[{"data":1,"prerenderedAt":1258},["ShallowReactive",2],{"blog-post-nl-inspectie-checklist":3,"blog-alternates-inspection-checklist":304},{"id":4,"title":5,"articleId":6,"body":7,"category":273,"date":274,"description":275,"extension":276,"lastUpdated":277,"locale":278,"meta":279,"navigation":280,"path":281,"publishDate":274,"readTime":282,"refreshInterval":283,"seo":284,"slug":285,"stem":286,"tags":287,"__hash__":303},"blog\u002Fblog\u002Finspection-checklist.nl.md","Wat controleert de keurder bij een elektrische keuring?","inspection-checklist",{"type":8,"value":9,"toc":262},"minimark",[10,15,19,23,26,55,64,68,71,124,128,131,209,213,220,224,239,245,249,252],[11,12,14],"h2",{"id":13},"drie-domeinen-documentatie-visuele-controle-metingen","Drie domeinen: documentatie, visuele controle, metingen",[16,17,18],"p",{},"Een erkend controleorganisme beoordeelt de documenten, de zichtbare installatie en de voorziene proeven of metingen. Volgorde en besluit behoren tot het controleorganisme; ontbrekende stukken worden getoetst aan de toepasselijke dossierplichten.",[11,20,22],{"id":21},"_1-documentatie","1. Documentatie",[16,24,25],{},"De keurder vereist de volgende documenten:",[27,28,29,37,43,49],"ul",{},[30,31,32,36],"li",{},[33,34,35],"strong",{},"Eendraadschema"," — aanwezig, volledig en up-to-date?",[30,38,39,42],{},[33,40,41],{},"Situatieplan"," — plattegrond met stopcontacten, schakelaars en lichtpunten?",[30,44,45,48],{},[33,46,47],{},"Conformiteitsverklaring"," van de installateur?",[30,50,51,54],{},[33,52,53],{},"Technische fiches"," — verdeelbord, differentieelschakelaars, automaten?",[56,57,58],"blockquote",{},[16,59,60,63],{},[33,61,62],{},"Bereid eerst het dossier voor:"," een ontbrekend of verouderd schema kan een inbreuk opleveren. Daaruit volgt geen vaste bezoekvolgorde voor elk controleorganisme.",[11,65,67],{"id":66},"_2-visuele-controle","2. Visuele controle",[16,69,70],{},"Vervolgens controleert de keurder de installatie visueel:",[27,72,73,80,86,92,98,105,112,118],{},[30,74,75,76,79],{},"Correcte ",[33,77,78],{},"kabeldoorsnede"," per automaat? (bv. min. 2,5 mm² bij 16A)",[30,81,82,85],{},[33,83,84],{},"30mA differentieel"," aanwezig voor alle stopcontactkringen?",[30,87,88,91],{},[33,89,90],{},"Badkamerzones"," gerespecteerd? (Zone 0, 1, 2 volgens AREI Art. 7.1, zone-definities Art. 7.1.3.2)",[30,93,94,97],{},[33,95,96],{},"Aardingsaansluiting"," aanwezig en toegankelijk?",[30,99,100,101,104],{},"Alle ",[33,102,103],{},"aftakdozen"," gesloten?",[30,106,107,108,111],{},"Kabels correct ",[33,109,110],{},"bevestigd"," en beschermd?",[30,113,114,117],{},[33,115,116],{},"Hoofdschakelaar"," aanwezig en vrij toegankelijk?",[30,119,120,123],{},[33,121,122],{},"Overspanningsbeveiliging (SPD)"," aanwezig? (Art. 4.5.1 vereist in het algemeen bescherming tegen overspanningen volgens de regels van het vak — in de praktijk wordt een SPD Type 2 aanbevolen)",[11,125,127],{"id":126},"_3-metingen","3. Metingen",[16,129,130],{},"Tot slot voert de keurder technische metingen uit:",[132,133,134,150],"table",{},[135,136,137],"thead",{},[138,139,140,144,147],"tr",{},[141,142,143],"th",{},"Meting",[141,145,146],{},"Grenswaarde",[141,148,149],{},"Instrument",[151,152,153,165,176,187,198],"tbody",{},[138,154,155,159,162],{},[156,157,158],"td",{},"Aardingsweerstand",[156,160,161],{},"\u003C 100 Ohm (Art. 4.2.4.3 a\u002Fb); boven 30 Ohm minstens twee differentieelschakelaars met hoge gevoeligheid vereist",[156,163,164],{},"Aardingsmeter",[138,166,167,170,173],{},[156,168,169],{},"Isolatieweerstand",[156,171,172],{},"> 0,5 MOhm",[156,174,175],{},"Megger (isolatiemeter)",[138,177,178,181,184],{},[156,179,180],{},"Lusimpedantie",[156,182,183],{},"Afhankelijk van nominale stroom MCB",[156,185,186],{},"Lusimpedantiemeter",[138,188,189,192,195],{},[156,190,191],{},"Uitschakeltijd differentieel",[156,193,194],{},"\u003C 300 ms (300mA) \u002F \u003C 40 ms (30mA)",[156,196,197],{},"Differentieeltester",[138,199,200,203,206],{},[156,201,202],{},"Spanningsmeting",[156,204,205],{},"230V ±10%",[156,207,208],{},"Multimeter",[11,210,212],{"id":211},"resultaat","Resultaat",[16,214,215,216,219],{},"Na de keuring ontvangt u een ",[33,217,218],{},"keuringsverslag",". Bij nieuwbouw en grote renovaties moet de keuring geslaagd zijn voordat de netbeheerder de elektriciteitsaansluiting activeert. Bij gebreken krijgt u een termijn voor herstellingen en moet u een herkeuring laten uitvoeren.",[11,221,223],{"id":222},"gerelateerde-artikelen","Gerelateerde artikelen",[27,225,226,233],{},[30,227,228],{},[229,230,232],"a",{"href":231},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring in België — wat u moet weten",[30,234,235],{},[229,236,238],{"href":237},"\u002Fblog\u002Fstopcontacten-per-circuit","Hoeveel stopcontacten per stroomkring? (AREI-limieten)",[16,240,241],{},[229,242,244],{"href":243},"\u002F","Maak nu uw AREI-conform eendraadschema — gratis →",[11,246,248],{"id":247},"een-controleerbaar-dossier-voorbereiden","Een controleerbaar dossier voorbereiden",[16,250,251],{},"Vergelijk vóór de afspraak het eendraadschema en situatieschema met de werkelijk uitgevoerde installatie. Gebruik in beide documenten dezelfde kringletters en puntnummers, label het bord, houd afschermingen bereikbaar en verzamel eerdere verslagen en bijbehorende fabrikantdocumentatie. Open geen delen onder spanning om het bezoek voor te bereiden.",[16,253,254,255,261],{},"De officiële referentie is de ",[229,256,260],{"href":257,"rel":258},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fthemas\u002Fenergie\u002Fbronnen-en-dragers-van-energie\u002Felektriciteit\u002Fveiligheid-en-controle-van\u002Fcontrole-van-huishoudelijke",[259],"nofollow","FOD Economie-pagina over controle van huishoudelijke installaties",". Het verslag van het controleorganisme — niet deze checklist of de indicatieve PlanElec-zelfcontrole — bepaalt de vaststellingen en eventuele vervolgtermijn.",{"title":263,"searchDepth":264,"depth":264,"links":265},"",2,[266,267,268,269,270,271,272],{"id":13,"depth":264,"text":14},{"id":21,"depth":264,"text":22},{"id":66,"depth":264,"text":67},{"id":126,"depth":264,"text":127},{"id":211,"depth":264,"text":212},{"id":222,"depth":264,"text":223},{"id":247,"depth":264,"text":248},"faq","2026-03-13","Documentatie, visuele controle, metingen — ontdek punt voor punt wat de keurder effectief controleert en meet bij een elektrische keuring in België.","md","2026-08-29","nl",{},true,"\u002Fblog\u002Finspection-checklist.nl","4 min",12,{"title":5,"description":275},"inspectie-checklist","blog\u002Finspection-checklist.nl",[288,289,290,291,292,293,294,295,296,297,298,299,300,301,302],"AREI","RGIE","keuring","checklist","eendraadschema","situatieschema","differentieel","aardingsweerstand","isolatieweerstand","automaat","België","Eindrahtschema","schéma unifilaire","plan de situation","Situationsplan","yMnIHesiCA1LgwvMyZMWVbOrmodIJtLtMKtzOYJNVOg",[305,563,826,1084],{"id":306,"title":307,"articleId":6,"body":308,"category":273,"date":274,"description":549,"extension":276,"lastUpdated":277,"locale":550,"meta":551,"navigation":280,"path":552,"publishDate":274,"readTime":282,"refreshInterval":283,"seo":553,"slug":554,"stem":555,"tags":556,"__hash__":562},"blog\u002Fblog\u002Finspection-checklist.de.md","Was prüft der Kontrolleur bei der Stromabnahme?",{"type":8,"value":309,"toc":540},[310,314,317,321,324,348,356,360,363,415,419,422,490,494,501,505,519,524,528,531],[11,311,313],{"id":312},"drei-bereiche-dokumentation-sichtprüfung-messungen","Drei Bereiche: Dokumentation, Sichtprüfung, Messungen",[16,315,316],{},"Ein zugelassener Kontrollorganismus beurteilt Unterlagen, sichtbare Anlage und die vorgesehenen Prüfungen beziehungsweise Messungen. Reihenfolge und Schlussfolgerung liegen beim Kontrollorganismus; fehlende Unterlagen werden anhand der einschlägigen Dossierpflichten bewertet.",[11,318,320],{"id":319},"_1-dokumentation","1. Dokumentation",[16,322,323],{},"Der Kontrolleur verlangt folgende Unterlagen:",[27,325,326,331,336,342],{},[30,327,328,330],{},[33,329,299],{}," — vorhanden, vollständig und aktuell?",[30,332,333,335],{},[33,334,302],{}," — Raumplan mit eingezeichneten Steckdosen, Schaltern und Leuchten?",[30,337,338,341],{},[33,339,340],{},"Konformitätserklärung"," des Installateurs?",[30,343,344,347],{},[33,345,346],{},"Technische Datenblätter"," — Schaltschrank, FI-Schutzschalter, Sicherungsautomaten?",[56,349,350],{},[16,351,352,355],{},[33,353,354],{},"Dossier zuerst vorbereiten:"," Ein fehlendes oder veraltetes Schema kann zu einer Beanstandung führen. Daraus lässt sich aber kein pauschaler Ablauf jeder Kontrolle ableiten.",[11,357,359],{"id":358},"_2-sichtprüfung","2. Sichtprüfung",[16,361,362],{},"Anschließend kontrolliert der Prüfer die Installation visuell:",[27,364,365,372,378,384,390,396,403,409],{},[30,366,367,368,371],{},"Richtiger ",[33,369,370],{},"Kabelquerschnitt"," pro Sicherung? (z.B. min. 2,5 mm² bei 16 A für Steckdosenstromkreise; für Beleuchtung reicht 1,5 mm² bei 16 A)",[30,373,374,377],{},[33,375,376],{},"30mA-FI-Schutzschalter"," für alle Steckdosenstromkreise vorhanden?",[30,379,380,383],{},[33,381,382],{},"Badezimmerzonen"," eingehalten? (Bereich 0, 1, 2 gemäß AREI Art. 7.1, Bereichsdefinitionen Art. 7.1.3.2)",[30,385,386,389],{},[33,387,388],{},"Erdungsanschluss"," vorhanden und zugänglich?",[30,391,100,392,395],{},[33,393,394],{},"Abzweigdosen"," geschlossen?",[30,397,398,399,402],{},"Kabel ordnungsgemäß ",[33,400,401],{},"befestigt"," und geschützt?",[30,404,405,408],{},[33,406,407],{},"Hauptschalter"," vorhanden und frei zugänglich?",[30,410,411,414],{},[33,412,413],{},"Überspannungsschutz (SPD)"," vorhanden? (Art. 4.5.1 verlangt allgemein Schutz vor Überspannungen nach den Regeln des Fachs — in der Praxis wird ein SPD Typ 2 empfohlen)",[11,416,418],{"id":417},"_3-messungen","3. Messungen",[16,420,421],{},"Zum Abschluss führt der Kontrolleur technische Messungen durch:",[132,423,424,436],{},[135,425,426],{},[138,427,428,431,434],{},[141,429,430],{},"Messung",[141,432,433],{},"Grenzwert",[141,435,149],{},[151,437,438,449,459,470,481],{},[138,439,440,443,446],{},[156,441,442],{},"Erdungswiderstand",[156,444,445],{},"\u003C 100 Ohm (Art. 4.2.4.3 a\u002Fb); ab > 30 Ohm mind. zwei FI hoher Empfindlichkeit erforderlich",[156,447,448],{},"Erdungsmessgerät",[138,450,451,454,456],{},[156,452,453],{},"Isolationswiderstand",[156,455,172],{},[156,457,458],{},"Megger (Isolationsmessgerät)",[138,460,461,464,467],{},[156,462,463],{},"Schleifenimpedanz",[156,465,466],{},"Je nach MCB-Nennstrom",[156,468,469],{},"Schleifenimpedanzmessgerät",[138,471,472,475,478],{},[156,473,474],{},"FI-Auslösezeit",[156,476,477],{},"\u003C 300 ms bei Nennfehlerstrom I∆n, \u003C 40 ms bei 5× I∆n (gemäß IEC 61008)",[156,479,480],{},"FI-Tester",[138,482,483,486,488],{},[156,484,485],{},"Spannungsmessung",[156,487,205],{},[156,489,208],{},[11,491,493],{"id":492},"ergebnis","Ergebnis",[16,495,496,497,500],{},"Nach der Prüfung erhalten Sie einen ",[33,498,499],{},"Kontrollbericht",". Bei Neubauten und größeren Renovierungen muss die Abnahme bestanden werden, bevor der Netzbetreiber den Stromanschluss freischaltet. Bei Mängeln erhalten Sie eine Frist zur Nachbesserung und müssen eine erneute Kontrolle beauftragen.",[11,502,504],{"id":503},"verwandte-artikel","Verwandte Artikel",[27,506,507,513],{},[30,508,509],{},[229,510,512],{"href":511},"\u002Fde\u002Fblog\u002Felektrische-abnahme","Elektrische Abnahme in Belgien — was Sie wissen müssen",[30,514,515],{},[229,516,518],{"href":517},"\u002Fde\u002Fblog\u002Fsteckdosen-pro-stromkreis","Wie viele Steckdosen pro Stromkreis? (AREI-Grenzwerte)",[16,520,521],{},[229,522,523],{"href":243},"Erstellen Sie jetzt Ihr AREI-konformes Eindrahtschema — kostenlos →",[11,525,527],{"id":526},"ein-nachvollziehbares-dossier-vorbereiten","Ein nachvollziehbares Dossier vorbereiten",[16,529,530],{},"Vergleichen Sie vor dem Termin Eindrahtschema und Situationsplan mit dem tatsächlichen Bestand. Verwenden Sie in beiden Unterlagen dieselben Stromkreis-Buchstaben und Punktnummern, beschriften Sie den Verteiler, halten Sie Abdeckungen zugänglich und legen Sie frühere Berichte sowie zugehörige Herstellerunterlagen bereit. Öffnen Sie zur Vorbereitung keine unter Spannung stehenden Teile.",[16,532,533,534,539],{},"Maßgeblich sind die ",[229,535,538],{"href":536,"rel":537},"https:\u002F\u002Feconomie.fgov.be\u002Fde\u002Fthemen\u002Fenergie\u002Fsicherheit-und-kontrolle\u002Fkontrolle-von-elektrischen",[259],"Hinweise des FÖD Wirtschaft zur Kontrolle häuslicher Anlagen",". Der Bericht des Kontrollorganismus — nicht diese Checkliste und nicht der orientierende PlanElec-Selbstcheck — hält die Befunde und gegebenenfalls die weitere Frist fest.",{"title":263,"searchDepth":264,"depth":264,"links":541},[542,543,544,545,546,547,548],{"id":312,"depth":264,"text":313},{"id":319,"depth":264,"text":320},{"id":358,"depth":264,"text":359},{"id":417,"depth":264,"text":418},{"id":492,"depth":264,"text":493},{"id":503,"depth":264,"text":504},{"id":526,"depth":264,"text":527},"Dokumentation, Sichtprüfung, Messungen — erfahren Sie Punkt für Punkt, was der Kontrolleur bei einer elektrischen Abnahme in Belgien tatsächlich prüft und misst.","de",{},"\u002Fblog\u002Finspection-checklist.de",{"title":307,"description":549},"inspektions-checkliste","blog\u002Finspection-checklist.de",[288,289,557,558,559,299,35,302,560,442,453,561,300,301],"Stromabnahme","Keuring","Checkliste","FI-Schutzschalter","Belgien","may7IwCPxy9Dn9sEyw5vMxCkaPMCGLLyxMPb6vvfQxU",{"id":564,"title":565,"articleId":6,"body":566,"category":273,"date":274,"description":811,"extension":276,"lastUpdated":277,"locale":812,"meta":813,"navigation":280,"path":814,"publishDate":274,"readTime":282,"refreshInterval":283,"seo":815,"slug":6,"stem":816,"tags":817,"__hash__":825},"blog\u002Fblog\u002Finspection-checklist.en.md","What Does the Inspector Check During an Electrical Inspection?",{"type":8,"value":567,"toc":802},[568,572,575,579,582,608,616,620,623,676,680,683,752,756,763,767,781,786,790,793],[11,569,571],{"id":570},"three-areas-documentation-visual-inspection-measurements","Three areas: documentation, visual inspection, measurements",[16,573,574],{},"An approved control body assesses documents, the visible installation and the required tests or measurements. The exact sequence and conclusions belong to the control body; incomplete documentation is recorded against the applicable dossier requirements.",[11,576,578],{"id":577},"_1-documentation","1. Documentation",[16,580,581],{},"The inspector requires the following documents:",[27,583,584,590,596,602],{},[30,585,586,589],{},[33,587,588],{},"Single-line diagram"," — present, complete, and up to date?",[30,591,592,595],{},[33,593,594],{},"Situation plan"," — floor plan showing sockets, switches, and lights?",[30,597,598,601],{},[33,599,600],{},"Conformity declaration"," from the installer?",[30,603,604,607],{},[33,605,606],{},"Technical data sheets"," — distribution board, RCDs, circuit breakers?",[56,609,610],{},[16,611,612,615],{},[33,613,614],{},"Prepare the dossier first:"," a missing or outdated diagram can produce a negative finding. It does not justify guessing how a particular inspector will sequence the visit.",[11,617,619],{"id":618},"_2-visual-inspection","2. Visual inspection",[16,621,622],{},"Next, the inspector visually checks the installation:",[27,624,625,632,638,644,650,657,664,670],{},[30,626,627,628,631],{},"Correct ",[33,629,630],{},"cable cross-section"," per breaker? (e.g. min. 2.5 mm² at 16A for socket circuits; for lighting 1.5 mm² at 16A is sufficient)",[30,633,634,637],{},[33,635,636],{},"30mA RCD"," present for all socket circuits?",[30,639,640,643],{},[33,641,642],{},"Bathroom zones"," respected? (Zone 0, 1, 2 per AREI Art. 7.1, zone definitions Art. 7.1.3.2)",[30,645,646,649],{},[33,647,648],{},"Earth connection"," present and accessible?",[30,651,652,653,656],{},"All ",[33,654,655],{},"junction boxes"," closed?",[30,658,659,660,663],{},"Cables properly ",[33,661,662],{},"secured"," and protected?",[30,665,666,669],{},[33,667,668],{},"Main switch"," present and freely accessible?",[30,671,672,675],{},[33,673,674],{},"Surge protection device (SPD)"," present? (Art. 4.5.1 requires general protection against overvoltages according to the rules of the trade — in practice, an SPD Type 2 is recommended)",[11,677,679],{"id":678},"_3-measurements","3. Measurements",[16,681,682],{},"Finally, the inspector performs technical measurements:",[132,684,685,697],{},[135,686,687],{},[138,688,689,692,695],{},[141,690,691],{},"Measurement",[141,693,694],{},"Limit",[141,696,149],{},[151,698,699,710,721,732,743],{},[138,700,701,704,707],{},[156,702,703],{},"Earth resistance",[156,705,706],{},"\u003C 100 Ohm (Art. 4.2.4.3 a\u002Fb); above > 30 Ohm at least two high-sensitivity RCDs required",[156,708,709],{},"Earth resistance tester",[138,711,712,715,718],{},[156,713,714],{},"Insulation resistance",[156,716,717],{},"> 0.5 MOhm",[156,719,720],{},"Megger (insulation tester)",[138,722,723,726,729],{},[156,724,725],{},"Loop impedance",[156,727,728],{},"Depends on MCB rated current",[156,730,731],{},"Loop impedance tester",[138,733,734,737,740],{},[156,735,736],{},"RCD trip time",[156,738,739],{},"\u003C 300 ms at rated residual current I∆n, \u003C 40 ms at 5× I∆n (per IEC 61008)",[156,741,742],{},"RCD tester",[138,744,745,748,750],{},[156,746,747],{},"Voltage measurement",[156,749,205],{},[156,751,208],{},[11,753,755],{"id":754},"result","Result",[16,757,758,759,762],{},"After the inspection, you receive an ",[33,760,761],{},"inspection report",". For new builds and major renovations, the inspection must be passed before the grid operator activates the electricity connection. If deficiencies are found, you are given a deadline for corrections and must schedule a re-inspection.",[11,764,766],{"id":765},"related-articles","Related articles",[27,768,769,775],{},[30,770,771],{},[229,772,774],{"href":773},"\u002Fen\u002Fblog\u002Felectrical-inspection","Electrical inspection in Belgium — what you need to know",[30,776,777],{},[229,778,780],{"href":779},"\u002Fen\u002Fblog\u002Fsockets-per-circuit","How many sockets per circuit? (AREI limits)",[16,782,783],{},[229,784,785],{"href":243},"Create your AREI-compliant single-line diagram now — free →",[11,787,789],{"id":788},"prepare-an-auditable-dossier","Prepare an auditable dossier",[16,791,792],{},"Before the appointment, compare the single-line diagram and situation plan with the installation as it actually exists. Use the same circuit letters and point numbers in both documents, label the board, keep covers accessible, and collect earlier reports and manufacturer documentation that belongs to the installation file. Do not open live equipment yourself merely to prepare the visit.",[16,794,795,796,801],{},"The official reference is the ",[229,797,800],{"href":798,"rel":799},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[259],"FPS Economy guidance on domestic electrical inspections",". The control report, not this checklist or PlanElec's advisory self-check, determines the recorded findings and any follow-up deadline.",{"title":263,"searchDepth":264,"depth":264,"links":803},[804,805,806,807,808,809,810],{"id":570,"depth":264,"text":571},{"id":577,"depth":264,"text":578},{"id":618,"depth":264,"text":619},{"id":678,"depth":264,"text":679},{"id":754,"depth":264,"text":755},{"id":765,"depth":264,"text":766},{"id":788,"depth":264,"text":789},"Documentation, visual inspection, measurements — learn point by point what the inspector actually checks and measures during an electrical inspection in Belgium.","en",{},"\u002Fblog\u002Finspection-checklist.en",{"title":565,"description":811},"blog\u002Finspection-checklist.en",[288,289,818,290,291,819,292,299,300,820,302,301,821,822,823,824],"inspection","single-line diagram","situation plan","RCD","earth resistance","insulation resistance","Belgium","aTYAD7YY068FMjSIeiTCOTd2g35t5OIyYicGRW7HvWg",{"id":827,"title":828,"articleId":6,"body":829,"category":273,"date":274,"description":1070,"extension":276,"lastUpdated":277,"locale":1071,"meta":1072,"navigation":280,"path":1073,"publishDate":274,"readTime":282,"refreshInterval":283,"seo":1074,"slug":1075,"stem":1076,"tags":1077,"__hash__":1083},"blog\u002Fblog\u002Finspection-checklist.fr.md","Que vérifie le contrôleur lors du contrôle électrique ?",{"type":8,"value":830,"toc":1061},[831,835,838,840,843,869,877,881,884,936,940,943,1012,1016,1023,1027,1041,1046,1050,1053],[11,832,834],{"id":833},"trois-domaines-documentation-contrôle-visuel-mesures","Trois domaines : documentation, contrôle visuel, mesures",[16,836,837],{},"Un organisme agréé examine les documents, l'installation visible et les essais ou mesures prévus. L'ordre et les conclusions relèvent de l'organisme ; les documents manquants sont appréciés selon les obligations applicables au dossier.",[11,839,578],{"id":577},[16,841,842],{},"Le contrôleur exige les documents suivants :",[27,844,845,851,857,863],{},[30,846,847,850],{},[33,848,849],{},"Schéma unifilaire"," — présent, complet et à jour ?",[30,852,853,856],{},[33,854,855],{},"Plan de situation"," — plan des pièces avec prises, interrupteurs et luminaires indiqués ?",[30,858,859,862],{},[33,860,861],{},"Déclaration de conformité"," de l'installateur ?",[30,864,865,868],{},[33,866,867],{},"Fiches techniques"," — tableau de distribution, différentiels, disjoncteurs ?",[56,870,871],{},[16,872,873,876],{},[33,874,875],{},"Préparez d'abord le dossier :"," un schéma absent ou dépassé peut donner lieu à une infraction. Cela ne permet pas de prédire l'ordre suivi par chaque organisme.",[11,878,880],{"id":879},"_2-contrôle-visuel","2. Contrôle visuel",[16,882,883],{},"Ensuite, le contrôleur vérifie visuellement l'installation :",[27,885,886,892,898,904,910,917,924,930],{},[30,887,888,891],{},[33,889,890],{},"Section de câble"," correcte par disjoncteur ? (ex. min. 2,5 mm² pour 16A pour circuits de prises ; pour l'éclairage 1,5 mm² pour 16A suffit)",[30,893,894,897],{},[33,895,896],{},"Différentiel 30mA"," présent pour tous les circuits de prises ?",[30,899,900,903],{},[33,901,902],{},"Zones de salle de bain"," respectées ? (Zone 0, 1, 2 selon RGIE Art. 7.1, définitions des zones Art. 7.1.3.2)",[30,905,906,909],{},[33,907,908],{},"Raccordement de terre"," présent et accessible ?",[30,911,912,913,916],{},"Toutes les ",[33,914,915],{},"boîtes de dérivation"," fermées ?",[30,918,919,920,923],{},"Câbles correctement ",[33,921,922],{},"fixés"," et protégés ?",[30,925,926,929],{},[33,927,928],{},"Interrupteur principal"," présent et librement accessible ?",[30,931,932,935],{},[33,933,934],{},"Protection contre les surtensions (SPD)"," présente ? (Art. 4.5.1 exige de manière générale la protection contre les surtensions selon les règles de l'art — en pratique, un SPD Type 2 est recommandé)",[11,937,939],{"id":938},"_3-mesures","3. Mesures",[16,941,942],{},"Enfin, le contrôleur effectue des mesures techniques :",[132,944,945,957],{},[135,946,947],{},[138,948,949,952,955],{},[141,950,951],{},"Mesure",[141,953,954],{},"Limite",[141,956,149],{},[151,958,959,970,980,991,1002],{},[138,960,961,964,967],{},[156,962,963],{},"Résistance de terre",[156,965,966],{},"\u003C 100 Ohm (Art. 4.2.4.3 a\u002Fb) ; au-delà de 30 Ohm, au moins deux différentiels à haute sensibilité requis",[156,968,969],{},"Telluromètre",[138,971,972,975,977],{},[156,973,974],{},"Résistance d'isolement",[156,976,172],{},[156,978,979],{},"Mégohmmètre (Megger)",[138,981,982,985,988],{},[156,983,984],{},"Impédance de boucle",[156,986,987],{},"Selon courant nominal MCB",[156,989,990],{},"Mesureur d'impédance de boucle",[138,992,993,996,999],{},[156,994,995],{},"Temps de déclenchement différentiel",[156,997,998],{},"\u003C 300 ms au courant différentiel nominal I∆n, \u003C 40 ms à 5× I∆n (selon IEC 61008)",[156,1000,1001],{},"Testeur de différentiel",[138,1003,1004,1007,1009],{},[156,1005,1006],{},"Mesure de tension",[156,1008,205],{},[156,1010,1011],{},"Multimètre",[11,1013,1015],{"id":1014},"résultat","Résultat",[16,1017,1018,1019,1022],{},"Après le contrôle, vous recevez un ",[33,1020,1021],{},"rapport de contrôle",". Pour les nouvelles constructions et les rénovations importantes, le contrôle doit être réussi avant que le gestionnaire de réseau n'active le raccordement électrique. En cas de défauts, vous recevez un délai pour les corrections et devez planifier un nouveau contrôle.",[11,1024,1026],{"id":1025},"articles-connexes","Articles connexes",[27,1028,1029,1035],{},[30,1030,1031],{},[229,1032,1034],{"href":1033},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Contrôle électrique en Belgique — ce qu'il faut savoir",[30,1036,1037],{},[229,1038,1040],{"href":1039},"\u002Ffr\u002Fblog\u002Fprises-par-circuit","Combien de prises par circuit ? (Limites RGIE)",[16,1042,1043],{},[229,1044,1045],{"href":243},"Créez votre schéma unifilaire conforme RGIE — gratuit →",[11,1047,1049],{"id":1048},"préparer-un-dossier-vérifiable","Préparer un dossier vérifiable",[16,1051,1052],{},"Avant le rendez-vous, confrontez le schéma unifilaire et le plan de position à l'installation réelle. Reprenez les mêmes lettres de circuits et numéros de points, étiquetez le tableau, laissez les capots accessibles et rassemblez les anciens rapports ainsi que les notices qui appartiennent au dossier. N'ouvrez jamais une partie sous tension pour préparer la visite.",[16,1054,1055,1056,1060],{},"La référence est la ",[229,1057,1059],{"href":798,"rel":1058},[259],"page du SPF Économie sur le contrôle des installations domestiques",". Le rapport de l'organisme, et non cette liste ni l'autocontrôle indicatif de PlanElec, fixe les constatations et l'éventuel délai de suivi.",{"title":263,"searchDepth":264,"depth":264,"links":1062},[1063,1064,1065,1066,1067,1068,1069],{"id":833,"depth":264,"text":834},{"id":577,"depth":264,"text":578},{"id":879,"depth":264,"text":880},{"id":938,"depth":264,"text":939},{"id":1014,"depth":264,"text":1015},{"id":1025,"depth":264,"text":1026},{"id":1048,"depth":264,"text":1049},"Documentation, contrôle visuel, mesures — découvrez point par point ce que le contrôleur vérifie et mesure réellement lors d'un contrôle électrique en Belgique.","fr",{},"\u002Fblog\u002Finspection-checklist.fr",{"title":828,"description":1070},"checklist-controle","blog\u002Finspection-checklist.fr",[288,289,1078,291,300,292,301,302,1079,1080,1081,1082,299,819],"contrôle","différentiel","résistance de terre","résistance d'isolement","Belgique","vi2njD105w-Yr7bN1KiwFfzZxFy_P-1y0be9HrCEzxM",{"id":4,"title":5,"articleId":6,"body":1085,"category":273,"date":274,"description":275,"extension":276,"lastUpdated":277,"locale":278,"meta":1255,"navigation":280,"path":281,"publishDate":274,"readTime":282,"refreshInterval":283,"seo":1256,"slug":285,"stem":286,"tags":1257,"__hash__":303},{"type":8,"value":1086,"toc":1246},[1087,1089,1091,1093,1095,1113,1119,1121,1123,1157,1159,1161,1215,1217,1221,1223,1233,1237,1239,1241],[11,1088,14],{"id":13},[16,1090,18],{},[11,1092,22],{"id":21},[16,1094,25],{},[27,1096,1097,1101,1105,1109],{},[30,1098,1099,36],{},[33,1100,35],{},[30,1102,1103,42],{},[33,1104,41],{},[30,1106,1107,48],{},[33,1108,47],{},[30,1110,1111,54],{},[33,1112,53],{},[56,1114,1115],{},[16,1116,1117,63],{},[33,1118,62],{},[11,1120,67],{"id":66},[16,1122,70],{},[27,1124,1125,1129,1133,1137,1141,1145,1149,1153],{},[30,1126,75,1127,79],{},[33,1128,78],{},[30,1130,1131,85],{},[33,1132,84],{},[30,1134,1135,91],{},[33,1136,90],{},[30,1138,1139,97],{},[33,1140,96],{},[30,1142,100,1143,104],{},[33,1144,103],{},[30,1146,107,1147,111],{},[33,1148,110],{},[30,1150,1151,117],{},[33,1152,116],{},[30,1154,1155,123],{},[33,1156,122],{},[11,1158,127],{"id":126},[16,1160,130],{},[132,1162,1163,1173],{},[135,1164,1165],{},[138,1166,1167,1169,1171],{},[141,1168,143],{},[141,1170,146],{},[141,1172,149],{},[151,1174,1175,1183,1191,1199,1207],{},[138,1176,1177,1179,1181],{},[156,1178,158],{},[156,1180,161],{},[156,1182,164],{},[138,1184,1185,1187,1189],{},[156,1186,169],{},[156,1188,172],{},[156,1190,175],{},[138,1192,1193,1195,1197],{},[156,1194,180],{},[156,1196,183],{},[156,1198,186],{},[138,1200,1201,1203,1205],{},[156,1202,191],{},[156,1204,194],{},[156,1206,197],{},[138,1208,1209,1211,1213],{},[156,1210,202],{},[156,1212,205],{},[156,1214,208],{},[11,1216,212],{"id":211},[16,1218,215,1219,219],{},[33,1220,218],{},[11,1222,223],{"id":222},[27,1224,1225,1229],{},[30,1226,1227],{},[229,1228,232],{"href":231},[30,1230,1231],{},[229,1232,238],{"href":237},[16,1234,1235],{},[229,1236,244],{"href":243},[11,1238,248],{"id":247},[16,1240,251],{},[16,1242,254,1243,261],{},[229,1244,260],{"href":257,"rel":1245},[259],{"title":263,"searchDepth":264,"depth":264,"links":1247},[1248,1249,1250,1251,1252,1253,1254],{"id":13,"depth":264,"text":14},{"id":21,"depth":264,"text":22},{"id":66,"depth":264,"text":67},{"id":126,"depth":264,"text":127},{"id":211,"depth":264,"text":212},{"id":222,"depth":264,"text":223},{"id":247,"depth":264,"text":248},{},{"title":5,"description":275},[288,289,290,291,292,293,294,295,296,297,298,299,300,301,302],1788389239890]