[{"data":1,"prerenderedAt":1150},["ShallowReactive",2],{"blog-post-nl-arei-reglementen-2026":3,"blog-alternates-arei-regulations-2026":281},{"id":4,"title":5,"articleId":6,"body":7,"category":253,"date":254,"description":255,"extension":256,"lastUpdated":257,"locale":258,"meta":259,"navigation":260,"path":261,"publishDate":262,"readTime":263,"refreshInterval":264,"seo":265,"slug":266,"stem":267,"tags":268,"__hash__":280},"blog\u002Fblog\u002Farei-regulations-2026.nl.md","AREI-regelgeving 2026: De Belangrijkste Wijzigingen","arei-regulations-2026",{"type":8,"value":9,"toc":235},"minimark",[10,15,24,45,48,52,55,58,80,83,87,92,95,104,108,111,115,118,122,125,134,137,155,159,162,165,169,172,178,184,190,194,197,200,203,206,209,213,216,222,226,229],[11,12,14],"h2",{"id":13},"wat-sinds-1-april-2026-geldt","Wat sinds 1 april 2026 geldt",[16,17,18,19,23],"p",{},"Het Belgische AREI — RGIE in het Frans — bestaat uit drie boeken. Voor huishoudelijke laagspanningsinstallaties is vooral Boek 1 van belang. Sinds ",[20,21,22],"strong",{},"1 april 2026"," geldt een nieuwe gecoördineerde versie van dat boek. Ze verwerkt het koninklijk besluit van 6 oktober 2025, gepubliceerd op 29 oktober 2025. Een erratum van 5 november verbeterde alleen de vormgeving van de publicatie en wijzigde de inhoud niet.",[16,25,26,27,30,31,38,39,44],{},"De officiële reikwijdte is smaller dan veel online samenvattingen doen vermoeden. De wijziging neemt ",[20,28,29],{},"geaarde gelijkstroomsystemen"," systematisch op in het reglement. Ze voegt DC-vormen van TN-, TT- en IT-stelsels toe, koppelt die aan bescherming tegen onrechtstreekse aanraking en past definities en verwijzingen in Boek 1 aan. De FOD Economie beschrijft die reikwijdte op de ",[32,33,37],"a",{"href":34,"rel":35},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[36],"nofollow","officiële publicatiepagina van het actuele AREI",", waar ook het bindende ",[32,40,43],{"href":41,"rel":42},"https:\u002F\u002Feconomie.fgov.be\u002Fsites\u002Fdefault\u002Ffiles\u002FFiles\u002FPublications\u002Ffiles\u002FRGIE-Annexe-Livre-1-Installations-a-basse-tenstion-et-a-tres-basse-tension-2026.pdf",[36],"gecoördineerde Boek 1 voor 2026"," staat.",[16,46,47],{},"Dit is geen algemene herschrijving van alle woningregels. Een afzonderlijke laadkring, badkamervolumes, PV-documentatie en keuringsintervallen kunnen belangrijk zijn, maar zijn niet automatisch “nieuw in 2026”. De uitvoeringsdatum, de aard van de werken en het toepasselijke hoofdstuk van het gecoördineerde boek bepalen wat geldt.",[11,49,51],{"id":50},"de-inhoudelijke-wijziging-een-systematische-plaats-voor-dc","De inhoudelijke wijziging: een systematische plaats voor DC",[16,53,54],{},"Fotovoltaïsche installaties, batterijen, DC-verdelingen en toestellen die energie kunnen terugleveren maken een uitsluitend AC-beeld van het gebouw ontoereikend. De tekst van 2026 breidt daarom de bekende stelselclassificaties uit naar geaarde gelijkstroomsystemen. TN, TT en IT beschrijven nog steeds de relatie tussen actieve geleiders, aarde en aanraakbare geleidende delen, maar de beveiligingsmaatregel moet passen bij de DC-bron, de aardingswijze en het afschakelgedrag.",[16,56,57],{},"Dat betekent niet dat elke woning een DC-net nodig heeft. Het betekent wel dat een gelijkstroomdeel dat verder gaat dan gewone interne toestelbekabeling, of een eigen geaarde verdeling vormt, niet als een klassieke AC-eindkring mag worden gedocumenteerd. De ontwerper moet minstens bepalen:",[59,60,61,65,68,71,74,77],"ul",{},[62,63,64],"li",{},"waar het DC-deel begint en eindigt;",[62,66,67],{},"of het van aarde gescheiden of bewust geaard is, en op welk punt;",[62,69,70],{},"welke actieve geleiders worden geschakeld en gescheiden;",[62,72,73],{},"welke maatregel op een isolatiefout reageert;",[62,75,76],{},"welke afschakelvoorwaarden bij het gekozen TN-, TT- of IT-stelsel horen;",[62,78,79],{},"welke fabrikantslimieten gelden voor spanning, polariteit, beveiliging en kabelroute.",[16,81,82],{},"Die antwoorden zijn projectspecifiek. Uit het woord “batterij” of “PV” volgt geen universeel aardingsstelsel of beveiligingstoestel. Een gekwalificeerde vakpersoon ontwerpt de oplossing; een erkend keuringsorganisme beoordeelt de voltooide installatie op basis van de geldende tekst en de voorgelegde bewijzen.",[11,84,86],{"id":85},"wat-geen-nieuwe-algemene-plicht-van-2026-is","Wat geen nieuwe algemene plicht van 2026 is",[88,89,91],"h3",{"id":90},"laadinfrastructuur","Laadinfrastructuur",[16,93,94],{},"Het bijzondere hoofdstuk 7.22 voor conductieve laadinrichtingen bestond al vóór 2026. Het vereist onder meer een afzonderlijke eindstroombaan per aansluitpunt, een individuele bijkomende differentieelbescherming van maximaal 30 mA voor elke AC-kring en bescherming tegen gladde DC-foutstroomcomponenten. Of dat met een differentieel type B, een type A samen met geschikte DC-detectie of een andere conforme combinatie gebeurt, hangt af van de lader en de volledige beveiligingsketen. De handleiding van de fabrikant blijft doorslaggevend.",[16,96,97,98,103],{},"Bidirectionele laders, of laders die technisch bidirectioneel kunnen werken, brengen daarnaast netaansluitingsregels mee. Synergrid vermeldt dat ze onder C10\u002F11 editie 2.4 vallen en een C10\u002F26-typehomologatie nodig hebben. Zuiver unidirectionele laders van net naar voertuig hebben niet enkel wegens het laden van een auto een C10\u002F26-homologatie nodig. Dat onderscheid staat op de ",[32,99,102],{"href":100,"rel":101},"https:\u002F\u002Fwww.synergrid.be\u002Fnl\u002Fhomologatie\u002Felektriciteit\u002Fdecentrale-productie-eenheden",[36],"Synergrid-pagina over decentrale productie-eenheden",".",[88,105,107],{"id":106},"badkamers","Badkamers",[16,109,110],{},"Bad- en doucheruimten blijven bijzondere ruimten onder het AREI. De volumes, IP-beschermingsgraden, toegelaten toestellen en differentieelbescherming moeten in hoofdstuk 7.1 van de actuele tekst worden nagegaan. De officiële omschrijving van de wijziging van 2026 ondersteunt geen algemene bewering over een “nieuwe zone 3”. Ook IPX5 geldt niet onvoorwaardelijk voor volume 1: de vereiste beschermingsgraad hangt onder meer af van het gebruik van waterstralen bij reiniging. Meet de werkelijke geometrie en vaste wateruitloop op in plaats van een vereenvoudigde internetafbeelding over te nemen.",[88,112,114],{"id":113},"overspanning-pv-en-digitale-stukken","Overspanning, PV en digitale stukken",[16,116,117],{},"Overspanningsbeveiliging, PV-beveiligingsconcepten en elektronische documenten vormen evenmin één nieuw pakket van 2026. Boek 1 bevat beginselen waarvan de toepassing afhangt van installatie, risico, materieel en uitvoeringsdatum. Dat een keuringsverslag elektronisch kan worden afgeleverd, is op zichzelf geen nieuwe elektrische beschermingsmaatregel. De actuele officiële tekst, de fabrikantdocumentatie en de beoordeling door een vakpersoon blijven bepalend.",[11,119,121],{"id":120},"welke-regels-gelden-voor-een-bestaande-installatie","Welke regels gelden voor een bestaande installatie?",[16,123,124],{},"De nuttige vraag is niet alleen “Hoe oud is het gebouw?”, maar “Wanneer is elk deel uitgevoerd en welke werken gebeuren nu?” Bestaande delen kunnen onder toepasselijke afwijkingen worden beoordeeld, terwijl een nieuw toegevoegde kring aan de actuele eisen moet voldoen. Een belangrijke wijziging of uitbreiding vereist vóór ingebruikname een gelijkvormigheidscontrole; die controle bestrijkt de werken en hun mogelijke invloed op het ongewijzigde deel.",[16,126,127,128,133],{},"De ",[32,129,132],{"href":130,"rel":131},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[36],"officiële FOD-pagina over huishoudelijke elektrische controles"," noemt de belangrijkste aanleidingen: vóór ingebruikname, na een belangrijke wijziging of uitbreiding, voor bepaalde vermogensverhogingen, bij verkoop van een wooneenheid en periodiek. Ze geeft een extra stopcontact op een bestaande kring als voorbeeld van een niet-belangrijke uitbreiding. De uiteindelijke indeling blijft afhangen van de werkelijke omvang.",[16,135,136],{},"Houd bij een renovatie daarom een beknopt wijzigingsoverzicht bij:",[138,139,140,143,146,149,152],"ol",{},[62,141,142],{},"inventariseer het bestaande werk en de gekende of geraamde uitvoeringsperiode;",[62,144,145],{},"onderscheid nieuwe en ongewijzigde delen op de plannen;",[62,147,148],{},"beoordeel de invloed van een nieuwe bron, batterij of lader op bord en beveiligingsketen;",[62,150,151],{},"bespreek aannames met elektricien en keuringsorganisme;",[62,153,154],{},"werk eendraadschema en situatieplan na uitvoering bij.",[11,156,158],{"id":157},"wat-het-dossier-voor-de-keuring-bevat","Wat het dossier voor de keuring bevat",[16,160,161],{},"Voor een huishoudelijke controle vraagt de FOD Economie minstens de eendraadschema's, situatieplannen en, indien beschikbaar, de EAN-code van de aansluiting. Het eendraadschema beschrijft kringen, onderlinge verbindingen en kenmerken van het elektrisch materieel. Het situatieplan lokaliseert verdeelborden, verbindings- en aftakdozen, contactdozen, lichtpunten, schakelaars, vaste machines en bronnen. De plannen horen bij het installatiedossier, samen met keuringsverslagen, beknopte beschrijvingen van niet-belangrijke wijzigingen en relevante technische documentatie, bijvoorbeeld van PV-materieel.",[16,163,164],{},"Bij een DC-systeem gaat bruikbare documentatie verder dan een toestelnaam. Ze vermeldt bron- en kabelreferenties, toegekende spanningen, polariteit, scheidingspunten, beveiligingstoestellen, het aardingsconcept en het bijbehorende fabrikantdocument. Een helder schema vervangt geen berekening of meting, maar zorgt dat eigenaar, installateur en controleur dezelfde installatie beoordelen.",[11,166,168],{"id":167},"een-praktische-projectcontrole-voor-2026","Een praktische projectcontrole voor 2026",[16,170,171],{},"Werk in drie stappen vóór u materiaal bestelt of installeert.",[16,173,174,177],{},[20,175,176],{},"Bevestig de reglementaire basis."," Gebruik de gecoördineerde editie die geldt op de geplande uitvoeringsdatum. Een blogartikel is oriëntatie, geen rechtsbron. Bij onzekerheid hebben de publicatie van de FOD Economie en officiële interpretaties voorrang.",[16,179,180,183],{},[20,181,182],{},"Bepaal het toepassingsgebied."," Noteer of het om nieuwbouw, een belangrijke uitbreiding, een kleine wijziging, verkoop, periodieke controle of vermogensverhoging gaat. Leg bij een EV-lader ook de richting van de energiestroom vast. Bidirectionele capaciteit kan netverplichtingen activeren die voor een gewone unidirectionele lader niet gelden.",[16,185,186,189],{},[20,187,188],{},"Verzamel bewijzen."," Bewaar kabel- en beveiligingskeuze, fabrikantaanwijzingen, metingen en plannen samen. Documentatie van DC-componenten moet toegelaten aarding, gedrag bij foutstromen en scheiding behandelen. Zonder die gegevens is een grafisch volledig plan nog geen volledige technische verantwoording.",[11,191,193],{"id":192},"versiebeheer-in-het-project-organiseren","Versiebeheer in het project organiseren",[16,195,196],{},"Bewaar niet alleen een bestand met de naam “AREI”, maar noteer welke editie voor elke ontwerpbeslissing werd gebruikt. Een projectfiche kan uitvoeringsdatum, geraadpleegde boekversie, betrokken hoofdstukken, open vakvragen en beoordelaar bevatten. Loopt een ontwerp door na een wijziging, vergelijk dan gericht de betrokken onderwerpen in plaats van elke oudere beslissing blind te verwerpen.",[16,198,199],{},"Doe hetzelfde voor fabrikantdocumenten. Noteer model, variant, firmware indien relevant en documentdatum. Vooral omvormers, batterijen en laadpalen kunnen onder bijna dezelfde productnaam verschillend reageren op foutstromen, aarding of netfuncties. Een algemene brochure vervangt de handleiding van het werkelijk geplaatste toestel niet.",[16,201,202],{},"Scheid in een overlegverslag drie niveaus: de bindende AREI-tekst, de technische ontwerpkeuze van de vakpersoon en de regel die de softwarematige zelfcontrole ondersteunt. Ze kunnen overlappen, maar zijn niet identiek. Zo blijft duidelijk of iets wettelijk vereist, als goede praktijk gekozen of nog niet automatisch geëvalueerd is.",[16,204,205],{},"Laat vóór de keuring één verantwoordelijke de gedocumenteerde eindtoestand controleren. Dat is geen gelijkvormigheidsverklaring; het bevestigt enkel dat plan, toestelvariant en uitvoering gesynchroniseerd zijn. Werk die notitie na latere wijzigingen bij, zodat eigenaar en elektricien niet op een verouderde basis voortwerken.",[16,207,208],{},"Noteer ook datum en naam van deze interne controle in de projectfiche, zodat later zichtbaar blijft welke eindtoestand werd vergeleken.",[11,210,212],{"id":211},"wat-planelec-ondersteunt-en-wat-niet","Wat PlanElec ondersteunt — en wat niet",[16,214,215],{},"PlanElec ondersteunt de workflow van grondplan en elektrische topologie naar eendraadschema, situatieplan en PDF-export. De softwarematige zelfcontrole signaleert ondersteunde problemen die uit de ingevoerde gegevens kunnen worden afgeleid. Ze is geen gelijkvormigheidsattest en vervangt geen metingen, fabrikantbewijzen of plaatselijke omstandigheden.",[16,217,218,219,221],{},"De gedocumenteerde volledige reglementtekst is Boek 1 V06, van toepassing sinds ",[20,220,22],{},". De productvalidatie zet daarvan echter slechts een gedocumenteerde deelverzameling om in automatische regels. Vooral geaarde DC-TN-, TT- en IT-stelsels, de rollen van hun geleiders en de bijbehorende beveiligingslogica zijn nog niet volledig gemodelleerd. Zo'n project vereist dus professionele studie, bewijsstukken van het materieel en de officiële keuring. PlanElec helpt de informatie gestructureerd en consistent te houden; alleen een erkend keuringsorganisme geeft de officiële beoordeling.",[11,223,225],{"id":224},"kort-samengevat","Kort samengevat",[16,227,228],{},"De verifieerbare kernwijziging voor 2026 is de systematische opname van geaarde DC-stelsels in Boek 1. Ze verplicht niet elke bestaande woning tot een algemene retrofit en creëert geen nieuw totaalpakket voor laders, badkamers, SPD's en digitale documenten. Classificeer eerst de werken, raadpleeg de actuele officiële tekst en documenteer nieuwe AC- en DC-delen duidelijk. Zo krijgen elektricien en controleur een betrouwbare basis zonder het keuringsresultaat vooraf te beloven.",[16,230,231],{},[32,232,234],{"href":233},"\u002F","Structureer uw elektrische documentatie met PlanElec →",{"title":236,"searchDepth":237,"depth":237,"links":238},"",2,[239,240,241,247,248,249,250,251,252],{"id":13,"depth":237,"text":14},{"id":50,"depth":237,"text":51},{"id":85,"depth":237,"text":86,"children":242},[243,245,246],{"id":90,"depth":244,"text":91},3,{"id":106,"depth":244,"text":107},{"id":113,"depth":244,"text":114},{"id":120,"depth":237,"text":121},{"id":157,"depth":237,"text":158},{"id":167,"depth":237,"text":168},{"id":192,"depth":237,"text":193},{"id":211,"depth":237,"text":212},{"id":224,"depth":237,"text":225},"news","2026-01-02","Wat op 1 april 2026 werkelijk veranderde in het AREI en hoe u de gevolgen voor ontwerp, dossier en keuring beoordeelt.","md","2026-08-29","nl",{},true,"\u002Fblog\u002Farei-regulations-2026.nl",null,"11 min",6,{"title":5,"description":255},"arei-reglementen-2026","blog\u002Farei-regulations-2026.nl",[269,270,271,272,273,274,275,276,277,278,279],"AREI","RGIE","regelgeving 2026","elektrische voorschriften","gelijkstroom","keuring","eendraadschema","situatieplan","EV-lader","zonnepanelen","België","z_MDffDrs9RMROpDg_glE_9CwHlxn4W7cz7U7MV2X_Y",[282,536,770,997],{"id":283,"title":284,"articleId":6,"body":285,"category":253,"date":254,"description":517,"extension":256,"lastUpdated":257,"locale":518,"meta":519,"navigation":260,"path":520,"publishDate":262,"readTime":263,"refreshInterval":264,"seo":521,"slug":522,"stem":523,"tags":524,"__hash__":535},"blog\u002Fblog\u002Farei-regulations-2026.de.md","AREI-Vorschriften 2026: Die wichtigsten Änderungen",{"type":8,"value":286,"toc":502},[287,291,298,315,318,322,325,328,348,351,355,359,362,371,375,378,382,385,389,392,400,403,420,424,427,430,434,437,443,449,455,459,462,465,468,471,474,478,481,487,490,494,497],[11,288,290],{"id":289},"was-seit-dem-1-april-2026-gilt","Was seit dem 1. April 2026 gilt",[16,292,293,294,297],{},"Das belgische AREI — französisch RGIE — besteht aus drei Büchern. Für häusliche Niederspannungsinstallationen ist vor allem Buch 1 maßgeblich. Seit dem ",[20,295,296],{},"1. April 2026"," gilt eine neue konsolidierte Fassung von Buch 1. Grundlage ist der Königliche Erlass vom 6. Oktober 2025, veröffentlicht am 29. Oktober 2025; ein Erratum vom 5. November korrigierte nur die Darstellung, nicht den Inhalt.",[16,299,300,301,304,305,309,310,314],{},"Der offizielle Schwerpunkt ist enger, als viele Übersichten vermuten lassen: Die Änderung integriert ",[20,302,303],{},"geerdete Gleichstromsysteme"," in das Regelwerk. Sie beschreibt DC-Ausführungen der Systeme TN, TT und IT, ordnet Schutzmaßnahmen gegen indirektes Berühren zu und passt Definitionen sowie Querverweise in Buch 1 an. Der SPF Economie nennt diesen Umfang ausdrücklich auf seiner ",[32,306,308],{"href":34,"rel":307},[36],"Übersichtsseite zum aktuellen RGIE","; dort steht auch die verbindliche ",[32,311,313],{"href":41,"rel":312},[36],"Fassung von Buch 1 für 2026"," bereit.",[16,316,317],{},"Das ist keine pauschale Neufassung aller Regeln für Wohngebäude. Ein eigener Wallbox-Stromkreis, Badezimmerzonen, PV-Dokumentation und Kontrollfristen können für ein Projekt sehr wichtig sein, sind aber nicht automatisch „neu ab 2026“. Entscheidend sind das Datum und der Umfang der konkreten Installation sowie die einschlägigen Kapitel des konsolidierten Buchs.",[11,319,321],{"id":320},"die-tatsächliche-änderung-gleichstrom-wird-systematisch-eingeordnet","Die tatsächliche Änderung: Gleichstrom wird systematisch eingeordnet",[16,323,324],{},"Photovoltaik, Batteriespeicher, Gleichstromverteilungen und rückspeisefähige Geräte führen dazu, dass in Gebäuden nicht mehr nur Wechselstrom betrachtet werden kann. Die 2026-Fassung ergänzt deshalb die bekannten Netzsystembegriffe um geerdete Gleichstromsysteme. Die Buchstaben TN, TT und IT beschreiben dabei weiterhin, wie aktive Leiter, Erde und berührbare leitfähige Teile zueinander stehen; die konkrete Schutzmaßnahme muss jedoch zur Gleichstromquelle, zur Erdung und zum Abschaltverhalten passen.",[16,326,327],{},"Für die Planung bedeutet das nicht, dass jedes Haus nun ein DC-Netz benötigt. Es bedeutet vielmehr: Sobald ein DC-Teil über die bisher typische, geräteinterne PV-Verkabelung hinausgeht oder eine eigene geerdete Verteilung bildet, darf er nicht wie ein gewöhnlicher AC-Abgang dokumentiert werden. Planer müssen mindestens klären:",[59,329,330,333,336,339,342,345],{},[62,331,332],{},"Wo beginnt und endet der DC-Teil der Anlage?",[62,334,335],{},"Ist das System gegen Erde isoliert oder bewusst geerdet, und an welchem Punkt?",[62,337,338],{},"Welche aktiven Leiter werden geschaltet und getrennt?",[62,340,341],{},"Welche Schutzmaßnahme reagiert bei einem Isolationsfehler?",[62,343,344],{},"Welche Ausschaltbedingungen gelten für die gewählte TN-, TT- oder IT-Ausführung?",[62,346,347],{},"Welche Herstellerangaben begrenzen Spannung, Polarität, Schutzgerät und Leitungsführung?",[16,349,350],{},"Diese Fragen sind projektspezifisch. Aus dem allgemeinen Begriff „Batterie“ oder „PV“ folgt weder ein bestimmtes Erdungssystem noch eine universelle Schutzlösung. Die Auslegung gehört in die Hände einer qualifizierten Elektrofachkraft; der Kontrollorganismus beurteilt die fertige Installation anhand des geltenden Regelwerks und der vorgelegten Unterlagen.",[11,352,354],{"id":353},"was-nicht-als-neue-2026-pflicht-dargestellt-werden-sollte","Was nicht als neue 2026-Pflicht dargestellt werden sollte",[88,356,358],{"id":357},"wallboxen","Wallboxen",[16,360,361],{},"Das besondere Kapitel 7.22 für leitfähige Ladeeinrichtungen wurde bereits vor 2026 eingeführt. Es verlangt unter anderem einen eigenen Endstromkreis je Anschlusspunkt, einen individuellen zusätzlichen Differenzstromschutz von höchstens 30 mA pro AC-Stromkreis und Schutz gegen glatte DC-Fehlerstromanteile. Ob dafür ein RCD Typ B, ein Typ A zusammen mit einer geeigneten DC-Erkennung oder eine andere normgerechte Gerätekombination eingesetzt wird, hängt vom Ladegerät und der Schutzkette ab. Die aktuelle Fassung steht im verlinkten Buch 1; ein Herstellerdatenblatt bleibt für die konkrete Auswahl unverzichtbar.",[16,363,364,365,370],{},"Bei bidirektionalen oder technisch bidirektionalen Ladegeräten kommt zusätzlich das Netzanschlussthema hinzu. Synergrid erläutert, dass solche Geräte in den Anwendungsbereich C10\u002F11 ed. 2.4 fallen und eine C10\u002F26-Typzulassung benötigen. Rein unidirektionale Netz-zu-Fahrzeug-Lader fallen laut ",[32,366,369],{"href":367,"rel":368},"https:\u002F\u002Fwww.synergrid.be\u002Ffr\u002Fhomologation\u002Felectricite\u002Funites-de-production-decentralisee",[36],"Synergrid-Übersicht zu dezentralen Erzeugungseinheiten"," nicht allein deshalb unter C10\u002F26. Diese Unterscheidung ist genauer als die pauschale Behauptung, jede Wallbox brauche eine Synergrid-Zulassung.",[88,372,374],{"id":373},"badezimmer","Badezimmer",[16,376,377],{},"Bad- und Duschräume bleiben ein eigener Spezialbereich des AREI. Die maßgeblichen Volumen, IP-Anforderungen, zulässigen Betriebsmittel und Differenzstromschutzregeln sind anhand von Kapitel 7.1 der aktuell konsolidierten Fassung zu prüfen. Eine allgemeine „neue Zone 3 ab 2026“ lässt sich aus der offiziellen 2026-Änderungsbeschreibung nicht ableiten. Ebenso ist IPX5 nicht pauschal für Zone 1 vorgeschrieben: Die Schutzart hängt unter anderem davon ab, ob mit Wasserstrahlen gereinigt wird. Wer ein Bad plant, sollte Geometrie und festen Wasserauslass exakt aufnehmen, statt eine vereinfachte Internetgrafik zu übertragen.",[88,379,381],{"id":380},"überspannungsschutz-pv-und-digitale-unterlagen","Überspannungsschutz, PV und digitale Unterlagen",[16,383,384],{},"Auch Überspannungsschutz, PV-Schutzkonzepte und elektronische Unterlagen dürfen nicht pauschal als „neue 2026-Pflicht“ etikettiert werden. Buch 1 enthält Anforderungen und Grundsätze, deren Anwendung von Anlage, Risiko, Gerätetechnik und Ausführungsdatum abhängt. Dass ein Kontrollorganismus einen elektronisch übermittelten Bericht verwendet, ist außerdem nicht gleichbedeutend mit einer neuen materiellen Schutzvorschrift. Für die Projektentscheidung zählen der aktuelle Normtext, Herstellerunterlagen und die Bewertung der Fachkraft.",[11,386,388],{"id":387},"welche-installation-ist-von-welcher-regel-betroffen","Welche Installation ist von welcher Regel betroffen?",[16,390,391],{},"Die richtige Frage lautet nicht nur „Ist das Gebäude alt?“, sondern „Wann wurde welcher Teil ausgeführt und welche Arbeit erfolgt jetzt?“. Eine bestehende Installation kann weiterhin nach zulässigen Abweichungen beurteilt werden, während ein neu hinzugefügter Stromkreis die aktuellen Anforderungen erfüllen muss. Bei einer wichtigen Änderung oder Erweiterung ist vor der Inbetriebnahme eine Konformitätskontrolle erforderlich; sie betrachtet die Änderung und mögliche Auswirkungen auf den unveränderten Teil.",[16,393,394,395,399],{},"Die ",[32,396,398],{"href":130,"rel":397},[36],"offizielle SPF-Seite zur Kontrolle häuslicher Elektroinstallationen"," nennt die Kontrollanlässe: vor Ingebrauchnahme, bei wichtigen Änderungen oder Erweiterungen, bei bestimmten Leistungserhöhungen, beim Verkauf einer Wohneinheit und periodisch. Sie erläutert zugleich, dass kleine Arbeiten wie eine zusätzliche Steckdose an einem bestehenden Stromkreis als nicht wichtige Erweiterung gelten können. Die Einordnung bleibt vom tatsächlichen Umfang abhängig.",[16,401,402],{},"Für ein Renovierungsprojekt sollten Sie deshalb eine kurze Änderungsliste führen:",[138,404,405,408,411,414,417],{},[62,406,407],{},"Bestand mit Datum oder vermutetem Errichtungszeitraum erfassen.",[62,409,410],{},"Neue und unveränderte Anlagenteile im Plan unterscheiden.",[62,412,413],{},"Auswirkungen neuer Quellen, Speicher oder Ladegeräte auf Verteiler und Schutzkette prüfen.",[62,415,416],{},"Offene Annahmen mit Elektriker und Kontrollorganismus klären.",[62,418,419],{},"Eindrahtschema und Situationsplan nach der Ausführung aktualisieren.",[11,421,423],{"id":422},"dossier-und-pläne-was-die-kontrolle-tatsächlich-verlangt","Dossier und Pläne: Was die Kontrolle tatsächlich verlangt",[16,425,426],{},"Der SPF Economie nennt für eine häusliche Kontrolle mindestens das Eindrahtschema, den Situationsplan und — sofern verfügbar — die EAN-Nummer. Das Eindrahtschema stellt Stromkreise, Verbindungen und elektrische Betriebsmittel mit ihren Merkmalen dar. Der Situationsplan verortet Verteiler, Verbindungs- und Abzweigdosen, Steckdosen, Leuchten, Schalter, feste Maschinen und Quellen. Beide Dokumente gehören zum Installationsdossier; hinzu kommen Kontrollberichte, Beschreibungen nicht wichtiger Änderungen sowie technische Unterlagen, etwa für PV-Komponenten.",[16,428,429],{},"Bei einem DC-System sollten die Unterlagen über eine bloße Gerätebezeichnung hinausgehen. Sinnvoll sind eine eindeutige Quellen- und Leitungszuordnung, Nennspannungen, Polarität, Trennstellen, Schutzgeräte, Erdungskonzept und die Referenz auf das jeweilige Herstellerdokument. Ein sauberer Plan ersetzt weder Berechnung noch Messung, macht aber sichtbar, ob Beteiligte über dieselbe Anlage sprechen.",[11,431,433],{"id":432},"praktische-prüfung-für-projekte-im-jahr-2026","Praktische Prüfung für Projekte im Jahr 2026",[16,435,436],{},"Vor Bestellung oder Ausführung hilft eine dreistufige Prüfung:",[16,438,439,442],{},[20,440,441],{},"Regelstand prüfen."," Verwenden Sie die konsolidierte Fassung, die am geplanten Ausführungsdatum gilt. Ein Blogartikel ist Orientierung, nicht Rechtsquelle. Bei Zweifeln sind die Veröffentlichungen des SPF Economie und die Erläuterungen der zuständigen Stellen maßgeblich.",[16,444,445,448],{},[20,446,447],{},"Anwendungsbereich bestimmen."," Notieren Sie, ob es um Neubau, wichtige Erweiterung, kleine Änderung, Verkauf, periodische Kontrolle oder Leistungserhöhung geht. Prüfen Sie bei EV-Ladern zusätzlich die Richtung des Energieflusses; bidirektionale Technik kann Netzbetreiberanforderungen auslösen, die ein normaler unidirektionaler Lader nicht hat.",[16,450,451,454],{},[20,452,453],{},"Nachweise sammeln."," Halten Sie Kabel- und Schutzgeräteauswahl, Herstelleranweisungen, Messwerte und Pläne zusammen. Bei DC-Komponenten sollten Datenblätter Aussagen zu zulässiger Erdung, Fehlerstromverhalten und Abschaltung enthalten. Fehlen diese Angaben, ist eine grafisch vollständige Dokumentation noch keine vollständige technische Begründung.",[11,456,458],{"id":457},"versionskontrolle-im-projekt-praktisch-organisieren","Versionskontrolle im Projekt praktisch organisieren",[16,460,461],{},"Speichern Sie nicht nur eine PDF-Datei mit dem Namen „AREI“, sondern dokumentieren Sie, welche Fassung für welche Entscheidung verwendet wurde. Ein Projektnotizblatt kann Ausführungsdatum, konsultierte Buchfassung, betroffene Kapitel, offene Fachfragen und verantwortliche Prüfer enthalten. Wird die Planung nach einer Regelwerksänderung fortgeführt, vergleichen Sie gezielt die betroffenen Punkte, statt jede frühere Entscheidung ungeprüft zu verwerfen.",[16,463,464],{},"Bei Herstellerunterlagen gilt dasselbe: Modellbezeichnung, Firmware- oder Variantenstand und Ausgabedatum gehören zur Referenz. Gerade bei Wechselrichtern, Speichern und Ladegeräten können äußerlich ähnliche Varianten unterschiedliche Fehlerstromerkennung, Erdungsbedingungen oder Netzfunktionen haben. Eine allgemeine Broschüre ist kein Ersatz für die Anleitung des eingebauten Produkts.",[16,466,467],{},"Trennen Sie in Besprechungsprotokollen drei Ebenen: den verbindlichen Text des AREI, die technische Auslegung durch die Fachkraft und die im Software-Selbstcheck unterstützte Regel. Diese Ebenen können sich überschneiden, sind aber nicht identisch. Dadurch bleibt nachvollziehbar, ob ein Punkt gesetzlich gefordert, als gute Fachpraxis gewählt oder lediglich noch nicht maschinell ausgewertet wurde.",[16,469,470],{},"Vor der Kontrolle sollte eine verantwortliche Person den dokumentierten Endstand freigeben. Diese Freigabe ist keine Konformitätserklärung, sondern bestätigt nur, dass Plan, Gerätestand und ausgeführte Anlage synchronisiert wurden. Nach späteren Änderungen wird die Notiz fortgeschrieben, damit Eigentümer und Elektriker nicht mit einer veralteten Grundlage arbeiten.",[16,472,473],{},"Auch das Datum dieser internen Prüfung gehört in die Projektakte.",[11,475,477],{"id":476},"was-planelec-dabei-leistet-und-was-nicht","Was PlanElec dabei leistet — und was nicht",[16,479,480],{},"PlanElec unterstützt den Weg vom Grundriss über die elektrische Topologie bis zu Eindrahtschema, Situationsplan und PDF-Export. Der softwaregestützte Selbstcheck weist auf unterstützte, aus den eingegebenen Daten ableitbare Probleme hin. Er ist keine Konformitätsbescheinigung und deckt weder Messungen noch sämtliche Hersteller- und Ortsbedingungen ab.",[16,482,483,484,486],{},"Der dokumentierte Regelwerksvolltext entspricht Buch 1 V06, gültig seit dem ",[20,485,296],{},". Die Produktvalidierung setzt daraus jedoch nur einen dokumentierten Ausschnitt maschinell um. Insbesondere geerdete DC-TN-, TT- und IT-Systeme, ihre Leiterrollen und die zugehörige Schutzlogik sind noch nicht vollständig modelliert. Für ein solches Projekt müssen Fachplanung, Herstellerunterlagen und offizielle Kontrolle die offenen Punkte schließen. PlanElec hilft, die Informationen strukturiert und konsistent zu halten; die positive Beurteilung erteilt ausschließlich ein zugelassener Kontrollorganismus.",[16,488,489],{},"Offene Prüfpunkte müssen deshalb im Projektdossier sichtbar bleiben und einer verantwortlichen fachlichen Beurteilung zugeordnet werden.",[11,491,493],{"id":492},"kurzfazit","Kurzfazit",[16,495,496],{},"Die wichtigste belastbare 2026-Neuerung ist die systematische Aufnahme geerdeter Gleichstromsysteme in Buch 1. Daraus folgt kein pauschaler Umbauauftrag für jede Bestandsanlage und kein neues Sammelpaket aus Wallbox-, Badezimmer-, SPD- und Digitalpflichten. Ordnen Sie zuerst den Anwendungsfall ein, verwenden Sie den aktuellen offiziellen Text und dokumentieren Sie neue AC- und DC-Teile nachvollziehbar. So entsteht eine belastbare Grundlage für Elektriker und Kontrollorganismus — ohne eine bestandene Kontrolle vorwegzunehmen.",[16,498,499],{},[32,500,501],{"href":233},"Elektrische Dokumentation in PlanElec strukturieren →",{"title":236,"searchDepth":237,"depth":237,"links":503},[504,505,506,511,512,513,514,515,516],{"id":289,"depth":237,"text":290},{"id":320,"depth":237,"text":321},{"id":353,"depth":237,"text":354,"children":507},[508,509,510],{"id":357,"depth":244,"text":358},{"id":373,"depth":244,"text":374},{"id":380,"depth":244,"text":381},{"id":387,"depth":237,"text":388},{"id":422,"depth":237,"text":423},{"id":432,"depth":237,"text":433},{"id":457,"depth":237,"text":458},{"id":476,"depth":237,"text":477},{"id":492,"depth":237,"text":493},"Was sich im belgischen AREI\u002FRGIE zum 1. April 2026 tatsächlich geändert hat und wie Sie die Auswirkungen auf Planung, Dossier und Kontrolle einordnen.","de",{},"\u002Fblog\u002Farei-regulations-2026.de",{"title":284,"description":517},"arei-vorschriften-2026","blog\u002Farei-regulations-2026.de",[269,270,525,526,527,528,529,530,531,532,533,534],"Vorschriften 2026","Elektrovorschriften","Gleichstrom","Stromabnahme","Keuring","Eindrahtschema","Situationsplan","Wallbox","Solaranlage","Belgien","FYnQvGGOfX2xHvYbOR0eFGdK0F_thLwweN0my5Gn_tM",{"id":537,"title":538,"articleId":6,"body":539,"category":253,"date":254,"description":754,"extension":256,"lastUpdated":257,"locale":755,"meta":756,"navigation":260,"path":757,"publishDate":262,"readTime":263,"refreshInterval":264,"seo":758,"slug":6,"stem":759,"tags":760,"__hash__":769},"blog\u002Fblog\u002Farei-regulations-2026.en.md","AREI\u002FRGIE Regulations 2026: The Key Changes",{"type":8,"value":540,"toc":739},[541,545,552,568,571,575,578,581,601,604,608,612,615,623,627,630,634,637,641,644,652,655,672,676,679,682,686,689,695,701,707,711,714,718,721,727,731,734],[11,542,544],{"id":543},"what-has-applied-since-1-april-2026","What has applied since 1 April 2026",[16,546,547,548,551],{},"Belgium's AREI\u002FRGIE consists of three books. Book 1 is the main reference for domestic low-voltage installations. A new consolidated version of Book 1 has applied since ",[20,549,550],{},"1 April 2026",". It incorporates the Royal Decree of 6 October 2025, published on 29 October 2025; an erratum dated 5 November corrected presentation only and did not change the substance.",[16,553,554,555,558,559,563,564,103],{},"The official scope is narrower than many online summaries suggest. The amendment integrates ",[20,556,557],{},"earthed direct-current systems"," into the regulation. It introduces DC forms of TN, TT and IT systems, connects them with protection against indirect contact, and adjusts definitions and cross-references throughout Book 1. The Belgian Federal Public Service Economy describes that scope on its ",[32,560,562],{"href":34,"rel":561},[36],"current AREI\u002FRGIE publication page",", which also provides the authoritative ",[32,565,567],{"href":41,"rel":566},[36],"2026 consolidated Book 1",[16,569,570],{},"This is not a wholesale rewrite of every domestic rule. Dedicated EV circuits, bathroom volumes, PV documentation and inspection intervals can all matter to a project, but they are not automatically “new for 2026”. The execution date, the nature of the work and the relevant chapter of the consolidated book determine which rule applies.",[11,572,574],{"id":573},"the-substantive-change-a-systematic-place-for-dc-systems","The substantive change: a systematic place for DC systems",[16,576,577],{},"Photovoltaics, batteries, DC distribution and equipment that can feed energy back mean that a building can no longer be analysed as an AC-only environment. The 2026 text therefore extends the familiar system classifications to earthed DC systems. TN, TT and IT still describe the relationship between live conductors, earth and exposed conductive parts, but the protective measure must suit the DC source, earthing arrangement and disconnection behaviour.",[16,579,580],{},"This does not mean every home now needs a DC grid. It means that a DC section which goes beyond ordinary equipment-internal wiring, or forms an earthed distribution system of its own, cannot be documented as if it were a conventional AC outgoing circuit. The designer should establish at least:",[59,582,583,586,589,592,595,598],{},[62,584,585],{},"where the DC section begins and ends;",[62,587,588],{},"whether it is isolated from earth or intentionally earthed, and at which point;",[62,590,591],{},"which live conductors are switched and isolated;",[62,593,594],{},"what measure responds to an insulation fault;",[62,596,597],{},"which disconnection conditions apply to the selected TN, TT or IT arrangement;",[62,599,600],{},"which manufacturer limits govern voltage, polarity, protection and cable routing.",[16,602,603],{},"Those answers are installation-specific. Neither the word “battery” nor “PV” implies one universal earthing system or protective device. A qualified electrical professional must design the arrangement, and an approved inspection body assesses the completed installation against the applicable text and evidence.",[11,605,607],{"id":606},"what-should-not-be-marketed-as-a-new-2026-duty","What should not be marketed as a new 2026 duty",[88,609,611],{"id":610},"ev-charging","EV charging",[16,613,614],{},"Special chapter 7.22 for conductive charging installations existed before 2026. Among other things, it requires a final circuit dedicated to each connection point, individual additional residual-current protection not exceeding 30 mA for each AC circuit, and protection against smooth DC residual-current components. Whether this is delivered by a Type B RCD, a Type A RCD combined with appropriate DC detection, or another compliant assembly depends on the charger and complete protection chain. The exact equipment instructions remain essential.",[16,616,617,618,622],{},"Bidirectional or technically bidirectional chargers add a grid-connection question. Synergrid states that these devices fall within C10\u002F11 edition 2.4 and require C10\u002F26 type approval. Purely unidirectional grid-to-vehicle chargers do not require C10\u002F26 merely because they charge a car, according to Synergrid's ",[32,619,621],{"href":367,"rel":620},[36],"distributed-generation approval page",". This distinction is more accurate than claiming that every wallbox needs Synergrid approval.",[88,624,626],{"id":625},"bathrooms","Bathrooms",[16,628,629],{},"Bathrooms and shower rooms remain a special location under the AREI\u002FRGIE. The applicable volumes, IP ratings, permitted equipment and residual-current protection must be checked against chapter 7.1 of the current consolidated text. The official description of the 2026 amendment does not support a generic “new Zone 3 in 2026” claim. Nor is IPX5 an unconditional Zone 1 requirement: the required degree of protection also depends on whether water jets are used for cleaning. Record the exact geometry and fixed water outlet instead of copying a simplified diagram from the internet.",[88,631,633],{"id":632},"surge-protection-pv-and-digital-records","Surge protection, PV and digital records",[16,635,636],{},"Surge protection, PV protection design and electronic documents should likewise not be presented as one new 2026 package. Book 1 contains principles and requirements whose application depends on the installation, risks, equipment and execution date. The fact that an inspection report may be delivered electronically is not itself a new electrical protective measure. The current legal text, the manufacturer's evidence and professional assessment remain decisive.",[11,638,640],{"id":639},"which-rules-apply-to-an-existing-installation","Which rules apply to an existing installation?",[16,642,643],{},"The useful question is not simply “How old is the building?” but “When was each part installed, and what work is being carried out now?” Existing portions may be assessed under applicable derogations while a newly added circuit must meet current requirements. A major modification or extension requires a conformity inspection before use; the review covers the work and any effect it has on the unchanged part.",[16,645,646,647,651],{},"The Federal Public Service Economy's ",[32,648,650],{"href":130,"rel":649},[36],"domestic electrical inspection guidance"," identifies the main triggers: before first use, after a major modification or extension, for certain capacity increases, when a dwelling is sold and periodically. It also gives adding one socket to an existing circuit as an example of a non-major extension. Classification still depends on the real scope of the job.",[16,653,654],{},"A renovation file should therefore include a concise change record:",[138,656,657,660,663,666,669],{},[62,658,659],{},"identify the existing work and its known or estimated execution period;",[62,661,662],{},"distinguish new and unchanged sections on the plans;",[62,664,665],{},"assess how a new source, battery or charger affects the board and protection chain;",[62,667,668],{},"resolve assumptions with the electrician and inspection body;",[62,670,671],{},"update the single-line diagram and situation plan after installation.",[11,673,675],{"id":674},"what-the-inspection-file-actually-contains","What the inspection file actually contains",[16,677,678],{},"For a domestic inspection, the federal guidance asks for at least the single-line diagrams, situation plans and the connection's EAN code if available. The single-line diagram represents circuits, interconnections and electrical equipment with their characteristics. The situation plan locates distribution boards, connection and junction boxes, sockets, lighting points, switches, fixed machines and sources. Both form part of the installation file, together with inspection reports, short descriptions of non-major changes and relevant technical documentation such as PV equipment records.",[16,680,681],{},"For a DC system, useful documentation goes beyond naming a device. It should establish source and cable references, rated voltages, polarity, isolation points, protective devices, the earthing concept and the relevant manufacturer document. A clear diagram does not replace calculations or measurements, but it allows the installer, owner and inspector to verify that they are discussing the same system.",[11,683,685],{"id":684},"a-practical-2026-project-review","A practical 2026 project review",[16,687,688],{},"Use three passes before equipment is ordered or installed.",[16,690,691,694],{},[20,692,693],{},"Confirm the regulatory baseline."," Work from the consolidated edition in force on the planned execution date. A blog post is orientation, not the legal source. The federal publication and any official interpretation should take priority where wording is uncertain.",[16,696,697,700],{},[20,698,699],{},"Determine the scope."," Record whether the project is a new installation, major extension, minor change, sale inspection, periodic review or capacity increase. For an EV charger, also establish the direction of power flow. Bidirectional capability may trigger grid-code duties that do not apply to an ordinary unidirectional charger.",[16,702,703,706],{},[20,704,705],{},"Collect evidence."," Keep cable and protective-device selection, manufacturer instructions, measurements and drawings together. DC component data should address permissible earthing, residual-current behaviour and isolation. If those data are missing, a visually complete drawing is not yet a complete engineering justification.",[11,708,710],{"id":709},"manage-the-regulatory-version-in-the-project","Manage the regulatory version in the project",[16,712,713],{},"Keep a small version record with the execution date, consulted Book 1 edition, relevant chapters, open questions and reviewer. Record the exact model and document revision for inverters, batteries and chargers: similar product names can hide different residual-current, earthing or grid behaviour. Separate three layers in decisions — the binding AREI\u002FRGIE text, professional engineering choice, and rules currently supported by software. They overlap but are not interchangeable. Before inspection, reconcile the final drawings, installed model variants and actual wiring; this internal check confirms consistency, not legal conformity.",[11,715,717],{"id":716},"how-planelec-helps-and-where-its-limits-remain","How PlanElec helps — and where its limits remain",[16,719,720],{},"PlanElec supports the workflow from floor plan and electrical topology to a single-line diagram, situation plan and PDF export. Its software-assisted self-check flags supported issues that can be derived from the entered data. It is not a certificate of conformity and cannot replace measurements, manufacturer evidence or site conditions.",[16,722,723,724,726],{},"The documented regulatory full text is Book 1 V06, effective ",[20,725,550],{},". Product validation, however, implements only a documented subset of that text as machine-checkable rules. In particular, earthed DC TN, TT and IT systems, their conductor roles and associated protection logic are not yet modelled completely. Such a project still needs professional design, equipment evidence and official inspection to close those gaps. PlanElec helps keep the information structured and consistent; only an approved inspection body issues the official assessment.",[11,728,730],{"id":729},"in-brief","In brief",[16,732,733],{},"The defensible key change for 2026 is the systematic integration of earthed DC systems into Book 1. It does not impose a generic retrofit on every existing home, nor does it create a single new bundle of EV, bathroom, SPD and digital-document duties. First classify the work, consult the current official text, and document every new AC and DC section clearly. That gives the electrician and inspector a reliable basis without promising the inspection outcome.",[16,735,736],{},[32,737,738],{"href":233},"Structure your electrical documentation with PlanElec →",{"title":236,"searchDepth":237,"depth":237,"links":740},[741,742,743,748,749,750,751,752,753],{"id":543,"depth":237,"text":544},{"id":573,"depth":237,"text":574},{"id":606,"depth":237,"text":607,"children":744},[745,746,747],{"id":610,"depth":244,"text":611},{"id":625,"depth":244,"text":626},{"id":632,"depth":244,"text":633},{"id":639,"depth":237,"text":640},{"id":674,"depth":237,"text":675},{"id":684,"depth":237,"text":685},{"id":709,"depth":237,"text":710},{"id":716,"depth":237,"text":717},{"id":729,"depth":237,"text":730},"What actually changed in the Belgian AREI\u002FRGIE on 1 April 2026, and how to assess the consequences for design, documentation and inspection.","en",{},"\u002Fblog\u002Farei-regulations-2026.en",{"title":538,"description":754},"blog\u002Farei-regulations-2026.en",[269,270,761,762,763,764,765,766,611,767,768],"regulations 2026","electrical regulations","direct current","inspection","single-line diagram","situation plan","solar panels","Belgium","yCbDrEi1vHZ-_6pcm8vKtugAfXRM9dIMMhx17iy8p_U",{"id":771,"title":772,"articleId":6,"body":773,"category":253,"date":254,"description":979,"extension":256,"lastUpdated":257,"locale":980,"meta":981,"navigation":260,"path":982,"publishDate":262,"readTime":263,"refreshInterval":264,"seo":983,"slug":984,"stem":985,"tags":986,"__hash__":996},"blog\u002Fblog\u002Farei-regulations-2026.fr.md","Réglementation RGIE 2026 : Les Changements Clés",{"type":8,"value":774,"toc":965},[775,779,786,802,805,809,812,815,835,838,842,846,849,856,860,863,867,870,874,877,885,888,905,909,912,915,919,922,928,934,940,944,947,953,957,960],[11,776,778],{"id":777},"ce-qui-sapplique-depuis-le-1er-avril-2026","Ce qui s'applique depuis le 1er avril 2026",[16,780,781,782,785],{},"Le RGIE — AREI en néerlandais — se compose de trois livres. Le Livre 1 est la référence principale pour les installations domestiques à basse tension. Une nouvelle version coordonnée de ce livre s'applique depuis le ",[20,783,784],{},"1er avril 2026",". Elle intègre l'arrêté royal du 6 octobre 2025, publié le 29 octobre 2025. Un erratum du 5 novembre a corrigé la présentation de la publication sans modifier son contenu.",[16,787,788,789,792,793,797,798,103],{},"La portée officielle est plus ciblée que ne le laissent entendre de nombreux résumés. La modification intègre les ",[20,790,791],{},"schémas mis à la terre en courant continu"," dans le règlement. Elle décrit les variantes DC des schémas TN, TT et IT, les relie aux protections contre les contacts indirects et adapte des définitions et renvois du Livre 1. Le SPF Economie expose cette portée sur sa ",[32,794,796],{"href":34,"rel":795},[36],"page officielle du RGIE en vigueur",", où il publie aussi le ",[32,799,801],{"href":41,"rel":800},[36],"Livre 1 coordonné pour 2026",[16,803,804],{},"Il ne s'agit donc pas d'une réécriture générale de toutes les règles domestiques. Les circuits de recharge, les volumes de salle de bains, les documents photovoltaïques ou les périodicités de contrôle restent importants, mais ne sont pas automatiquement des « nouveautés 2026 ». La date d'exécution, la nature des travaux et le chapitre applicable du texte coordonné déterminent la règle pertinente.",[11,806,808],{"id":807},"la-modification-de-fond-une-place-structurée-pour-le-courant-continu","La modification de fond : une place structurée pour le courant continu",[16,810,811],{},"Le photovoltaïque, les batteries, les distributions DC et les appareils capables de réinjecter de l'énergie rendent insuffisante une lecture exclusivement AC du bâtiment. Le texte 2026 étend donc les classifications usuelles aux schémas DC mis à la terre. Les lettres TN, TT et IT décrivent toujours le rapport entre conducteurs actifs, terre et masses accessibles, mais la mesure de protection doit correspondre à la source continue, à la mise à la terre et au comportement de coupure.",[16,813,814],{},"Cela ne signifie pas que chaque logement doit recevoir un réseau DC. Cela signifie qu'une partie continue qui dépasse le câblage interne ordinaire d'un équipement, ou qui constitue une distribution mise à la terre, ne peut pas être documentée comme un simple départ AC. L'auteur de l'étude doit au minimum déterminer :",[59,816,817,820,823,826,829,832],{},[62,818,819],{},"où commence et où se termine la partie DC ;",[62,821,822],{},"si elle est isolée de la terre ou volontairement mise à la terre, et en quel point ;",[62,824,825],{},"quels conducteurs actifs sont commandés et sectionnés ;",[62,827,828],{},"quelle mesure réagit à un défaut d'isolement ;",[62,830,831],{},"quelles conditions de coupure correspondent au schéma TN, TT ou IT choisi ;",[62,833,834],{},"quelles limites du fabricant encadrent tension, polarité, protections et cheminement.",[16,836,837],{},"Ces réponses dépendent du projet. Le mot « batterie » ou « PV » n'impose ni un schéma de terre unique ni une protection universelle. Le dimensionnement relève d'un professionnel qualifié, puis l'organisme agréé évalue l'installation terminée au regard du texte applicable et des preuves fournies.",[11,839,841],{"id":840},"ce-quil-ne-faut-pas-présenter-comme-une-nouvelle-obligation-2026","Ce qu'il ne faut pas présenter comme une nouvelle obligation 2026",[88,843,845],{"id":844},"recharge-des-véhicules","Recharge des véhicules",[16,847,848],{},"Le chapitre spécial 7.22 relatif aux bornes conductives existait avant 2026. Il impose notamment un circuit terminal dédié à chaque point de connexion, une protection différentielle complémentaire individuelle de 30 mA au plus pour chaque circuit AC et une protection contre les composantes continues lisses du courant de défaut. La solution peut associer un différentiel de type B, un type A avec détection DC appropriée ou une autre combinaison conforme ; elle dépend de la borne et de toute la chaîne de protection. La notice du fabricant reste indispensable.",[16,850,851,852,103],{},"Les bornes bidirectionnelles, ou techniquement capables de l'être, ajoutent une question de raccordement au réseau. Synergrid indique qu'elles relèvent de C10\u002F11 édition 2.4 et nécessitent une homologation C10\u002F26. Les chargeurs strictement unidirectionnels, du réseau vers le véhicule, ne nécessitent pas une homologation C10\u002F26 du seul fait qu'ils rechargent une voiture. Cette distinction figure sur la ",[32,853,855],{"href":367,"rel":854},[36],"page Synergrid des unités de production décentralisée",[88,857,859],{"id":858},"salles-de-bains","Salles de bains",[16,861,862],{},"Les salles de bains et de douches restent des emplacements spéciaux. Les volumes, indices IP, matériels admis et protections différentielles doivent être vérifiés dans le chapitre 7.1 de la version coordonnée. La présentation officielle de la modification 2026 ne justifie pas l'affirmation générale d'un « nouveau volume 3 ». De même, IPX5 n'est pas une exigence inconditionnelle pour le volume 1 : le degré de protection dépend notamment de l'emploi éventuel de jets d'eau pour le nettoyage. Il faut relever la géométrie réelle et la sortie d'eau fixe, plutôt que reproduire un dessin simplifié trouvé en ligne.",[88,864,866],{"id":865},"surtensions-pv-et-documents-numériques","Surtensions, PV et documents numériques",[16,868,869],{},"La protection contre les surtensions, la conception des protections PV et les documents électroniques ne forment pas davantage un paquet de nouvelles obligations 2026. Le Livre 1 contient des principes dont l'application dépend de l'installation, du risque, du matériel et de la date d'exécution. La transmission électronique d'un rapport de contrôle n'est pas, en elle-même, une nouvelle mesure de protection électrique. Le texte en vigueur, les preuves du fabricant et l'analyse professionnelle restent déterminants.",[11,871,873],{"id":872},"comment-déterminer-les-règles-applicables-à-lexistant","Comment déterminer les règles applicables à l'existant",[16,875,876],{},"La question utile n'est pas seulement « Quel âge a le bâtiment ? », mais « Quand chaque partie a-t-elle été réalisée et quels travaux sont entrepris maintenant ? ». Certaines parties existantes peuvent relever de dérogations, tandis qu'un nouveau circuit doit satisfaire aux exigences actuelles. Une modification ou extension importante requiert un contrôle de conformité avant mise en usage ; le contrôle vise les travaux et leurs effets possibles sur la partie inchangée.",[16,878,879,880,884],{},"La ",[32,881,883],{"href":130,"rel":882},[36],"page officielle sur le contrôle des installations domestiques"," cite les principaux cas : avant mise en usage, après modification ou extension importante, pour certains renforcements de puissance, lors de la vente d'une unité d'habitation et périodiquement. Elle donne l'ajout d'une prise sur un circuit existant comme exemple d'extension non importante. La qualification finale dépend néanmoins de la portée réelle des travaux.",[16,886,887],{},"Un dossier de rénovation devrait donc conserver une liste claire des modifications :",[138,889,890,893,896,899,902],{},[62,891,892],{},"relever l'existant et sa période d'exécution connue ou estimée ;",[62,894,895],{},"distinguer les parties neuves et inchangées sur les plans ;",[62,897,898],{},"analyser l'effet d'une nouvelle source, batterie ou borne sur le tableau et les protections ;",[62,900,901],{},"lever les hypothèses avec l'électricien et l'organisme agréé ;",[62,903,904],{},"mettre à jour le schéma unifilaire et le plan de situation après les travaux.",[11,906,908],{"id":907},"ce-que-doit-contenir-le-dossier-présenté-au-contrôle","Ce que doit contenir le dossier présenté au contrôle",[16,910,911],{},"Pour un contrôle domestique, le SPF Economie demande au minimum les schémas unifilaires, les plans de situation et, s'il est disponible, le code EAN du raccordement. Le schéma unifilaire décrit les circuits, leurs interconnexions et les caractéristiques du matériel. Le plan de situation localise tableaux, boîtes de connexion et de dérivation, prises, points lumineux, interrupteurs, machines fixes et sources. Ces plans font partie du dossier avec les rapports de contrôle, les descriptions succinctes des modifications non importantes et les documents techniques, notamment ceux du photovoltaïque.",[16,913,914],{},"Pour une distribution DC, une documentation utile ne se limite pas au nom de l'appareil. Elle précise les références des sources et câbles, tensions assignées, polarité, points de sectionnement, dispositifs de protection, concept de mise à la terre et document fabricant associé. Un schéma lisible ne remplace ni calculs ni mesures, mais permet au propriétaire, à l'installateur et au contrôleur de parler de la même installation.",[11,916,918],{"id":917},"une-méthode-de-vérification-pour-un-projet-en-2026","Une méthode de vérification pour un projet en 2026",[16,920,921],{},"Procédez en trois étapes avant la commande ou la pose.",[16,923,924,927],{},[20,925,926],{},"Confirmer la version réglementaire."," Utilisez l'édition coordonnée applicable à la date prévue des travaux. Un article de blog sert d'orientation et non de source juridique. En cas de doute, la publication du SPF Economie et ses interprétations officielles priment.",[16,929,930,933],{},[20,931,932],{},"Déterminer le champ d'application."," Notez s'il s'agit d'une installation neuve, d'une extension importante, d'une petite modification, d'une vente, d'un contrôle périodique ou d'un renforcement. Pour une borne, définissez aussi le sens du flux d'énergie : la capacité bidirectionnelle peut déclencher des obligations réseau absentes d'un chargeur unidirectionnel.",[16,935,936,939],{},[20,937,938],{},"Rassembler les preuves."," Conservez le choix des câbles et protections, les notices, les mesures et les plans. Pour les composants DC, les fiches doivent traiter de la mise à la terre admise, du comportement aux courants de défaut et du sectionnement. Sans ces données, un dessin visuellement complet ne constitue pas encore une justification technique complète.",[11,941,943],{"id":942},"ce-que-planelec-apporte-et-ses-limites","Ce que PlanElec apporte, et ses limites",[16,945,946],{},"PlanElec accompagne le parcours du plan d'étage et de la topologie électrique vers le schéma unifilaire, le plan de situation et l'export PDF. Son autocontrôle assisté par logiciel signale des problèmes pris en charge et déductibles des données saisies. Il ne constitue pas une attestation de conformité et ne remplace ni mesures, ni documents fabricant, ni conditions sur site.",[16,948,949,950,952],{},"Le texte réglementaire complet documenté correspond au Livre 1 V06, applicable depuis le ",[20,951,784],{},". La validation du produit n'en traduit toutefois qu'un sous-ensemble documenté en règles automatisées. Les schémas DC TN, TT et IT mis à la terre, les rôles de leurs conducteurs et la logique de protection associée ne sont notamment pas encore modélisés dans leur totalité. Un tel projet exige donc une étude professionnelle, les preuves du matériel et le contrôle officiel. PlanElec aide à structurer des informations cohérentes ; seul un organisme agréé rend l'appréciation officielle.",[11,954,956],{"id":955},"en-résumé","En résumé",[16,958,959],{},"La nouveauté 2026 vérifiable est l'intégration systématique des schémas DC mis à la terre dans le Livre 1. Elle n'impose pas une rénovation générale de chaque logement existant et ne crée pas un paquet unique de nouvelles obligations pour bornes, salles de bains, SPD et documents numériques. Qualifiez d'abord les travaux, consultez le texte officiel actuel et documentez clairement les parties AC et DC. Vous fournissez ainsi une base solide à l'électricien et au contrôleur sans anticiper le résultat du contrôle.",[16,961,962],{},[32,963,964],{"href":233},"Structurer votre documentation électrique avec PlanElec →",{"title":236,"searchDepth":237,"depth":237,"links":966},[967,968,969,974,975,976,977,978],{"id":777,"depth":237,"text":778},{"id":807,"depth":237,"text":808},{"id":840,"depth":237,"text":841,"children":970},[971,972,973],{"id":844,"depth":244,"text":845},{"id":858,"depth":244,"text":859},{"id":865,"depth":244,"text":866},{"id":872,"depth":237,"text":873},{"id":907,"depth":237,"text":908},{"id":917,"depth":237,"text":918},{"id":942,"depth":237,"text":943},{"id":955,"depth":237,"text":956},"Ce qui a réellement changé dans le RGIE au 1er avril 2026 et comment en mesurer les effets sur l'étude, le dossier et le contrôle.","fr",{},"\u002Fblog\u002Farei-regulations-2026.fr",{"title":772,"description":979},"reglementations-rgie-2026","blog\u002Farei-regulations-2026.fr",[269,270,987,988,989,990,991,992,993,994,995],"réglementation 2026","réglementations électriques","courant continu","contrôle électrique","schéma unifilaire","plan de situation","borne de recharge","photovoltaïque","Belgique","oGYLqia3bZYZFLt2kW3wU3YYxFm41FM5waVXonObHwM",{"id":4,"title":5,"articleId":6,"body":998,"category":253,"date":254,"description":255,"extension":256,"lastUpdated":257,"locale":258,"meta":1147,"navigation":260,"path":261,"publishDate":262,"readTime":263,"refreshInterval":264,"seo":1148,"slug":266,"stem":267,"tags":1149,"__hash__":280},{"type":8,"value":999,"toc":1132},[1000,1002,1006,1016,1018,1020,1022,1024,1038,1040,1042,1044,1046,1051,1053,1055,1057,1059,1061,1063,1068,1070,1082,1084,1086,1088,1090,1092,1096,1100,1104,1106,1108,1110,1112,1114,1116,1118,1120,1124,1126,1128],[11,1001,14],{"id":13},[16,1003,18,1004,23],{},[20,1005,22],{},[16,1007,26,1008,30,1010,38,1013,44],{},[20,1009,29],{},[32,1011,37],{"href":34,"rel":1012},[36],[32,1014,43],{"href":41,"rel":1015},[36],[16,1017,47],{},[11,1019,51],{"id":50},[16,1021,54],{},[16,1023,57],{},[59,1025,1026,1028,1030,1032,1034,1036],{},[62,1027,64],{},[62,1029,67],{},[62,1031,70],{},[62,1033,73],{},[62,1035,76],{},[62,1037,79],{},[16,1039,82],{},[11,1041,86],{"id":85},[88,1043,91],{"id":90},[16,1045,94],{},[16,1047,97,1048,103],{},[32,1049,102],{"href":100,"rel":1050},[36],[88,1052,107],{"id":106},[16,1054,110],{},[88,1056,114],{"id":113},[16,1058,117],{},[11,1060,121],{"id":120},[16,1062,124],{},[16,1064,127,1065,133],{},[32,1066,132],{"href":130,"rel":1067},[36],[16,1069,136],{},[138,1071,1072,1074,1076,1078,1080],{},[62,1073,142],{},[62,1075,145],{},[62,1077,148],{},[62,1079,151],{},[62,1081,154],{},[11,1083,158],{"id":157},[16,1085,161],{},[16,1087,164],{},[11,1089,168],{"id":167},[16,1091,171],{},[16,1093,1094,177],{},[20,1095,176],{},[16,1097,1098,183],{},[20,1099,182],{},[16,1101,1102,189],{},[20,1103,188],{},[11,1105,193],{"id":192},[16,1107,196],{},[16,1109,199],{},[16,1111,202],{},[16,1113,205],{},[16,1115,208],{},[11,1117,212],{"id":211},[16,1119,215],{},[16,1121,218,1122,221],{},[20,1123,22],{},[11,1125,225],{"id":224},[16,1127,228],{},[16,1129,1130],{},[32,1131,234],{"href":233},{"title":236,"searchDepth":237,"depth":237,"links":1133},[1134,1135,1136,1141,1142,1143,1144,1145,1146],{"id":13,"depth":237,"text":14},{"id":50,"depth":237,"text":51},{"id":85,"depth":237,"text":86,"children":1137},[1138,1139,1140],{"id":90,"depth":244,"text":91},{"id":106,"depth":244,"text":107},{"id":113,"depth":244,"text":114},{"id":120,"depth":237,"text":121},{"id":157,"depth":237,"text":158},{"id":167,"depth":237,"text":168},{"id":192,"depth":237,"text":193},{"id":211,"depth":237,"text":212},{"id":224,"depth":237,"text":225},{},{"title":5,"description":255},[269,270,271,272,273,274,275,276,277,278,279],1788389248646]