éléments visibles. Identifiez les parties antérieures au 1er octobre 1981, les modifications ou extensions ultérieures et leur éventuel contrôle de conformité. La partie 8 définit les anciennes installations et des dérogations précises ; elle n'exempte pas automatiquement chaque composant d'une vieille maison.",[11,3515,3516],{},"Marquez parties anciennes et nouvelles sur une copie du schéma. Pour chaque dérogation envisagée, notez la disposition V06 exacte, le circuit, la preuve d'âge et les conditions de sécurité restantes. Sans preuve, indiquez « inconnu » : couleur et aspect d'un câble ne datent pas sûrement une pose. L'organisme agréé statue sur l'application au cas réel.",[11,3518,3519],{},"N'utilisez pas la « règle de contamination » informelle comme un article du RGIE. Une modification ou extension importante est appréciée selon les dispositions actuelles applicables ; le statut de l'existant dépend des définitions, du champ et de l'historique. Un tableau ou des protections communs rendent la limite importante, mais son étendue vient du règlement et du projet, pas d'un slogan. Consultez l'organisme avant travaux si cette limite commande la rénovation.",[11,3521,3522,3523,3527],{},"Lors d'une vente, suivez la ",[795,3524,3526],{"href":2651,"rel":3525},[853],"FAQ du SPF Économie",". Elle distingue obligations du vendeur, communication de l'acheteur et parcours de 18 mois après rapport négatif. Ce parcours ne se confond pas avec le suivi de 12 mois d'autres contrôles. Date de l'acte et type de rapport comptent.",[11,3529,3530],{},"Le dossier transmis contient schémas actuels, rapports, déclarations, notices et modifications. PlanElec aide à garder les références cohérentes sans décider l'éligibilité d'une dérogation ni couvrir tous les cas. Revue du 29 août 2026 selon le Livre 1 V06 et la page SPF du 1er avril 2026.",{"title":877,"searchDepth":878,"depth":878,"links":3532},[3533,3534,3539,3547,3551,3556,3560,3566,3567,3568],{"id":2726,"depth":878,"text":2727},{"id":2758,"depth":878,"text":2759,"children":3535},[3536,3537,3538],{"id":2769,"depth":884,"text":2770},{"id":2776,"depth":884,"text":2777},{"id":2787,"depth":884,"text":2788},{"id":2827,"depth":878,"text":2828,"children":3540},[3541,3542,3543,3544,3545,3546],{"id":2834,"depth":884,"text":2835},{"id":2876,"depth":884,"text":2877},{"id":2928,"depth":884,"text":2929},{"id":2964,"depth":884,"text":2965},{"id":2974,"depth":884,"text":2975},{"id":3000,"depth":884,"text":3001},{"id":3009,"depth":878,"text":3010,"children":3548},[3549,3550],{"id":3020,"depth":884,"text":3021},{"id":3118,"depth":884,"text":3119},{"id":3153,"depth":878,"text":3154,"children":3552},[3553,3554,3555],{"id":3157,"depth":884,"text":3158},{"id":3164,"depth":884,"text":3165},{"id":3187,"depth":884,"text":3188},{"id":3275,"depth":878,"text":3276,"children":3557},[3558,3559],{"id":3285,"depth":884,"text":3286},{"id":3317,"depth":884,"text":3318},{"id":3341,"depth":878,"text":3342,"children":3561},[3562,3563,3564,3565],{"id":3352,"depth":884,"text":3353},{"id":3370,"depth":884,"text":3371},{"id":3385,"depth":884,"text":3386},{"id":3400,"depth":884,"text":3401},{"id":3407,"depth":878,"text":3408},{"id":3466,"depth":878,"text":3467},{"id":3509,"depth":878,"text":3510},"Ce qui s'applique aux anciennes installations électriques en Belgique. RGIE Partie 8 expliqué : dérogations autorisées, contrôle périodique et conseils pour une modernisation progressive.","fr",{},"\u002Fblog\u002Fold-building-arei-part8.fr",{"title":2712,"description":3569},"ancien-rgie-part-8","blog\u002Fold-building-arei-part8.fr",[3577,3578,2720,3579,3580,3581,3582],"ancien bâtiment","RGIE","installation existante","rénovation","contrôle","périodique","Bz0szqbDbhaeeN40Eg5eez-MOaxzuNjDvXHgqEY6PkI",{"id":4,"title":5,"articleId":6,"body":3585,"category":920,"date":921,"description":922,"extension":923,"lastUpdated":924,"locale":925,"meta":4209,"navigation":927,"path":928,"publishDate":921,"readTime":929,"refreshInterval":930,"seo":4210,"slug":932,"stem":933,"tags":4211,"__hash__":942},{"type":8,"value":3586,"toc":4168},[3587,3591,3593,3595,3599,3605,3611,3613,3615,3619,3621,3623,3625,3629,3631,3649,3655,3657,3659,3661,3663,3693,3695,3725,3733,3735,3737,3755,3757,3761,3763,3777,3779,3781,3783,3785,3789,3791,3867,3869,3871,3889,3891,3893,3895,3899,3901,3905,3913,3915,3969,3979,3981,3983,3987,3989,3993,4007,4009,4021,4023,4025,4029,4031,4041,4043,4051,4053,4061,4063,4065,4067,4069,4111,4113,4115,4133,4135,4143,4145,4147,4149,4151,4156,4158,4160,4162,4164,4166],[11,3588,13,3589,18],{},[15,3590,17],{},[20,3592],{},[23,3594,26],{"id":25},[11,3596,29,3597,33],{},[15,3598,32],{},[11,3600,36,3601,40,3603,44],{},[15,3602,39],{},[15,3604,43],{},[46,3606,3607],{},[11,3608,3609,53],{},[15,3610,52],{},[20,3612],{},[23,3614,59],{"id":58},[11,3616,62,3617,66],{},[15,3618,65],{},[68,3620,71],{"id":70},[11,3622,74],{},[68,3624,78],{"id":77},[11,3626,81,3627,85],{},[15,3628,84],{},[68,3630,89],{"id":88},[91,3632,3633,3637,3641,3645],{},[94,3634,96,3635],{},[15,3636,99],{},[94,3638,102,3639],{},[15,3640,105],{},[94,3642,108,3643],{},[15,3644,111],{},[94,3646,114,3647],{},[15,3648,117],{},[46,3650,3651],{},[11,3652,3653,125],{},[15,3654,124],{},[20,3656],{},[23,3658,131],{"id":130},[11,3660,134],{},[68,3662,138],{"id":137},[140,3664,3665,3673],{},[143,3666,3667],{},[146,3668,3669,3671],{},[149,3670,151],{},[149,3672,154],{},[156,3674,3675,3681,3687],{},[146,3676,3677,3679],{},[161,3678,163],{},[161,3680,166],{},[146,3682,3683,3685],{},[161,3684,171],{},[161,3686,174],{},[146,3688,3689,3691],{},[161,3690,179],{},[161,3692,182],{},[68,3694,186],{"id":185},[140,3696,3697,3705],{},[143,3698,3699],{},[146,3700,3701,3703],{},[149,3702,151],{},[149,3704,154],{},[156,3706,3707,3713,3719],{},[146,3708,3709,3711],{},[161,3710,203],{},[161,3712,206],{},[146,3714,3715,3717],{},[161,3716,211],{},[161,3718,214],{},[146,3720,3721,3723],{},[161,3722,219],{},[161,3724,222],{},[46,3726,3727],{},[11,3728,3729,230,3731,234],{},[15,3730,229],{},[15,3732,233],{},[68,3734,238],{"id":237},[11,3736,241],{},[91,3738,3739,3743,3747,3753],{},[94,3740,246,3741,250],{},[15,3742,249],{},[94,3744,253,3745,257],{},[15,3746,256],{},[94,3748,260,3749,264,3751,268],{},[15,3750,263],{},[15,3752,267],{},[94,3754,271],{},[68,3756,275],{"id":274},[11,3758,278,3759,282],{},[15,3760,281],{},[68,3762,286],{"id":285},[91,3764,3765,3769,3773],{},[94,3766,3767,294],{},[15,3768,293],{},[94,3770,3771,300],{},[15,3772,299],{},[94,3774,303,3775,307],{},[15,3776,306],{},[68,3778,311],{"id":310},[11,3780,314],{},[20,3782],{},[23,3784,320],{"id":319},[11,3786,323,3787,327],{},[15,3788,326],{},[68,3790,331],{"id":330},[140,3792,3793,3801],{},[143,3794,3795],{},[146,3796,3797,3799],{},[149,3798,340],{},[149,3800,343],{},[156,3802,3803,3811,3819,3827,3835,3843,3851,3859],{},[146,3804,3805,3809],{},[161,3806,3807],{},[15,3808,352],{},[161,3810,355],{},[146,3812,3813,3817],{},[161,3814,3815],{},[15,3816,362],{},[161,3818,365],{},[146,3820,3821,3825],{},[161,3822,3823],{},[15,3824,372],{},[161,3826,375],{},[146,3828,3829,3833],{},[161,3830,3831],{},[15,3832,382],{},[161,3834,385],{},[146,3836,3837,3841],{},[161,3838,3839],{},[15,3840,392],{},[161,3842,395],{},[146,3844,3845,3849],{},[161,3846,3847],{},[15,3848,402],{},[161,3850,405],{},[146,3852,3853,3857],{},[161,3854,3855],{},[15,3856,412],{},[161,3858,415],{},[146,3860,3861,3865],{},[161,3862,3863],{},[15,3864,422],{},[161,3866,425],{},[68,3868,429],{"id":428},[11,3870,432],{},[91,3872,3873,3877,3881,3885],{},[94,3874,3875,440],{},[15,3876,439],{},[94,3878,3879,446],{},[15,3880,445],{},[94,3882,3883,452],{},[15,3884,451],{},[94,3886,3887,458],{},[15,3888,457],{},[20,3890],{},[23,3892,464],{"id":463},[68,3894,468],{"id":467},[11,3896,471,3897,475],{},[15,3898,474],{},[68,3900,479],{"id":478},[11,3902,482,3903,486],{},[15,3904,485],{},[46,3906,3907],{},[11,3908,3909,494,3911,498],{},[15,3910,493],{},[15,3912,497],{},[68,3914,502],{"id":501},[140,3916,3917,3925],{},[143,3918,3919],{},[146,3920,3921,3923],{},[149,3922,511],{},[149,3924,514],{},[156,3926,3927,3933,3939,3945,3951,3957,3963],{},[146,3928,3929,3931],{},[161,3930,521],{},[161,3932,524],{},[146,3934,3935,3937],{},[161,3936,529],{},[161,3938,532],{},[146,3940,3941,3943],{},[161,3942,537],{},[161,3944,540],{},[146,3946,3947,3949],{},[161,3948,545],{},[161,3950,548],{},[146,3952,3953,3955],{},[161,3954,553],{},[161,3956,556],{},[146,3958,3959,3961],{},[161,3960,561],{},[161,3962,564],{},[146,3964,3965,3967],{},[161,3966,569],{},[161,3968,572],{},[46,3970,3971],{},[11,3972,3973,579,3975,583,3977,587],{},[15,3974,229],{},[15,3976,582],{},[15,3978,586],{},[20,3980],{},[23,3982,593],{"id":592},[11,3984,596,3985,600],{},[15,3986,599],{},[68,3988,604],{"id":603},[11,3990,607,3991,611],{},[15,3992,610],{},[613,3994,3995,3999,4003],{},[94,3996,617,3997,621],{},[15,3998,620],{},[94,4000,617,4001,627],{},[15,4002,626],{},[94,4004,4005,633],{},[15,4006,632],{},[68,4008,637],{"id":636},[91,4010,4011,4015,4019],{},[94,4012,642,4013,85],{},[15,4014,645],{},[94,4016,648,4017,652],{},[15,4018,651],{},[94,4020,655],{},[20,4022],{},[23,4024,661],{"id":660},[11,4026,664,4027,668],{},[15,4028,667],{},[68,4030,672],{"id":671},[91,4032,4033,4035,4037,4039],{},[94,4034,677],{},[94,4036,680],{},[94,4038,683],{},[94,4040,686],{},[68,4042,690],{"id":689},[91,4044,4045,4047,4049],{},[94,4046,695],{},[94,4048,698],{},[94,4050,701],{},[68,4052,705],{"id":704},[91,4054,4055,4057,4059],{},[94,4056,710],{},[94,4058,713],{},[94,4060,716],{},[68,4062,720],{"id":719},[11,4064,723],{},[20,4066],{},[23,4068,729],{"id":728},[140,4070,4071,4079],{},[143,4072,4073],{},[146,4074,4075,4077],{},[149,4076,738],{},[149,4078,741],{},[156,4080,4081,4087,4093,4099,4105],{},[146,4082,4083,4085],{},[161,4084,748],{},[161,4086,751],{},[146,4088,4089,4091],{},[161,4090,756],{},[161,4092,759],{},[146,4094,4095,4097],{},[161,4096,764],{},[161,4098,767],{},[146,4100,4101,4103],{},[161,4102,772],{},[161,4104,775],{},[146,4106,4107,4109],{},[161,4108,780],{},[161,4110,783],{},[20,4112],{},[23,4114,789],{"id":788},[91,4116,4117,4121,4125,4129],{},[94,4118,4119],{},[795,4120,798],{"href":797},[94,4122,4123],{},[795,4124,804],{"href":803},[94,4126,4127],{},[795,4128,810],{"href":809},[94,4130,4131],{},[795,4132,816],{"href":815},[20,4134],{},[11,4136,4137],{},[822,4138,824,4139,828,4141],{},[15,4140,827],{},[795,4142,832],{"href":831},[23,4144,836],{"id":835},[11,4146,839],{},[11,4148,842],{},[11,4150,845],{},[11,4152,848,4153,855],{},[795,4154,854],{"href":851,"rel":4155},[853],[11,4157,858],{},[68,4159,862],{"id":861},[11,4161,865],{},[68,4163,869],{"id":868},[11,4165,872],{},[11,4167,875],{},{"title":877,"searchDepth":878,"depth":878,"links":4169},[4170,4171,4176,4184,4188,4193,4197,4203,4204,4205],{"id":25,"depth":878,"text":26},{"id":58,"depth":878,"text":59,"children":4172},[4173,4174,4175],{"id":70,"depth":884,"text":71},{"id":77,"depth":884,"text":78},{"id":88,"depth":884,"text":89},{"id":130,"depth":878,"text":131,"children":4177},[4178,4179,4180,4181,4182,4183],{"id":137,"depth":884,"text":138},{"id":185,"depth":884,"text":186},{"id":237,"depth":884,"text":238},{"id":274,"depth":884,"text":275},{"id":285,"depth":884,"text":286},{"id":310,"depth":884,"text":311},{"id":319,"depth":878,"text":320,"children":4185},[4186,4187],{"id":330,"depth":884,"text":331},{"id":428,"depth":884,"text":429},{"id":463,"depth":878,"text":464,"children":4189},[4190,4191,4192],{"id":467,"depth":884,"text":468},{"id":478,"depth":884,"text":479},{"id":501,"depth":884,"text":502},{"id":592,"depth":878,"text":593,"children":4194},[4195,4196],{"id":603,"depth":884,"text":604},{"id":636,"depth":884,"text":637},{"id":660,"depth":878,"text":661,"children":4198},[4199,4200,4201,4202],{"id":671,"depth":884,"text":672},{"id":689,"depth":884,"text":690},{"id":704,"depth":884,"text":705},{"id":719,"depth":884,"text":720},{"id":728,"depth":878,"text":729},{"id":788,"depth":878,"text":789},{"id":835,"depth":878,"text":836,"children":4206},[4207,4208],{"id":861,"depth":884,"text":862},{"id":868,"depth":884,"text":869},{},{"title":5,"description":922},[935,936,937,938,939,940,941],1788389247164]